Listing for all primes seeking assistance with project 02-0H4504. 4 results found.
Contractor: Stimpel-Wiebelhaus Associates, Inc Contact: Marshall Harmon
Address: 1168 Industrial St. Redding, CA, 96002
Phone: 530-356-4454 Fax: 530-223-3879 Email: marshall@stimpel.net
Services needed: We are seeking quotes from qualified DBE subcontractors and suppliers for the following items: LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), TEMPORARY PAVEMENT MARKING (TAPE), CHANNELIZER (SURFACE MOUNTED), TEMPORARY SIGNAL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SAND BAG, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTORSUPPLIED BIOLOGIST, INVASIVE SPECIES PREVENTION PLAN, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, SHOULDER BACKING, DITCH EXCAVATION, 8" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), FINISHING ROADWAY, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT (TYPE A), DATA CORE, PLACE HMA DIKE (TYPE A) (TYPE C) (TYPE F) (MISCELLANEOUS AREA), TACK COAT, COLD PLANE AC PAVEMENT, STRUCTURAL CONCRETE, DRAINAGE INLET, 24" CORRUGATED STEEL PIPE (.109" THICK), 8" PERFORATED PLASTIC PIPE UNDERDRAIN, CLASS 6 PERMEABLE MATERIAL, 24" CORRUGATED STEEL PIPE DOWNDRAIN (.064" THICK), 24" ANCHOR ASSEMBLY, REMOVE CULVERT, REMOVE INLET, MODIFY INLET WALL (REMOVE CONCRETE), GABION, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), GEOSYNTHETIC FILTER FABRIC (TYPE C), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS METAL, DELINEATOR (CLASS 2), GUARD RAIL DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE RECESSED), MARKER (CULVERT), OBJECT MARKER, REMOVE ROADSIDE SIGN, RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN-ONE POST, FURNISH SINGLE SHEET ALUMINUM SIGN FOR RETROREFLECTIVE SHEETING (TYPEXI) (.063" UNFRAMED), MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, REMOVE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING, THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, CONDUIT SYSTEM (TELEPHONE), MOBILIZATION
Requirements: STIMPEL-WIEBELHAUS ASSOCIATES, INC. (SWA) WILL WORK WITH INTERESTED SUBCONTRACTORS TO IDENTIFY OPPORTUNITIES TO BREAK DOWN ITEMS INTO ECONOMICALLY FEASIBLE PACKAGES TO ENCOURAGE MINORITY CONTRACTOR PARTICIPATION. SWA IS A UNION SIGNATORY CONTRACTOR AND SUBS SHALL BE REQUIRED TO BE OR TO SIGN AN APPROVED ONE TIME TERMS/CONDITIONS AGREEMENT PLANS AND SPECIFICATIONS ARE AVAILABLE FOR VIEWING AT OUR OFFICE OR CAN BE DOWNLOADED FROM THE OWNERS WEBSITE. PLEASE CONTACT SWA FOR ANY FUTHER ASSISTANCE AND IF ANY HELP IS NEEDDED IN OBTAINING BONDING, INSURANCE, EQUIPMENT, MATERIALS, OR SUPPLIES SWA INTENDS TO WORK COOPERATIVELY WITH ALL QUALIFIED FIRMS SEEKING TO WORK ON THIS PROJECT. WE ARE AN EQUAL OPPORTUNITY EMPLOYER AND WILL CONSIDER ANY AND ALL BIDS THAT MAY BE SUBMITTED
Date posted: 08/02/2018
Contractor: Knife River Construction Contact: Marc Madsen
Address: 1764 Skyway Chico, CA 95928
Phone: 530-891-6555 Fax: 530-894-6220 Email: marc.madsen@kniferiver.com
Services needed: Knife River Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), TEMPORARY PAVEMENT MARKING (TAPE), CHANNELIZER (SURFACE MOUNTED), TEMPORARY SIGNAL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SAND BAG, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (DAY), INVASIVE SPECIES PREVENTION PLAN, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, SHOULDER BACKING, DITCH EXCAVATION, 8" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), FINISHING ROADWAY, CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, STRUCTURAL CONCRETE, DRAINAGE INLET, 24" CORRUGATED STEEL PIPE (.109" THICK), 8" PERFORATED PLASTIC PIPE UNDERDRAIN, CLASS 6 PERMEABLE MATERIAL, 24" CORRUGATED STEEL PIPE DOWNDRAIN (.064" THICK), 24" ANCHOR ASSEMBLY, REMOVE CULVERT (LF), REMOVE INLET, MODIFY INLET WALL (REMOVE CONCRETE), GABION, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), GEOSYNTHETIC FILTER FABRIC (TYPE C), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS METAL, DELINEATOR (CLASS 2), GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE-RECESSED), MARKER (CULVERT), OBJECT MARKER, REMOVE ROADSIDE SIGN, RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN - ONE POST, FURNISH SINGLE SHEET ALUMINUM SIGN FOR RETROREFLECTIVE SHEETING (TYPE XI) (0.063" UNFRAMED), MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, REMOVE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING, THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING,CONDUIT SYSTEM (TELEPHONE),MOBILIZATION, all trucking and supply of materials.
Requirements: Knife River Construction is an Equal Opportunity Employer and is signatory to Operating Engineers, Laborers and Teamsters. 100% payment and performance bonds may be required for full amount of subcontractor price. All subcontractors must be licensed and have liability insurance and workers compensation insurance meeting Knife River Construction's requirements. Knife River Construction is willing to assist with obtaining bonding, insurance, equipment and materials and is willing to break down items into economically feasible packages to encourage participation.
