Listing for all primes seeking assistance with project 02-4G2404. 7 results found.
Contractor: J. F. Shea Construction, Inc. Contact: Stacy Dutra
Address: 17400 Clear Creek Road Redding, CA 96001
Phone: 530-246-4292 Fax: 530-246-9940 Email: Stacy.Dutra@jfshea.com
Services needed: REQUEST FOR QUALIFIED DBE SUBCONTRACTORS & SUPPLIERS FOR: INVITATION TO BID TO: DBE / ALL QUALIFIED SUBCONTRACTORS & SUPPLIERS WE WOULD APPRECIATE YOUR SUB-BID AND/OR MATERIAL QUOTE FOR THE FOLLOWING PROJECT: State of California Department of Transportation - Caltrans Strengthen and Upgrade Bridges IN SISKIYOU COUNTY ABOUT 5 MILES NORTH OF WEED AT THE NORTH EDGEWOOD OVERHEAD Contract #: 02-4G2404 Engineers Estimate: $4,350,000.00 Bid Date: 10/25/2017 @ 2 PM Goal: 13 % DBE J. F. Shea Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for all items of work, including but not limited to: 1 LEAD COMPLIANCE PLAN 2 PROGRESS SCHEDULE (CRITICAL PATH METHOD) 3 DEVELOP WATER SUPPLY 4 CONSTRUCTION AREA SIGNS 5 TRAFFIC CONTROL SYSTEM 6 TYPE III BARRICADE 7 TEMPORARY TRAFFIC STRIPE (TAPE) 8 TEMPORARY PAVEMENT MARKING (TAPE) 9 CHANNELIZER (SURFACE MOUNTED) 10 TRAFFIC PLASTIC DRUM 11 TEMPORARY PAVEMENT MARKER 12 PORTABLE LIGHTING SYSTEM 13 PORTABLE CHANGEABLE MESSAGE SIGN (LS) 14 TEMPORARY RAILING (TYPE K) 15 ALTERNATIVE TEMPORARY CRASH CUSHION 16 JOB SITE MANAGEMENT 17 PREPARE STORM WATER POLLUTION PREVENTION PLAN 18 RAIN EVENT ACTION PLAN 19 STORM WATER SAMPLING AND ANALYSIS DAY 20 STORM WATER ANNUAL REPORT 21 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) 22 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) 23 TEMPORARY COVER 24 TEMPORARY CHECK DAM 25 TEMPORARY DRAINAGE INLET PROTECTION 26 TEMPORARY FIBER ROLL 27 TEMPORARY CONSTRUCTION ENTRANCE 28 STREET SWEEPING 29 TEMPORARY CONCRETE WASHOUT 30 REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) 31 TREATED WOOD WASTE 32 REMOVE CONCRETE (MISCELLANEOUS) (SQFT) 33 TEMPORARY HIGH-VISIBILITY FENCE 34 CLEARING AND GRUBBING (LS) 35 ROADWAY EXCAVATION 36 IMPORTED BORROW (CY) 37 HYDROMULCH 38 HYDROSEED 39 FINISHING ROADWAY 40 CLASS 2 AGGREGATE BASE (CY) 41 HOT MIX ASPHALT (TYPE A) 42 PLACE HOT MIX ASPHALT DIKE (TYPE F) 43 TACK COAT 44 REMOVE ASPHALT CONCRETE DIKE 45 COLD PLANE ASPHALT CONCRETE PAVEMENT 46(F) STRUCTURAL CONCRETE, BRIDGE 47(F) STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) 48 AGGREGATE BASE (APPROACH SLAB) 49 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R) 50(F) STRUCTURAL CONCRETE, DRAINAGE INLET 51 PAVING NOTCH EXTENSION 52 JOINT SEAL (MR 2") 53(F) BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE) 54 COMPOSITE GIRDER STRENGTHENING 55 BRIDGE REMOVAL (PORTION) 56 12" TEMPORARY CULVERT 57 3" PLASTIC PIPE (EDGE DRAIN OUTLET) 58 REMOVE PIPE (LF) 59 ADJUST FRAME AND GRATE TO GRADE 60 DELINEATOR (CLASS 2) 61 PAVEMENT MARKER (RETROREFLECTIVE-RECESSED) 62 REMOVE ROADSIDE SIGN 63 SALVAGE ROADSIDE SIGN (METAL POST) 64 RELOCATE ROADSIDE SIGN 65 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) 66 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 67 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 68 RETROREFLECTIVE SHEETING (TYPE XI) 69 ROADSIDE SIGN - ONE POST 70 VEGETATION CONTROL (MINOR CONCRETE) 71(F) CHAIN LINK RAILING (TYPE 7 MODIFIED) 72 TRANSITION RAILING (TYPE WB-31) 73(F) CONCRETE BARRIER (TYPE 736 MODIFIED) 74 SALVAGE METAL BRIDGE RAILING 75 SALVAGE GUARDRAIL 76 RELOCATE CRASH CUSHION 77 ADJUST GUARDRAIL 78 MODIFY GUARDRAIL 79 THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) 80 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 81 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 82 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) 83 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) 84 REMOVE THERMOPLASTIC TRAFFIC STRIPE (WATER BLASTING) 85 REMOVE THERMOPLASTIC PAVEMENT MARKING (WATER BLASTING) 86 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT) 87 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION 88 MOBILIZATION
Requirements: J. F. Shea Construction Inc. is a union signatory contractor. Subcontractors must possess a current contractor?s license, insurance coverage and worker?s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at 17400 Clear Creek Road, Redding, Ca. 96001 or call for any additional needed project information. J. F. Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. Women and Minority Employees are encouraged to apply. J. F. SHEA CONSTRUCTION, INC. P.O. Box 494519 - Redding, CA 96049 Phone: (530) 246-4292 Fax: (530) 246-9940 An Equal Opportunity Employer
