Inquiry #1: Special Provisions - Notice to Bidders, "No prebid meeting is scheduled for this project". Section 2-1.03, "The Department will conduct a mandatory prebid meeting for this contract".

Please clarify and provide place, date & time if required.

Inquiry submitted 10/17/2012

Response #1:Pending
Response posted 10/19/2012


Response #2:An addendum will be issued.
Response posted 10/22/2012




Inquiry #2: Sheet No. 657 of 885 shows a column information table for North Anaheim OH with the size of the column,the X and Y, and the thickness of the new column casing, but does not provide the height of the 4 columns that require column casings.
Sheet No. 703 of 885 ,Det. A-A shows the X and Y for the column casings at EAST St UC , but does not show the size of the columns,the thickness off the column casings, or the height of the 18 columns that require column casings.
Please provide the missing information so we can provide a accurate cost for this item.

Inquiry submitted 10/24/2012

Response #1:Pending
Response posted 10/31/2012


Response #2:
Response posted 11/02/2012


Response #3:Per the “Class P/F Column” Detail on Sheet 657, the column casing extends from 2-in from the soffit to 2-in from the column foundation. The heights of the columns are to be verified as indicated in the note on the lower left of the plan sheet “The Contractor shall verify all controlling field dimensions before ordering or fabricating any material.”
Response posted 11/15/2012




Inquiry #3: Please define Bid Item No. 238.
Inquiry submitted 10/31/2012

Response #1:Pending
Response posted 10/31/2012


Response #2:Bid Item No. 238 Concrete Barrier – 7,820 LF is broken out into various types of standard and modified concrete barriers. Refer to Summary of Quantities Sheet Q-6 (Sheet 406/885) for quantities of the various types of concrete barriers. See also Construction Detail Sheets C-34 (Sheet 89/885) & C-35 (Sheet 90/885) for modified concrete barrier details.
Response posted 11/02/2012




Inquiry #4: The inquiries website indicates that the response to question 2 has been posted but it isn't.
Inquiry submitted 11/02/2012

Response #1:The response posted was deleted because it got posted by mistake and it was actually for question 3. Sorry for the confusion
Response posted 11/02/2012




Inquiry #5: Ref Item 196- Existing Sign Structures where these sign panel changes are called for, are incompatible for the specified Laminated Panels 1" Type A. The existing stuctures are generally formed panels on RSPF. Will this ambigiity be corrected by an addendum before the bid date?
Inquiry submitted 11/15/2012

Response #1:Pending
Response posted 11/15/2012


Response #2:Bid as you see it
Response posted 11/29/2012




Inquiry #6: Can you tell me if there will be additional information coming out to answer question 2. I'm concerned about time frame.

Inquiry submitted 11/15/2012

Response #1:Please see answer posted for Inquiry No. 2
Response posted 11/15/2012




Inquiry #7: 1-Current contract information does not include details that will enable the contractor to determine vertical pavement offsets( See Std Plan a 76a note #7) for Portion of Item 238, Concrete barrier Type 60C. Will this be provided before the bid by Addendum?

2-Ref Special provision Section 83-2.03, ppg 108 and 109- Plan details, e.g.C-37, C-38, call for transitions at barrier types. Please confirm these are measured and paid for in Item(s) other than Item 238.

Inquiry submitted 11/16/2012

Response #1:Pending
Response posted 11/19/2012


Response #2:1-At each location where Conc Barrier Type 60C is used, the vertical pavement offsets will vary from the minimum 1.5” to the maximum 36”. Suggest averaging the height over the length of the concrete barrier or referencing the Cross-Sections for approximate retaining heights of the barriers.
2-Concrete Barrier Transitions (C-37)
There are three (3) locations of 15’ Concrete Barrier Transitions:

Sheet L-1 - Included as part of Concrete Barrier (Type 60 Mod C)
Sheet L-12/Sheet C-23 - Included as part of Concrete Barrier (Type 60 Mod B)
Sheet L-15 - Included as part of Concrete Barrier (Type 60 Mod B)

As indicated on paragraph No. 2 on page 109 of the Special Provisions, Concrete Barrier (Type 60 Mod B) and Concrete Barrier (Type 60 Mod C) are paid for as Concrete Barrier and they included in the quantity for Item 238.

