Listing for all primes seeking assistance with project 03-0C4724. 10 results found.
Contractor: Argonaut Constructors Contact: Christer Berglund
Address: 360 Sutton Place Santa Rosa, CA 95407
Phone: 707-542-4862 Fax: 707-542-4897 Email: christerb@argonautconstructors.com
Services needed: Argonaut Constructors, (Argonaut) an equal opportunity employer, is requesting qualified minority DBE subcontractors and suppliers to submit bids for your trade specialty for the project listed below. Your firm must be currently certified as a DBE firm with an agency acceptable to Caltrans. PLEASE SUBMIT A COPY OF YOUR CURRENT CERTIFICATION WITH YOUR BID. Argonaut is requesting quotes from all Minority and Non-Minority Subcontractors and Suppliers including, but not limited to Construction area signs, lead compliance plan, WPCP, trucking, water trucks, HMA material supplier, tack oil supplier, traffic control, jobsite management, temporary items (concrete washout, cover, check dam, drainage inlet protection, fiber roll, silt fence, construction entrance, creek diversion system, high visibility fence, hydraulic mulch, erosion central), aggregate material supplier (aggregate base), 4?, 6? 8? and 12? thermoplastic striping and pavement marking installation and removal, minor concrete (island paving, driveway, sidewalk, curb ramp, vegetation control) modify existing electrical system, signal and lighting system, street sweeping, cold plane asphalt, adjust road way items, pavement markers, install midwest guardrail system, salvage existing guardrail, guard rail delineator, reset, remove and relocate roadside signs and mailboxes, portable changeable message signs, type III barricade, traffic plastic drum, temporary railing (k-rail), alternative temporary crash cushion, rain event action plan, storm water sampling and analysis, storm water annual report, treated wood waste, fertilizer, plant group M & A, wood mulch and rock mulch, water release assy., erosion control, data core, structural concrete, concrete pavement, bar reinforcing steel, bridge removal, alternative pipe culvert, concrete backfill, reinforced concrete pipe, rock slope protection rock and fabric, curb & gutter, detectable warning surface, pre-post construction survey, misc. iron & steel, fencing BW & CL install and removal, delineator, milepost marker, culvert marker, object marker, aluminum signage, cable railing, gabion baskets.
Requirements: : Note: Bids may be faxed to the number listed below. Please make sure that prior to bid time your quotation is received by our company. Scope letters should be submitted the day before the bid date. Bonds may be required: 100% Performance and 100 % Payment for the full amount of subcontractor?s price. Surety companies will have to be approved by Argonaut Constructors (Argonaut). Argonaut may pay up to 1.5 % of the bond premium. Union signatory will be required on this project. Argonaut will offer assistance in obtaining bonding, lines of credit, insurance, equipment or supplies. Argonaut is willing to break down items into economically feasible packages and we are willing to break out any portion of work to encourage participation. Argonaut?s listing of a subcontractor is not an acceptance of any or all of that subcontractor?s conditions, qualifications, exclusions or exceptions included in the subcontractor?s bid proposal. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Argonaut is relying on the price submitted in the subcontractor?s proposal as all-inclusive price for its trade scope found in the plans and specifications regardless of any qualifying language in the proposal. Plans may be reviewed at our office in Santa Rosa or they may be obtained through Caltrans at http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php , and viewed local plan rooms, builder?s exchanges such as the North Coast Builders Exchange and California Builders Exchange. Argonaut Constructors is an equal opportunity employer , Argonaut Constructors P. O. Box 639/360 Sutton Place Santa Rosa, CA 95402/95407 Telephone: 707-542-4862/Fax:707-542-4897
Date posted: 03/20/2018
Contractor: Team Ghilotti, Inc. Contact: Abel Canlas
Address: 2531 Petaluma Blvd. South Petaluma, CA
Phone: 707-763-8700 Fax: 707-763-8711 Email: abelc@teamghilotti.com
Services needed: WE ARE SEEKING QUALIFIED AND CURRENTLY CERTIFIED DBE SUBCONTRACTORS, SERVICE PROVIDERS, SUPPLIERS & TRUCKERS FOR THE FOLLOWING ITEMS BUT NOT LIMITED TO: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY TRAFFIC STRIPE/MARKING/PLASTIC DRUM/MARKER/TRAFFIC STRIPE REMOVAL, PCMS, TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, SWPPP PLAN/RAIN EVENT/SAMPLING/ANALYSIS/ANNUAL REPORT/TEMPORARY EROSION CONTROL/HYDRAULIC MULCH/COVER/CHECKDAM/DOI PROTECTION/FIBER ROLL/SILTFENCE/CONCRETE ENTRANCE, STREET SWEEPING. TEMPORARY CREEK DIVERSION SYSTEM, TEMPORARY CONCRETEWASHOUT, TREATED WOOD WASTE, TEMPORARY HIGH-VISIBILITY FENCE, CLEAFING & GRUBBING, PLANT (GROUP M & A)/WODOD MULCH/ROCKMULCH, WATER ASSY TUBE & GEL PACK, PERMANENT EROSION CONTROL DRY SEEED/BONDED GFIBER MATRIX, ROLLED EROSION (JUTE MESH)/NETTING/FIBER ROLL/COMPOST/ESTABLISHMENT WORK, CLASS 2 AGGREGATE BASE (CY), HMA, RUBBERIZED HMA (GAP GRADED), DATE CORE, MISC HMA, TACK COAT, COLD PLANE ASPHALT, CONTINUOUSLY REINFORCED CONCRETE PAVEMENT (TEXTURED PAVING), STRUCTURA CONCRETE, BOX CULVERT/ HEADWALL/ DRAINAGE INLET, MINOR CONCRETE (MINOR STRUCTURE), BAR REINFORCING STEEL / (BOX CULVERT), BRIDGE REMOVAL, 12"/18?/24?/30?/48? ALTERNATIVE PIPE CULVERT, CONCRETE BACKFILL (PIPE TRENCH). 12"/18?/24? ALTERNATIVE FLARED END SECTION, REMOVAL CULVERT/INLET/HEADWALL/DI STRUCTURE/FLARED END SECTION, ADJSUT MH TO GRADE, REMOVE BOX CULVERT WINGWALL, RSP (N0.3 & 60 LB METHOD B, GABION, RSP FABRIC, MINOR CONCRETEPRE-POST CONST. SURVEY, MISC IRON & STELL, FENCE & GATE & REMOVAL, DELINEATOR, MARKERS& MARKERS REMOVAL, ROAD SIGNS & ROADSIGNS REMOVAL & RELOCATION, ALUMINUM SIGNS /SHEETINGS, MIDWEST GUARDRAIL,/VEGETATION CONTROL/RAILING/END ANCHOR/FLARED TERMINAL/SALVAGE GUARDRAIL, THERMO MARKINGS/STRIPS INCUDING REMOVAL, RUMBLE STRIP, SIGNAL & LIGHTING SYTEM, MODIFYING EXISTING LIGHTING SYSTEM AND ALL OTHER RELATED TRADES AND ITEMS OF WORK INCLUDING PARTIAL ITEMS THAT ARE REQUIRED BY THE PROJECT PLANS & SPECIFICATIONS. PLEASE SUBMIT A COPY OF YOUR CURRENT CERTIFICATION WITH YOU QUOTE AND ALSO PROVIDE YOUR LICENSE#/DIR#/DBE#
Requirements: The Plans and Special Provisions are available at the State of California, Department of Transportation website: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/project.php or by contacting our estimating department. Team Ghilotti, Inc. is an Equal Opportunity Performance and payment bonds may be required. Please call for assistance with bonding and insurance or obtaining necessary equipment, supplies or material for this project.
