Listing for all primes seeking assistance with project 03-1G2704. 4 results found.
Contractor: Martin Brothers Construction Contact: Connie Dennis
Address: 8801 Folsom Blvd Suite 260 Sacramento CA 95826
Phone: 916-381-0911 Fax: 916-381-1447 Email: cdennis@martinbrothers.net
Services needed: Martin Brothers Construction is requesting quotes from all qualified subcontractors and suppliers including certified SBE / DVBE firms for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TREATED WOOD WASTE, SHOULDER BACKING, CRACK TREATMENT, PREPAVING INERTIAL PROFILER, PREPAVING GRINDING DAY, HOT MIX ASPHALT (TYPE A), MINOR HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE F), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT DELINEATOR (CLASS 1), PAVEMENT MARKER (RETROREFLECTIVE), MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3), 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MODIFYING EXISTING ELECTRICAL SYSTEM,TRUCKING AND SUPPLIER QUOTES on all Required Materials per Project Plans & Specifications. Quotations will be broken down into comparable packages as reasonably necessary. Martin Brothers will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Martin Brothers Construction is signatory to Operating Engineers, Cement Masons and Laborers. 100% performance and payment bonds may be required for the full amount of subcontract price. Martin Brothers Construction will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Martin Brother?s requirements and will be required to sign the standard Martin Brothers Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Plans and specifications are available for viewing at our office located at 8801 Folsom Blvd Suite 260, Sacramento, CA and on the CDOT website. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Martin Brothers Construction intends to work cooperatively with all qualified firms seeking work on this project. Martin Brothers Construction is an equal opportunity employer
Date posted: 11/06/2018
Contractor: DeSilva Gates Construction Contact: Jim Yackley
Address: 11555 Dublin Blvd., Dublin, CA 94568
Phone: 925-829-9220 Fax: 925-803-4263 Email: dgcestimating@desilvagates.com
Services needed: DeSilva Gates Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE firms for the following types of work, including but not limited to: Cold Plane, Construction Area Signs, Crack Treatment, Electrical, Erosion Control, HMA Dike, Prepaving Inertial Profiler, Prepaving Grinding, Rumble Strip, Roadside Signs, Striping and Pavement Markers, WPCP Prep, Vegetation Control Concrete, Trucking, Sweeping, Water Trucks, Erosion Control Materials, Shoulder Backing Material, HMA Material, RHMA Material and Tack Coat Material.
Requirements: DeSilva Gates is signatory to Operating Engineers and Laborers unions. 100% performance and payment bonds may be required for the full amount of subcontract price. DeSilva Gates will pay for bond premium up to 2%. Subcontractors must possess current insurance and worker?s compensation coverage meeting DeSilva Gates Construction?s requirements. Subcontractor will be required to sign the standard DeSilva Gates Construction Subcontract Agreement. A copy of the agreement can be obtained from our estimator. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Plans and specifications are available for viewing at our Dublin office. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. DeSilva Gates intends to work cooperatively with all qualified firms seeking work on this project. DeSilva Gates is an equal opportunity employer.
Date posted: 11/09/2018
Contractor: Granite Construction Company Contact: Bill Lauesen
Address: 4001 Bradshaw Avenue Sacramento, CA 95827
Phone: 916-855-4536 Fax: 916-369-0429 Email: bill.lauesen@gcinc.com
Services needed: Granite Construction Company (Granite) and Equal Opportunity Business Employer is requesting quotes from all qualified subcontractors and suppliers including DVBE firms to bid. Items of work/ but not limited to: Lead Compliance Plan, CAS, Traffic Control device rental and services, WPCP, Inlet Protection & Check Dam materials, MBGR, Crack Treatment, Prepaving Inertial Profiler, Prepaving Grinding Day, Operated Milling Machine, HMA & RHMA-OG buy/haul/place, Place Dike, Tack Coat buy/haul/spread, delineators, Thermo Striping & Pavement Markers, Shoulder backing buy/haul/place, Rumble Strip, Electrical Work
Requirements: Requirements: Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 2%. This will be a prevailing wage job. Subcontractors must possess a current contractor?s license, DIR registration number, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Granite intends to work cooperatively with all qualified firms seeking work on this project. If assistance is needed in obtaining bonds, lines of credit, insurance, necessary equipment, materials, supplies or any other related services we encourage you to contact the Estimator, the local Small Business Development Center Network (www.californiasbdc.org) and/or the Minority Business Development Center (www.mbda.gov). Department of Industrial Relations (DIR) Number and Current License Number MUST BE ON QUOTE Scopes are required 48 hours prior to bid and Quotes required 24 hours before bid day If you have any questions regarding this project, please contact: bill.lauesen@gcinc.com or 916-855-4536
Date posted: 11/12/2018
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Sean Heraty
Address: 400 Sunrise Avenue, Suite 300 Roseville, CA 95661
Phone: 916-757-6400 Fax: 916-757-6499 Email: SHeraty@teichert.com
Services needed: : Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Construction Area Signs, Plane Asphalt Concrete, Remove Bridge Item, Temporary Erosion Control, Asphalt Concrete, Paving Asphalt Concrete Dike & Misc., Clean & Seal Pavement Joints ? Rout & Seal Cracks, Metal Bean Guard Railing, Thermoplastic Striping & Marking, Detector Loops, Asphalt Supplier (Bulk Item), LEAD Compliance, SWPPP Planning, Bottom; Transfer; Super 10; and End Dump Trucks, Water Truck, Asphalt Oil Tanker, Street Sweeping and Truck.
Requirements: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in Placer County near Sierra College Boulevard to Penryn Rock Springs Undercrossing ? Contract 03-1G2704 Bid Date: 12/11/18 @ 2:00 PM Docs & Plans Available from Caltrans http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php Estimate: $4,520,000 Duration: 50 Working Days Agency Goals: 3% DVBE . Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DVBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DVBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DVBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DVBE's available from: *** All Subcontractor Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Date posted: 11/16/2018