Date posted: 09/25/2017
Contractor: Golden State Bridge, Inc. Contact: David Riccitiello
Address: 3701 Mallard Drive Benicia, CA 94510
Phone: 925-372-8000 Fax: 925-372-8001 Email: dave@gsbridge.com
Services needed: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Type III Barricade, Temp. Traffic Stripe, Temp. Pavement Marking, Channelizer, Traffic Plastic Drum, Temp. Pavement Marker, Portable Lighting System, Portable Changeable Message Sign, Temp. Railing (Type K), Alternative Temp. Crash Cushion, Prepare SWPPP, Rain Event Action Plan, Storm Water Sampling and Analysis Day, Storm Water Annual Report, Move-In/Move-Out Temp. Erosion Control, Temp. Hydraulic Mulch, Temp. Cover, Temp. Check Dam, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Temp. Construction Entrance, Street Sweeping, Temp. Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe, Treated Wood Waste, Remove Concrete (Misc.), Temp. High-Visibility Fence, Clearing & Grubbing, Roadway Excavation, Imported Borrow, Hydromulch, Hydroseed, Finishing Roadway, Class 2 Aggregate Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike, Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Structural Concrete; Bridge, Aggregate Base, Structural Concrete, Paving Notch Extension, Joint Seal, Rebar, Composite Girder Strengthening, Bridge Removal (Portion), 12 in. Temp. Culvert, 3 in. Plastic Pipe (Edge Drain Outlet), Remove Pipe, Adjust Frame and Grate to Grade, Delineator (Class 2), Pavement Marker, Remove Roadside Sign, Salvage Roadside Sign (Metal Post), Relocate Roadside Sign, Furnish Single Sheet Aluminum Sign, Retroreflective Sheeting (Type XI), Roadside Sign One Post, Vegetation Control (Minor Concrete), Chain Link Railing (Type 7 Mod), Transition Railing (Type WB-31), Concrete Barrier, Salvage Metal Bridge Railing, Salvage Guardrail, Relocate Crash Cushion, Adjust and Modify Guardrail, Thermoplastic Pavement Marking, Thermoplastic Traffic Stripe, Remove Thermoplastic Traffic Stripe, Rumble Strip, Maintain Existing Traffic Management System Elements During Construction.
Requirements: Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000 or dave@gsbridge.com. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
Date posted: 09/25/2017
Contractor: MJ Hughes Construction Contact: Mike Hughes
Address: 836 57th Street Sacramento, CA, 95819
Phone: 916-403-3842 Fax: 916-403-3843 Email: bids@mjhughes.com
Services needed: DBE, paving, guardrail, traffic control, striping, signing, excavation, carbon fiber, ready mix concrete, rebar furnish & install
Requirements: send bids to bids@mjhughes.com
Date posted: 09/27/2017
Contractor: Steelhead Constructors, Inc Contact: Kelly Knight
Address: 2940 Innsbruck Drive Redding, CA 96003
Phone: 5302266400 Fax: 5302266401 Email: kelly@steelheadconstructors.com
Services needed: We are requesting quotes from all qualified subcontractors and suppliers, including all certified DVBE/DBE/MBE/WBE/MB subcontractors. We are soliciting quotes for (including but not limited to): Temporary Traffic Stripe (Tape), Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Hydromulch, Hydroseed, Hot Mix Asphalt (Type A), Furnish Structural Concrete (Polymer) (Fiber), Furnish Structural Concrete, Approach Slab (Type R), Bar Reinforcing Steel (Epoxy Coated), (Bridge), Composite Girder Strengthening, Bridge Removal (Portion), Pavement Marker (Retroreflective-Recessed), Vegetation Control (Minor Concrete), Chain Link Railing (Type 7 Modified), Transition Railing (Type WB-31), Concrete Barrier (Type 736 Modified), Thermoplastic Pavement Markings (Enhanced Wet Night Visibility), 6? Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7), 6? Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6? Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8? Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe (Water Blasting), Remove Thermoplastic Pavement Marking (Water Blasting), 12? Rumble Strip (Asphalt Concrete Pavement), and Maintaining Existing Traffic Management System Elements During Construction. The quotations may be broken down into comparable units as reasonably necessary. Steelhead will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units.