Date posted: 03/22/2018
Contractor: DeSilva Gates Construction Contact: Eric Allred
Address: 11555 Dublin Blvd., Dublin, CA 94568
Phone: 925-829-9220 Fax: 925-803-4263 Email: dgcestimating@desilvagates.com
Services needed: DeSilva Gates Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE firms for the following types of work, including but not limited to: Box Culvert, Bridge Removal, Clearing & Grubbing, Cold Plane, Construction Area Signs, Electrical, Erosion Control, Fence, Guardrailing, Landscaping, Minor Concrete, Minor Concrete Structures, PCC Paving, Rumble Strip, Roadside Signs, Striping and Pavement Markers, SWPPP Prep, Underground Work, Vegetation Control Concrete, Trucking, Sweeping, Water Trucks, Erosion Control Materials, Aggregate Base Material, HMA Material, RHMA Material and Tack Coat Material.
Requirements: DeSilva Gates is signatory to Operating Engineers and Laborers unions. 100% performance and payment bonds may be required for the full amount of subcontract price. DeSilva Gates will pay for bond premium up to 2%. Subcontractors must possess current insurance and worker?s compensation coverage meeting DeSilva Gates Construction?s requirements. Subcontractor will be required to sign the standard DeSilva Gates Construction Subcontract Agreement. A copy of the agreement can be obtained from our estimator. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Plans and specifications are available for viewing at our Dublin office. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. DeSilva Gates intends to work cooperatively with all qualified firms seeking work on this project. DeSilva Gates is an equal opportunity employer.
Date posted: 03/26/2018
Contractor: A. Teichert & Son, Inc. dba Teichert Construction Contact: Jason Theriault
Address: 400 Sunrise Avenue, Suite 300 Roseville, CA 95661
Phone: 916-757-6400 Fax: 916-757-6499 Email: JTheriault@teichert.com
Services needed: Request for qualified bids from Subcontractors, Suppliers & Truckers for the following project: Project: Construction on State Highway in Yolo County near Esparto from 0.3 mile East of County Road 79 and from 0.1 mile East of Plainfield Station Street to 0.1 mile East of County Road 90 ? Contract No. 03-0C4724 Bid Date: 5/9/18 @ 2:00 PM Docs & Plans Available from Caltrans http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php Estimate: $20,300,000 Duration: Not less than 140 Working Days and not more than 200 Working Days Agency Goals: 13% DBE Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for Oil Supplier, Concrete Supplier, Reinforcing Bar Supplier, Steel Supplier, Pipe Supplier, Drainage Systems Supplier, Storm Water Systems Supplier, Construction Area Signs, Remove Bridge Item, Clearing & Grubbing, Structure Excavation, Structure Backfill, Highway Planting, Soil Amendments, Hydroseeding, Erosion Control, Irrigation System, Temporary Erosion Control, Place Asphalt Concrete & Dike Misc., Portland Cement & Concrete Structure, Minor Concrete Structure, Reinforcing Steel, Roadside Sign, Concrete Curb & Sidewalk-Misc., Misc. Iron & Steel Frame, Cover & Grate, Fencing, Temporary Fencing, Metal Beam Guard Railing, Metal Railing, Thermoplastic Striping & Marking, Pavement Marking, Signal & Lighting, Consultant, Environmental, Materials Testing Services, Land Surveyor, LEAD Compliance, SWPPP Planning, Bottom, Transfer, Super 10, and End Dump Trucks, Flat Bed Trucking, Water Truck, Asphalt Oil Tankers, Street Sweeping Truck, Land Surveying and Demolition. Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the municipality listed above and the Teichert?s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DBE's available from: *** All Subcontractor Quotes must have the Department of Industrial Relations # to be ACCEPTED ***
Requirements:
Date posted: 04/05/2018
Contractor: Granite Construction Company Contact: Scott Edwards
Address: 4001 Bradshaw Avenue Sacramento, CA 95827
Phone: 916-855-4531 Fax: 916-369-0429 Email: scott.edwards@gcinc.com
