Listing for all primes seeking assistance with project 01-415504. 4 results found.
Contractor: Telfer Pavement Technologies, LLC Contact: Rick Arias
Address: 4522 Parker Avenue Suite 350 McClellan, CA. 95652
Phone: 916-383-1756 Fax: 916-383-4084 Email: estimating@telferpavements.com
Services needed: Telfer Pavement Technologies, LLC is requesting quotes from all qualified subcontractors and suppliers including certified UDBE/DBE firms for the following items of work, including but not limited to; Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, Job Site Management, Prepare Water Pollution Control Plan, Temporary Traffic Stripe (Tape), Temporary Railing (Type K), Alternative Crash Cushion System, Temporary Fiber Roll, Treated Wood Waste, Temporary High-Visibility Fence, Clearing and Grubbing, Shoulder Backing, Crack Treatment, Prepaving Inertial Profiler, Prepaving Grinding Day, Hot Mix Asphalt (Type A), Data Core, Tack Coat, Cold Plane Asphalt Concrete Pavement, Pavement Markers (Retroreflective) and Removal, Guard Railing Delineator, Remove Roadside Signs, Retroreflective Sheeting (Type XI), Roadside Signs, Midwest Guardrail System (Steel and Wood Post), Vegetation Control, Transition Railing, Thermoplastic Striping and Markings and Removal, Concrete. ETC?Quotations will be broken down to comparable packages as reasonably necessary. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.
Requirements: Telfer Pavement Technologies, LLC will assist with performance and payment bonds as they may be required for the full amount of subcontract price. Telfer Pavement Technologies, LLC, will pay for bond premium up to 1.5%. Please call if you need assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Telfer Pavement Technologies, LLC requirements and will be required to sign the standard Telfer Pavement Technologies, LLC Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the Telfer Pavement Technologies, LLC?s office. Endorsements or waivers required are Additional Insured End., Primary Wording End., and a Waiver of Subrogation (GL & WC). Plans and specifications are available for viewing at our office, and or available for viewing on the Caltrans website. Please call if you need any additional assistance. Telfer Pavement Technologies, LLC intends to work cooperatively with all qualified firms seeking to supply materials, services or work on this project Telfer Pavement Technologies, LLC is an equal opportunity employer.
Date posted: 06/25/2018
Contractor: Mercer-Fraser Company Contact: Verity Penland
Address: PO Box 1006 Eureka, CA 95502
Phone: 707-443-6371 Fax: 707-443-0277 Email: vpenland@mercerfraser.com
Services needed: Mercer-Fraser is currently requesting quotes from all qualified DBE subcontractors and/or suppliers for the following items of work: 1 LEAD COMPLIANCE PLAN 2 PROGRESS SCHEDULE (CRITICAL PATH METHOD) 3 TIME-RELATED OVERHEAD (LS) 4 CONSTRUCTION AREA SIGNS 5 TRAFFIC CONTROL SYSTEM 6 TEMPORARY TRAFFIC STRIPE (TAPE) 7 PORTABLE CHANGEABLE MESSAGE SIGN (LS) 8 TEMPORARY RAILING (TYPE K) 9 ALTERNATIVE TEMPORARY CRASH CUSHION SYSTEM 10 JOB SITE MANAGEMENT 11 PREPARE WATER POLLUTION CONTROL PROGRAM 12 TEMPORARY FIBER ROLL 13 TREATED WOOD WASTE 14 TEMPORARY HIGH-VISIBILITY FENCE 15 CLEARING AND GRUBBING (LS) 16 SHOULDER BACKING 17 CRACK TREATMENT 18 PREPAVING INERTIAL PROFILER 19 PREPAVING GRINDING DAY 20 HOT MIX ASPHALT (TYPE A) 21 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) 22 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING GRID) 23 DATA CORE 24 TACK COAT 25 COLD PLANE ASPHALT CONCRETE PAVEMENT 26 REMOVE PAVEMENT MARKER 27 GUARD RAILING DELINEATOR 28 PAVEMENT MARKER (RETROREFLECTIVE) 29 OBJECT MARKER (TYPE P) 30 REMOVE ROADSIDE SIGN 31 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) 32 RETOREFLECTIVE SHEETING (TYPE XI) 33 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 