Requirements: Steelhead Constructors, Inc. (Steelhead) will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed on the Caltrans Website, at your local builder?s exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don?t hesitate to call our office. In order that we may give your bid maximum consideration, please supply us with a FAX letter prior to the bid describing the scope of your work. Steelhead is an Equal Employment Opportunity Employer. We encourage and actively solicit proposals from DVBE, DBE, MBE, WBE, DBE and MB subcontractors and suppliers on all our projects. All qualified DVBE, DBE, MBE, WBE, and MB subcontractors must be registered and certified by the California Department of Transportation. Steelhead is signatory to Operating Engineers, Laborers, Carpenters and Cement Masons Unions. All subcontractors must possess a current contractor?s license, insurance, and workers? compensation coverage meeting Steelhead?s requirements and will be required to sign Steelhead?s Subcontract Agreement. Performance and payment bonds up to 100% may be required for the full amount of the subcontract price. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services etc., which may be required by the Owner. Please contact our office and advise us if you are interested in bidding on this project.
Date posted: 09/28/2017
Contractor: Myers and Sons Construction, LP Contact: Marc Vanden
Address: 4600 Northgate Blvd., Suite 100 Sacramento, CA 95834
Phone: 916-283-9950 Fax: 916-614-9520 Email: mvanden@myers-sons.com
Services needed: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADETEMP TRAFFIC CONTROL, LIGHTING, PCMS, K-RAIL, CRASH CUSHION, SWPPP, TEMP EROSION CONTROL, STREET SWEEPING,REMOVE STRIPING (HAZARDOUS WASTE), TREATED WOOD WASTE, REMOVE CONCRETE, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, IMPORTED BORROW, HYDROMULCH, HYDROSEED, FINISHING ROADWAY, CLASS 2 AB, HMA, HMA DIKE, TACK COAT, REMOVE DIKE, COLD PLANE AC PAVEMENT, FURNISH READY MIX, AB, PAVING NOTCH EXTENSION, JOINT SEAL, REBAR, COMPOSITE GIRDER STRENGTHENING, BRIDGE REMOVAL, TEMP CULVERT, PLASTIC PIPE (EDGE DRAIN OUTLET), REMOVE PIPE, ADJUST FRAME AND GRATE TO GRADE, DELINEATOR (CLASS 2), PAVEMENT MARKER, ROADSIDE SIGNS, MINOR CONCRETE, CHAIN LINK RAILING (TYPE 7 MOD), TRANS RAILING, CONCRETE BARRIER (TYPE 736 MOD), THERMOPLASTIC STRIPING & MARKING, REMOVE STRIPING & MARKING (WATER BLASTING) RUMBLE STRIP, MAINTAIN EXISTING TRAFFIC MANAGEMENT SYSTEM, ETC.
Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, current insurance meeting Myers and Sons Construction's requirements. Subcontractors will be required to sign the standard Myers and Sons Construction, LP Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers and Sons Construction, LP will work cooperatively with all qualified firms seeking work on this project. Myers and Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers and Sons Construction, LP is an equal opportunity employer.