Services needed: Granite Construction Company (Granite) An Equal Opportunity Business Employer is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms Scope of work: Add turn lanes & roundabout, align curve, widen shoulder, culvert work Items of work including but not limited to: LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD (LS), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE , TRAFFIC PLASTIC DRUM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) TEMPORARY: TRAFFIC STRIPE (TAPE), PVEMENT MARKINGS (TAPE), TRAFFIC STRIPE (PAINT), TRAFFIC PLASTIC DRUM, PAVEMENT MARKER, RAILING (TYPE K), ALTERNATIVE CRASH CUSHION, HYDRAULIC MULCH (BONDED FIBER MATRIX)/COVER/CHECK DAM/DRAINAGE INLET PROTECTION, FIBER ROLL, SILT FENCE, CONSTRUCTION ENTRANCE, CREEK DIVERSION SYSTEM, CONCRETE WASHOUT, HIGH-VISIBILITY FENCE STREET SWEEPING, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, CLEARING AND GRUBBING (LS),ROADWAY EXCAVATION, PACKET FERTILIZER, PLANT (GROUP A &M), WOOD/ROCK MULCH, TIME RELEASE WATER ASSEMBLY TUBE, TIME RELEASE WATER ASSEMBLY GEL PACK, MOVE-IN/MOVE-OUT (EROSION CONTROL), DRY SEED (SQFT), BONDED FIBER MATRIX (SQFT), ROLLED EROSION CONTROL PRODUCT (JUTE MESH), ROLLED EROSION CONTROL PRODUCT (NETTING), FIBER ROLLS, COMPOST (CY), PERMANENT EROSION CONTROL ESTABLISHMENT WORK, CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), DATA CORE, PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, CONTINUOUSLY REINFORCED CONCRETE PAVEMENT (TEXTURED PAVING), STRUCTURAL CONCRETE, BOX CULVERT, STRUCTURAL CONCRETE, HEADWALL, STRUCTURAL CONCRETE, DRAINAGE INLET, MINOR CONCRETE (MINOR STRUCTURE), BAR REINFORCING STEEL, BAR REINFORCING STEEL (BOX CULVERT), BRIDGE REMOVAL, ALTERNATIVE PIPE CULVERTS, CONCRETE BACKFILL (PIPE TRENCH), 24" REINFORCED CONCRETE PIPE, CONCRETE/ALTERNATIVE FLARED END SECTIONS, REMOVE CULVERT (LF), REMOVE: INLETS, HEADWALL, DRAINAGE JUNCTION STRUCTURE, FLARED END SECTION, BOX CULVERT WINGWALL (LF), GABION, THERMOPLASTIC TRAFFIC STRIPE/MARKINGS ADJUST MANHOLES, ROCK SLOPE PROTECTION, GABION, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), DETECTABLE WARNING SURFACE, MINOR CONCRETE (VARIOUS), PRE/POST CONSTRUCTION SURVEYS, MISCELLANEOUS IRON AND STEEL, RELOCATE MAILBOX, FURNISH/INSTALL/RESET/REMOVE/RELOCATE FENCES, SIGNS (VARIOUS), REMOVE GATE, FURNISH SINGLE SHEET ALUMINUM SIGNS, RETROREFLECTIVE SHEETING (TYPE XI), MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), RAILINGS, END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE FLARED TERMINAL SYSTEM, SALVAGE GUARDRAIL, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), SIGNAL AND LIGHTING SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM, MOBILIZATION
Requirements: Granite will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Quotations will be broken down into comparable packages as reasonably necessary to increase overall DBE participation. Plans and specifications are available through the contracting agency website. (Viewing only capability available at our Bradshaw location) Requirements: Granite is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Granite will pay for bond premium up to 2%. This will be a prevailing wage job. Subcontractors must possess a current contractor?s license, DIR registration number, insurance and worker?s compensation coverage meeting Granite?s requirements and will be required to sign the standard Granite Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Granite intends to work cooperatively with all qualified firms seeking work on this project. If assistance is needed in obtaining bonds, lines of credit, insurance, necessary equipment, materials, supplies or any other related services we encourage you to contact the Estimator, the local Small Business Development Center Network (www.californiasbdc.org) and/or the Minority Business Development Center (www.mbda.gov). Department of Industrial Relations (DIR) Number and Current License Number MUST BE ON QUOTE
Date posted: 04/07/2018
Contractor: Goodfellow Bros. California LLC Contact: Shawna Pilkington
Address: 50 Contractors Street Livermore, CA 94551
Phone: 925-449-5764 Fax: 925-449-5875 Email: shawnap@goodfellowbros.com
Services needed: Goodfellow Bros. California is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following types of work, including but not limited to: Box Culvert, Bridge Removal, Clearing & Grubbing, Cold Plane, Construction Area Signs, Electrical, Erosion Control, Fence, Guardrailing, Landscaping, Minor Concrete, Minor Concrete Structures, PCC Paving, Rumble Strip, Roadside Signs, Striping and Pavement Markers, SWPPP Prep, Underground Work, Vegetation Control Concrete, Trucking, Sweeping, Water Trucks, Erosion Control Materials, Aggregate Base Material, HMA Material, RHMA Material and Tack Coat Material.