34 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 35 ROADSIDE SIGN - ONE POST 36 ROADSIDE SIGN - TWO POST 37 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) 38 MIDWEST GUARDRAIL SYSTEM (STEEL POST) 39 MIDWEST GUARDRAIL SYSTEM (WOOD POST) 40 VEGETATION CONTROL (MINOR CONCRETE) 41 VEGETATION CONTROL MAT (RUBBER OR FIBER) 42 TRANSITION RAILING (TYPE WB-31) 43 END ANCHOR ASSEMBLY (TYPE SFT) 44 ALTERNATIVE IN-LINE TERMINAL SYSTEM 45(F) CONCRETE BARRIER TRANSITION 46 REMOVE GUARDRAIL 47 6" THERMOPLASTIC TRAFFIC STRIPE 48 8" THERMOPLASTIC TRAFFIC STRIPE 49 THERMOPLASTIC PAVEMENT MARKING 50 "6"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12)" 51 REMOVE THERMOPLASTIC TRAFFIC STRIPE 52 REMOVE THERMOPLASTIC PAVEMENT MARKING 53 MOBILIZATION
Requirements: Mercer Fraser Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Mercer-Fraser Company is a union signatory contractor. Subcontractors must possess a current contractor?s license, worker?s compensation and insurance coverage during the entire length of the prime contract. 100% Performance and Payment Bonds may be required. Conditions or exceptions in Subcontractor?s quote are expressly rejected unless accepted in writing. All Subcontractors will be required to sign our standard Subcontract Agreement. Plans and specifications are available for viewing at our office or you may call Mercer-Fraser Company for further assistance. Please call if assistance is needed in obtaining bonding, insurance, equipment, materials and supplies. Mercer-Fraser Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted.
Date posted: 06/28/2018
Contractor: Ghilotti Construction Company, Inc. Contact: Jim Petnic
Address: 246 Ghilotti Avenue Santa Rosa, CA 95407
Phone: 707-585-1221 Fax: 707-585-1601 Email: jimp@ghilotti.com
Services needed: Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for quotes including, but not limited to, the following scopes of work: FABRIC & OILS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, COLD PLANE, CLEAR & GRUB, EROSION CONTROL, ROADSIDE SIGNS, MBGR, CRACK TREATMENT, PREPAVING INERTIAL PROFILER, PREPAVING GRINDING DAY, GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING GRID), THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Requirements: Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: GCC may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. GCC will pay bond premiums up to 1 1/2% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form 'CG-2010-1185' or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
Date posted: 07/03/2018
Contractor: O.C. Jones & Sons, Inc. Contact: Greg Souder
Address: 1520 Fourth Street Berkeley, CA 94710
Phone: 510-526-3424 Fax: 510-526-0990 Email: hfaria@ocjones.com
Services needed: REQUEST FOR DBE SUBCONTRACTORS AND SUPPLIERS We are soliciting quotes for (including but not limited to): Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, WPCP, Treated Wood Waste, Clearing & Grubbing, Crack Treatment, Prepaving Inertial Profiler, Prepaving Grinding, Geosynthetic Pavement Interlayer (Paving Grid), Data Core, Tack Coat, Cold Plane AC, Guard Railing Delineator, Pavement Marker, Object Marker, Roadside Signs, Midwest Guardrail System, Vegetation Control (Minor Concrete), Vegetation Control MAT, HMA Testing, Concrete Barrier, Striping & Marking and Construction Materials
Requirements: An Equal Opportunity Employer 100% Performance & Payment Bonds may be required. Worker?s Compensation Waiver of Subrogation required. Please call OCJ for assistance with bonding, insurance, necessary equipment, material and/or supplies. OCJ is willing to breakout any portion of work to encourage DBE Participation. Plans & Specs are available for viewing at our office or through the Caltrans Website at www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php.
Date posted: 07/11/2018