Note: This list is not updated when addenda are issued. For informational purposes only.
| Item No. | Item Code |
Item Description | Unit of Measure | Estimated Quantity |
| 1 | 070030 | LEAD COMPLIANCE PLAN | LS | LUMP SUM |
| 2 | 074016 | CONSTRUCTION SITE MANAGEMENT | LS | LUMP SUM |
| 3 | 120090 | CONSTRUCTION AREA SIGNS | LS | LUMP SUM |
| 4 | 120100 | TRAFFIC CONTROL SYSTEM | LS | LUMP SUM |
| 5 | 130300 | PREPARE STORM WATER POLLUTION PREVENTION PLAN | LS | LUMP SUM |
| 6 | 130310 | RAIN EVENT ACTION PLAN | EA | 12 |
| 7 | 130320 | STORM WATER SAMPLING AND ANALYSIS DAY | EA | 5 |
| 8 | 130330 | STORM WATER ANNUAL REPORT | EA | 1 |
| 9 | 130620 | TEMPORARY DRAINAGE INLET PROTECTION | EA | 21 |
| 10 | 130640 | TEMPORARY FIBER ROLL | LF | 9,800 |
| 11 | 130650 | TEMPORARY GRAVEL BAG BERM | LF | 350 |
| 12 | 130730 | STREET SWEEPING | LS | LUMP SUM |
| 13 | 130900 | TEMPORARY CONCRETE WASHOUT | LS | LUMP SUM |
| 14 | 200002 | ROADSIDE CLEARING | LS | LUMP SUM |
| 15 | 200116 | GRAVEL (MISCELLANEOUS AREAS) (SQYD) | SQYD | 530 |
| 16 | 200120 | CULTIVATE | SQYD | 35,000 |
| 17 | 202006 | SOIL AMENDMENT | CY | 130 |
| 18 | 202011 | MULCH | CY | 3,050 |
| 19 | 202030 | COMMERCIAL FERTILIZER (GRANULAR) | LB | 1,960 |
| 20 | 204013 | PLANT (GROUP M) | EA | 30,100 |
| 21 | 204035 | PLANT (GROUP A) | EA | 10,100 |
| 22 | 204036 | PLANT (GROUP B) | EA | 380 |
| 23 | 204038 | PLANT (GROUP U) | EA | 110 |
| 24 | 204055 | WILDFLOWER SEEDING (SQYD) | SQYD | 920 |
| 25 | 204099 | PLANT ESTABLISHMENT WORK | LS | LUMP SUM |
| 26 | 206560 | CONTROL AND NEUTRAL CONDUCTORS | LS | LUMP SUM |
| 27 | 206602 | 1" ELECTRIC REMOTE CONTROL VALVE | EA | 7 |
| 28 | 206604 | 1 1/2" ELECTRIC REMOTE CONTROL VALVE | EA | 18 |
| 29 | 206605 | 2" ELECTRIC REMOTE CONTROL VALVE | EA | 28 |
| 30 | 206910 | 24 STATION IRRIGATION CONTROLLER (PEDESTAL MOUNTED) | EA | 1 |
| 31 | 023052 | 30 STATION IRRIGATION CONTROLLER (PEDESTAL MOUNTED) | EA | 1 |
| 32 | 023053 | 2" FLOW SENSOR | EA | 2 |
| 33 | 208006 | 2" GALVANIZED STEEL PIPE (SUPPLY LINE) | LF | 50 |
| 34 (F) | 208278 | 3" PLASTIC PIPE (PR 315) (SUPPLY LINE) | LF | 6,300 |
| 35 | 023054 | INSTALL IRRIGATION CONTROLLER ENCLOSURE CABINET | EA | 2 |
| 36 | 208304 | WATER METER | EA | 2 |
| 37 | 208310 | IRRIGATION SLEEVE | LF | 100 |
| 38 | 208421 | BACKFLOW PREVENTER ASSEMBLY ENCLOSURE | EA | 2 |
| 39 | 208426 | 2" BACKFLOW PREVENTER ASSEMBLY | EA | 2 |
| 40 | 023055 | SPRINKLER PROTECTOR | EA | 320 |
| 41 | 208465 | SPRINKLER (TYPE A-5) | EA | 57 |
| 42 | 208466 | SPRINKLER (TYPE A-6) | EA | 64 |
| 43 | 208467 | SPRINKLER (TYPE A-7) | EA | 120 |
| 44 | 208468 | SPRINKLER (TYPE A-8) | EA | 100 |
| 45 | 208471 | SPRINKLER (TYPE B-1) | EA | 350 |
| 46 | 208472 | SPRINKLER (TYPE B-2) | EA | 170 |
| 47 | 208473 | SPRINKLER (TYPE B-3) | EA | 140 |
| 48 | 208474 | SPRINKLER (TYPE B-4) | EA | 22 |
| 49 | 208481 | SPRINKLER (TYPE C-1) | EA | 79 |
| 50 | 208588 | 3" GATE VALVE | EA | 7 |
| 51 (F) | 208595 | 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 19,600 |
| 52 (F) | 208596 | 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 8,900 |
| 53 (F) | 208597 | 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 3,200 |
| 54 (F) | 208598 | 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 12,200 |
| 55 (F) | 208599 | 2 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) | LF | 2,500 |
| 56 | 208683 | BALL VALVE | EA | 10 |
| 57 | 208809 | 10" WELDED STEEL PIPE CONDUIT (.250" THICK) | LF | 50 |
| 58 | 394095 | ROADSIDE PAVING (MISCELLANEOUS AREAS) | SQYD | 650 |
| 59 | 023661 | MONUMENT WALL | LS | LUMP SUM |
| 60 | 731530 | MINOR CONCRETE (TEXTURED PAVING) | SQFT | 20,300 |
| 61 | 860090 | MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION | LS | LUMP SUM |
| 62 | 860797 | ELECTRIC SERVICE (IRRIGATION) | LS | LUMP SUM |
| 63 | 023662 | MONUMENT LIGHTING | LS | LUMP SUM |
| 64 | 999990 | MOBILIZATION | LS | LUMP SUM |