Requirements: Goodfellow Bros California is signatory to Operating Engineers and Laborers unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Goodfellow Bros California will pay for bond premium up to 2%. Subcontractors must possess current insurance and worker?s compensation coverage meeting Goodfellow Bros California?s requirements. Subcontractor must also have a current DIR registration. Subcontractor will be required to sign the standard Goodfellow Bros California Subcontract Agreement. A copy of the agreement can be obtained from our estimator. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Plans and specifications are available for viewing at our Livermore office or can be downloaded from the Caltrans website. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Goodfellow Bros California intends to work cooperatively with all qualified firms seeking work on this project. Goodfellow Bros California is an equal opportunity employer.
Date posted: 04/12/2018
Contractor: Ghilotti Construction Company, Inc. Contact: Jim Petnic or Rod Barber
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: jimp@ghilotti.com or rod@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: FABRIC & OILS, CAS, TRAFFIC CONTROL, RESET-ADJUST ROADWAY ITEMS, COLD PLANE AC, DEMOLITION / BRIDGE REMOVAL, CLEAR & GRUB, LANDSCAPE / HIGHWAY PLANTING, EROSION CONTROL, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, REINFORCING STEEL, ROADSIDE SIGNS, CONCRETE CURB & GUTTER ? MISC., FENCING, METAL RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, SIGNAL & LIGHTING, STORM DRAIN (UNDERGROUND), CONTINUOUSLY REINFORCED CONCRETE PAVEMENT (TEXTURED PAVING), MODIFY EXISTING ELECTRICAL SYSTEM, STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Jim Petnic and Mr. Rod Barber (707/585-1221 / jimp@ghilotti.com / rod@ghilotti.com) are the estimators for this project and are available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. GCC will pay bond premiums up to 1 1/2% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form 'CG-2010-1185' or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Date posted: 04/13/2018
Contractor: Martin Brothers Construction Contact: Connie Dennis
Address: 8801 Folsom Blvd Suite 260 Sacramento CA 95826
Phone: 916-381-0911 Fax: 916-381-1447 Email: cdennis@martinbrothers.net
Services needed: Martin Brothers Construction is requesting quotes from all qualified subcontractors and suppliers including certified SBE / DBE firms for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMP TRAFFIC STRIPE(TAPE/PAINT), TEMP PAVEMENT MARKING (TAPE), TRAFFIC PLASTIC DRUM, TEMP PAVEMENT MARKER, PORTABLE CHANGEABLE MESSAGE SIGN, TEMP RAILING (TYPE K), ALTERNATIVE TEMP CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE SWPPP, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMP EROSION CONTROL), TEMP HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CREEK DIVERSION SYSTEM, TEMP CONCRETE WASHOUT, REMOVE YELLOW THERMO TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, PACKET FERTILIZER, PLANT (GROUP M) (GROUP A), WOOD MULCH, ROCK MULCH, TIME RELEASE WATER ASSEMBLY TUBE, TIME RELEASE WATER ASSEMBLY GEL PACK, MOVE-IN/MOVE-OUT (EROSION CONTROL), DRY SEED (SQFT), BONDED FIBER MATRIX (SQFT), ROLLED EROSION CONTROL PRODUCT (JUTE MESH)(NETTING), FIBER ROLLS, COMPOST, PERMANENT EROSION CONTROL ESTABLISHMENT WORK,CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), DATA CORE, PLACE HOT MIX ASPHALT (MISC AREA), TACK COAT, COLD PLANE AC PAVEMENT, CONTINUOUSLY REINFORCED CONCRETE PAVEMENT (TEXTURED PAVING), STRUCTURAL CONCRETE (BOX CULVERT/HEADWALL/DRAINAGE INLET), MINOR CONCRETE (MINOR STRUCTURE), BAR REINFORCING STEEL, BAR REINFORCING STEEL (BOX CULVERT), BRIDGE REMOVAL, 12", 18", 24", 30" 48" ALTERNATIVE PIPE CULVERT, CONCRETE BACKFILL (PIPE TRENCH), 24" REINFORCED CONCRETE PIPE, 24" CONCRETE FLARED END SECTION, 12", 18", 24" ALTERNATIVE FLARED END SECTION, REMOVE CULVERT (LF), REMOVE INLET, REMOVE HEADWALL, REMOVE DRAINAGE JUNCTION STRUCTURE, REMOVE FLARED END