Date posted: 09/28/2017
Contractor: Stewart Engineering Inc. Contact: Keith Stewart
Address: 5323 Eastside Road Redding, Ca 96001
Phone: 5302448464 Fax: 5302448462 Email: kstewart@sebinc.net
Services needed: Stewart Engineering Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Type III Barricade, Temp. Traffic Stripe, Temp. Pavement Marking, Channelizer, Traffic Plastic Drum, Temp. Pavement Marker, Portable Lighting System, Portable Changeable Message Sign, Temp. Railing (Type K), Alternative Temp. Crash Cushion, Prepare SWPPP, Rain Event Action Plan, Storm Water Sampling and Analysis Day, Storm Water Annual Report, Move-In/Move-Out Temp. Erosion Control, Temp. Hydraulic Mulch, Temp. Cover, Temp. Check Dam, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Temp. Construction Entrance, Street Sweeping, Temp. Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe, Treated Wood Waste, Remove Concrete (Misc.), Temp. High-Visibility Fence, Clearing & Grubbing, Roadway Excavation, Imported Borrow, Hydromulch, Hydroseed, Finishing Roadway, Class 2 Aggregate Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike, Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Structural Concrete; Bridge, Aggregate Base, Structural Concrete, Paving Notch Extension, Joint Seal, Rebar, Composite Girder Strengthening, Bridge Removal (Portion), 12 in. Temp. Culvert, 3 in. Plastic Pipe (Edge Drain Outlet), Remove Pipe, Adjust Frame and Grate to Grade, Delineator (Class 2), Pavement Marker, Remove Roadside Sign, Salvage Roadside Sign (Metal Post), Relocate Roadside Sign, Furnish Single Sheet Aluminum Sign, Retroreflective Sheeting (Type XI), Roadside Sign One Post, Vegetation Control (Minor Concrete), Chain Link Railing (Type 7 Mod), Transition Railing (Type WB-31), Concrete Barrier, Salvage Metal Bridge Railing, Salvage Guardrail, Relocate Crash Cushion, Adjust and Modify Guardrail, Thermoplastic Pavement Marking, Thermoplastic Traffic Stripe, Remove Thermoplastic Traffic Stripe, Rumble Strip, Maintain Existing Traffic Management System Elements During Construction. .Stewart Engineering Inc. is an Equal Opportunity Employer and will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units as reasonably necessary.
Requirements: Stewart Engineering is signatory to the Labors Union Local 185. We encourage and actively solicit proposals from DBE subcontractors and suppliers on all our projects. All qualified DBE subcontractors must be registered and certified by the California Department of Transportation. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services etc., which may be required by the Owner. Subcontractors must possess a current contractor?s license, worker?s compensation and insurance coverage during the entire length of the prime contract. All Subcontractors will be required to sign our standard Subcontract Agreement (AGC Long Form Standard Subcontract). If you require an advance copy to of the subcontract to look over please contact our office. You must be registered and provide your Department of Industrial Relations number.
Date posted: 10/03/2017
Contractor: Q&D Construction, Inc. Contact: Brett Amesbury
Address: 1050 S. 21st Street Sparks, NV 89431
Phone: 775-786-2677 Fax: 775-786-5136 Email: bamesbury@QDconstruction.com
Services needed: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Type III Barricade, Temp. Traffic Stripe, Temp. Pavement Marking, Channelizer, Traffic Plastic Drum, Temp. Pavement Marker, Portable Lighting System, Portable Changeable Message Sign, Temp. Railing (Type K), Alternative Temp. Crash Cushion, Prepare SWPPP, Rain Event Action Plan, Storm Water Sampling and Analysis Day, Storm Water Annual Report, Move-In/Move-Out Temp. Erosion Control, Temp. Hydraulic Mulch, Temp. Cover, Temp. Check Dam, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Temp. Construction Entrance, Street Sweeping, Temp. Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe, Treated Wood Waste, Remove Concrete (Misc.), Temp. High-Visibility Fence, Clearing & Grubbing, Roadway Excavation, Imported Borrow, Hydromulch, Hydroseed, Finishing Roadway, Class 2 Aggregate Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike, Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Structural Concrete; Bridge, Aggregate Base, Structural Concrete, Paving Notch Extension, Joint Seal, Rebar, Composite Girder Strengthening, Bridge Removal (Portion), 12 in. Temp. Culvert, 3 in. Plastic Pipe (Edge Drain Outlet), Remove Pipe, Adjust Frame and Grate to Grade, Delineator (Class 2), Pavement Marker, Remove Roadside Sign, Salvage Roadside Sign (Metal Post), Relocate Roadside Sign, Furnish Single Sheet Aluminum Sign, Retroreflective Sheeting (Type XI), Roadside Sign One Post, Vegetation Control (Minor Concrete), Chain Link Railing (Type 7 Mod), Transition Railing (Type WB-31), Concrete Barrier, Salvage Metal Bridge Railing, Salvage Guardrail, Relocate Crash Cushion, Adjust and Modify Guardrail, Thermoplastic Pavement Marking, Thermoplastic Traffic Stripe, Remove Thermoplastic Traffic Stripe, Rumble Strip, Maintain Existing Traffic Management System Elements During Construction.
Requirements: Q&D Construction Inc. is a union signatory contractor. Subcontractors must possess a current contractors license, insurance coverage and workers compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Please contact us for further questions.
Date posted: 10/06/2017