Listing for all primes seeking assistance with project 03-0G5304. 2 results found.
Contractor: Knife River Construction Contact: Andy Lanier
Address: 1764 Skyway Chico, Ca 95928
Phone: 530-891-6555 Fax: 530-894-6220 Email: andy.lanier@kniferiver.com
Services needed: Knife River Construction is requesting quotes from all qualified subcontractors and suppliers including certified DVBE/SBE firms for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, SHOULDER BACKING, ASPHALTIC EMULSION (FOG SEAL COAT), PREPAVING INERTIAL PROFILER, MINOR HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE), DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE OVERSIDE DRAIN, PAVEMENT MARKER (RETROREFLECTIVE), MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), END ANCHOR ASSEMBLY (TYPE SFT), TYPE SOFTSTOP TERMINAL SYSTEM, SALVAGE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MODIFYING EXISTING ELECTRICAL SYSTEM, all trucking and supply of materials.
Requirements: Knife River Construction is an Equal Opportunity Employer and is signatory to Operating Engineers, Laborers and Teamsters. 100% payment and performance bonds may be required for full amount of subcontractor price. All subcontractors must be licensed and have liability insurance and workers compensation insurance meeting Knife River Construction's requirements. Knife River Construction is willing to assist with obtaining bonding, insurance, equipment and materials and is willing to break down items into economically feasible packages to encourage participation.
Date posted: 10/03/2017
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Sean Heraty
Address: 400 Sunrise Avenue, Suite 300 Roseville, CA 95661
Phone: 916-757-6400 Fax: 916-757-6499 Email: SHeraty@teichert.com
Services needed: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in Butte County near Oroville from 0.4 mile North of Garden Drive Overcrossing to Campbell Creek Overflow Bridge Bid Date: 10/17/17 @ 2:00PM Docs & Plans Available from Caltrans Estimate: $1,460,000 Completion: 40 Working Days Requesting: DVBE Goal ? 3% Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Construction Area Signs, Traffic Control System, Plane Asphalt Concrete, Irrigation System, Metal Beam Guard Railing, Lead Compliance, SWPP Planning, Bottom; Transfer; End Dump Trucks, Water Truck, Asphalt Oil Tankers and Street Sweeping Truck. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DVBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DVBE?s are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DVBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DVBE's available from: *** All Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Requirements:
Date posted: 10/09/2017