SECTION (EA), ADJUST MANHOLE TO GRADE STA "D4" 552+79.2 (MCSD EXPENSE), ADJUST MANHOLE TO GRADE STA "D4" 562+71.2 (STATE EXPENSE), REMOVE BOX CULVERT WINGWALL (LF), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (NO. 3, METHOD B) (CY), REMOVE GABION, GABION, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB AND GUTTER/ISLAND PAVING/DRIVEWAY/SIDEWALK/CURB RAMP, PRE/POST CONSTRUCTION SURVEYS, MISC IRON AND STEEL, RELOCATE MAILBOX, FENCE (TYPE BW, 4-STRAND, METAL POST), CHAIN LINK FENCE (TYPE CL-6, SLATTED), REMOVE FENCE, REMOVE GATE, DELINEATOR (CLASS 1), PAVEMENT MARKER (RETROREFLECTIVE), MILEPOST MARKER, MARKER (CULVERT), OBJECT MARKER (TYPE K-1), OBJECT MARKER (TYPE L-1), REMOVE MARKER (CULVERT), REMOVE ROADSIDE SIGN, RESET ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED), RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN-ONE POST, ROADSIDE SIGN- TWO POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE FLARED TERMINAL SYSTEM, SALVAGE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 4" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3), 12" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 3-3), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), SIGNAL AND LIGHTING SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM, TRUCKING AND SUPPLIER QUOTES on all Required Materials per Project Plans & Specifications. Quotations will be broken down into comparable packages as reasonably necessary. Martin Brothers will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: Martin Brothers Construction is signatory to Operating Engineers, Cement Masons and Laborers. 100% performance and payment bonds may be required for the full amount of subcontract price. Martin Brothers Construction will pay for bond premium up to 1.5%. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Martin Brother?s requirements and will be required to sign the standard Martin Brothers Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the estimator. Plans and specifications are available for viewing at our office located at 8801 Folsom Blvd Suite 260, Sacramento, CA and on the CDOT website. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Martin Brothers Construction intends to work cooperatively with all qualified firms seeking work on this project. Martin Brothers Construction is an equal opportunity employer
Date posted: 04/16/2018
Contractor: O.C. Jones & Sons, Inc. Contact: Jean Sicard
Address: Jean Sicard Berkeley, CA 94710
Phone: 510-526-3424 Fax: 510-526-0990 Email: jsicard@ocjones.com
Services needed: REQUEST FOR DBE SUBCONTRACTORS AND SUPPLIERS We are soliciting quotes for (including but not limited to): Trucking, Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Type III Barricade, Traffic Plastic Drum, Portable Changeable Message Sign, SWPPP, Rain Event Action Plan, Storm Water Sampling & Analysis, Temporary Erosion Control, Sweeping, Treated Wood Waste, Clearing & Grubbing, Roadway Excavation, Planting & Irrigation, Erosion Control, Data Core, Tack Coat, Cold Plane AC, Continuously Reinforced Concrete Pavement, Creek Diversion, Precast Box Culverts, Precast Inlets, Mailboxes, Structural Concrete, Minor Concrete, Bar Reinforcing Steel, Bridge Removal, Pipe Culvert, Adjust Utilities, Rock Slope Protection, Gabion, Pre/Post Construction Surveys, Misc. Iron & Steel, Fencing, Pavement Marker, Object Marker, Roadside Signs, Midwest Guardrail System, Vegetation Control (Minor Concrete), Cable Railing, Striping & Marking, Rumble Strip, Signal & Lighting, Electrical, and Construction Materials
Requirements: An Equal Opportunity Employer 100% Performance & Payment Bonds may be required. Worker?s Compensation Waiver of Subrogation required. Please call OCJ for assistance with bonding, insurance, necessary equipment, material and/or supplies. OCJ is willing to breakout any portion of work to encourage DBE Participation. Plans & Specs are available for viewing at our office or through the Caltrans Website at www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php.