Date posted: 08/06/2018
Contractor: Serafix Engineering Contractors, Inc Contact: Estimating Dept
Address: 7 Crow Canyon Court, Suite 250 San Ramon, CA 94583
Phone: 925-552-8253 Fax: 925-552-8254 Email: estimating@secontractors.com
Services needed: Serafix Engineering Contractors, Inc. (SEC) is soliciting quotes from certified DBE Subcontractors and Suppliers for the following categories of work (including but not limited to): LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION SIGNS, TRAFFIC CONTROL SYSTEM, TEMP TRAFFIC STRIPE, TEMP PAVEMENT MARKING, CHANNELIZER, TEMP SIGNAL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY RAILING, ALTERNATIVE TEMP CRASH CUSHION, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY AND ANNUAL REPORT, TEMP COVER, CHECK DAM AND DRAINAGE INLET PROTECTION, TEMP FIBER ROLL AND SAND BAG. SWPPP. TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR SUPPLIED BIOLOGIST DAY, INVASIVE SPECIES PREVENTION PLAN, TEMP HIGH VISIBILITY FENCE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, SHOULDER BACKING, DITCH EXCAVATION, PLASTIC PIPE, HMA, TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, STRUCTURAL CONCRETE, CORRUGATED STEEL PIPE, ANCHOR ASSEMBLY, REMOVE CULVERT, GABION, ROCK SLOPE PROTECTION, GEOSYNTHETIC FILTER FABRIC, GUARD RAILING DELINEATOR, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL, CABLE RAILING, CONDUIT SYSTEM, THERMOPLASTIC TRAFFIC STRIPE. Work will be broken down to accommodate subcontractor quotes.
Requirements: PLEASE SUBMIT A COPY OF YOUR CURRENT DBE CERTIFICATION WITH YOUR PROPOSAL. SEC adheres to the requirement for Affirmative Action to ensure Equal Employment Opportunity according to Executive Order 11246, and requires proof from all subcontractors that they are in accordance. 100% Performance and Payment Bonds with a surety company thereof, subject to the approval of SEC, will be required of all subcontractors. SEC will pay bond premium up to 1.5%. Please contact SEC for assistance with bonding, insurance, or lines of credit. All subcontractors are expected to sign a standard contract, which can be viewed at our office located at 7 Crow Canyon Court Ste 250 San Ramon, CA 94583. Any bid provided by a Subcontractor constitutes an acceptance on each and every term of the general contractor?s standard contract. Subcontractor will be deemed to understand and accept those terms by providing a bid. Any attempt by a Subcontractor to revise or limit those terms will be null and void and not recognized by SEC. Prevailing wages must be met. Subcontractor must possess current insurance and workers compensation coverage meeting SEC?s insurance requirements. Insurance waiver of subrogation is also required. SEC is a Union Contractor. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements. Plans & specifications are available for downloading from the Caltrans website: http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html, viewing at our office or at Caltrans Plans Counter. Please contact SEC at 925-552-8253 for additional information or questions.
Date posted: 08/09/2018
Contractor: Hat Creek Construction & Materials, Inc. Contact: Amber DeMarco
Address: 24339 Hwy 89 N. Burney, Ca. 96013
Phone: 530-335-5501 Fax: 530-335-5510 Email: amber@hatcreekconstruction.com
Services needed: LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), TEMPORARY PAVEMENT MARKING (TAPE), CHANNELIZER (SURFACE MOUNTED), TEMPORARY SIGNAL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SAND BAG, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTORSUPPLIED BIOLOGIST, INVASIVE SPECIES PREVENTION PLAN, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, SHOULDER BACKING, DITCH EXCAVATION, 8" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), FINISHING ROADWAY, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT (TYPE A), DATA CORE, PLACE HMA DIKE (TYPE A) (TYPE C) (TYPE F) (MISCELLANEOUS AREA), TACK COAT, COLD PLANE AC PAVEMENT, STRUCTURAL CONCRETE, DRAINAGE INLET, 24" CORRUGATED STEEL PIPE (.109" THICK), 8" PERFORATED PLASTIC PIPE UNDERDRAIN, CLASS 6 PERMEABLE MATERIAL, 24" CORRUGATED STEEL PIPE DOWNDRAIN (.064" THICK), 24" ANCHOR ASSEMBLY, REMOVE CULVERT, REMOVE INLET, MODIFY INLET WALL (REMOVE CONCRETE), GABION, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), GEOSYNTHETIC FILTER FABRIC (TYPE C), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS METAL, DELINEATOR (CLASS 2), GUARD RAIL DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE RECESSED), MARKER (CULVERT), OBJECT MARKER, REMOVE ROADSIDE SIGN, RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN-ONE POST, FURNISH SINGLE SHEET ALUMINUM SIGN FOR RETROREFLECTIVE SHEETING (TYPEXI) (.063" UNFRAMED), MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, REMOVE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING, THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, CONDUIT SYSTEM (TELEPHONE), MOBILIZATION
Requirements: Subcontractors must possess current contractor?s license, insurance and workers compensation meeting Hat Creek Construction?s requirements. Payment and performance bonds may be required. Subcontractors will be subject to the terms and conditions of Hat Creek?s subcontract agreement and safety standards. If you need assistance in obtaining bonds, insurance, equipment, materials and/or supplies please contact our office or visit our website www.hatcreekconstruction.com for more information. Hat Creek Construction & Materials, Inc. is an equal opportunity employer and intends to work cooperatively with all qualified firms seeking work on this project.
Date posted: 08/13/2018