Date posted: 04/18/2018
Contractor: Bay Cities Paving & Grading, Inc. Contact: Russ Olney
Address: 1450 Civic Ct., Bldg. B Concord, Ca 94520
Phone: 925-687-6666 Fax: 925-687-2122 Email: rolney@baycities.us
Services needed: Add turn lanes & roundabout, align curve, widen shoulder, culvert work; Lead compliance plan, develop water supply, construction area signs, traffic control system, type III barricade, temporary traffic stripe (tape), temporary pavement marking (tape), temporary traffic stripe (paint), traffic plastic drum, temporary pavement marker, portable changeable message sign, temporary railing (type k), alternative temporary crash cushion, prepare swppp plan, erosion control, street sweeping, temporary creek diversion system, remove yellow thermoplastic traffic stripe (hazardous waste), treated wood waste, temporary high visibility fence, clearing and grubbing, roadway excavation, landscape, class 2 aggregate base, hot mix asphalt, rubberized hot mix asphalt (gap graded), data core, place hot mix asphalt, tack coat, cold plane asphalt concrete pavement, continuously reinforced concrete pavement (textured paving), structural concrete box culvert, structural concrete headwall, structural concrete drainage inlet, minor concrete (minor structure), bar reinforcing steel, bar reinforcing concrete pavement (textured paving), structural concrete box culvert, structural concrete headwall, bridge removal, alternative pipe culvert, concrete backfill ( pipe trench), reinforced concrete pipe, concrete flared end section, remove culvert, remove inlet, remove headwall, remove drainage structure, adjust manholes, rock slope protection, remove gabion, gabion, detectable warning surface, minor concrete curb and gutter, minor concrete ((island paving), minor concrete (driveway, sidewalk, curb ramp), pre/post construction surveys, fencing, pavement marker, object markers, Midwest guardrail system, cable railing, transition railing, end anchor assembly, alternative flared terminal system, thermoplastic pavement marking (enhanced wet night visibility), remove thermoplastic pavement marking, rumble strip, signal and lighting system, modify existing electrical system.
Requirements: Plans and specifications for the Project are available for review at our office at 1450 Civic Court, Concord, (925) 687-6666 100% Performance, Payment Bonds by an admitted surety naming prime contractor as oblige, in the full amount of the subcontractors bid shall be required. Retention will be withheld if subcontractor fails to provide bonds. Bay Cities Paving & Grading, Inc. will pay bond premium up to 2%. Please be advised, Contractors and Subcontractors must register with the D.I.R (Department of Industrial Relations) in order to bid on public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify the status of your D.I.R. number, please visit: http://www,dir.ca.gov/Public-Works/Contractors.html. Bay Cities Paving & Grading is signatory to the following Unions: Operators, Laborers, Teamsters & Cement Masons. Call Russ Olney for assistance with credit line, bonding, insurance, equipment, supplies and materials Bay Cities Paving & Grading, Inc. is an equal opportunity employer
Date posted: 04/18/2018