Concrete Barrier Terminal Sections (C-38)
All five (5) locations of Concrete Barrier Terminal Sections are included within limits of Concrete Barrier (Type 60), Concrete Barrier (Type 60C), and Concrete Barrier (Type 60 Mod A).

As indicated on paragraph No. 2 on page 109 of the Special Provisions, Concrete Barrier (Type 60), Concrete Barrier (Type 60C), and Concrete Barrier (Type 60 Mod A) are paid for as Concrete Barrier and they included in the quantity for Item 238.
Response posted 11/20/2012




Inquiry #8: Are there any constraints on the type of shoring used to construct the required surcharges?
Inquiry submitted 11/19/2012

Response #1:Section 19-6.03D will be deleted from the special provisions per an upcoming Bid Addendum. No surcharges or settlement periods are required.
Response posted 11/27/2012




Inquiry #9: Are surcharge fills required at any bridge abutments? The chart on page 61 of the special provisions indicates they are, however there is no time period (days) specified. Further the material handout indicates no settlement surcharges will be required.
Inquiry submitted 11/20/2012

Response #1:Section 19-6.03D will be deleted from the special provisions per an upcoming Bid Addendum. No surcharges or settlement periods are required.
Response posted 11/28/2012




Inquiry #10: 1) Special provisions section 19-6.03D, table refers to surcharges at bridge approach embankments but no settlement period (days) were specified. Please clarify.

2) Which plan sheet can we find the 3" Galvanized steel pipe (supply line on bridge) for Item 107?

3) Which plan sheet can we find the 60" Permanent Steel Casing for Item 145?

Inquiry submitted 11/20/2012

Response #1:1)Section 19-6.03D will be deleted from the special provisions per an upcoming Bid Addendum. No surcharges or settlement periods are required.
2)Please see the following Irrigation Plan Sheets:
IP-2 (Brookhurst St UC) (471/885)
IP-6 (Euclid St UC) (475/885)
IP-13 (Acacia St UC) (482/885)
IP-15 (State College Blvd UC) (483/885)
3)Please refer to Sign “I” on the following sheets:
Sign Plan Sheet S-4 (346/885)
Sign Details Sheet SD-3 (364/885)
Sign Details Sheet SD-13 (374/885)
Sign Quantities Sheet SQ-9 (395/885)
Response posted 11/28/2012




Inquiry #11: Item 241 is an unusual bid item description which apparently has neither plan details or a special provision to define this work. Can you provide this information before the bid date?
Inquiry submitted 11/20/2012

Response #1:Please refer to Detail C “Anchor Block for Transition Railing Connection” of 2010 Standard Plan A77J3.
Response posted 11/26/2012


Response #2:Please refer to Detail C “Anchor Block for Transition Railing Connection” of 2010 Standard Plan A77J3.
Response posted 11/27/2012




Inquiry #12: In regards to Bid Item 189, the single location shows the foundatino will be near a catch basin (Sheet SD-2). Will the catch basin be removed and the foundation be installed? Also, is 186.4 feet deep for a single sign foundation correct? There is no detail showing that this quantity is to be used for the single 16" CIDH sign foundation, and that seems too deep for one foundation
Inquiry submitted 11/21/2012

Response #1:Bid Item 189: 16” CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION) – 190 LF
Per Sign Details sheet SD-12 (373/885), the overhead sign structure slab reinforcing detail for overhead sign “H” is centered at STA “A” 131+97. The existing inlets to be adjusted (Drainage Systems 10b & 10c) are centered at approx. STA “A” 131+72, allowing for an approximate clearance of 15’+ from the nearest edge of the slab reinforcing footprint for Sign “H”. The inlets are not intended to be removed.

There are a total of six (6) 16” CIDH piles at this location; their total combined length is approx. 190 LF.
Response posted 11/27/2012




Inquiry #13: Section 9-1.16C of the special provisions lists materials that be eligible for partial payments. Fiber Optic cable and conduit had previously be eligible for payments on past project. Will they be considered here? These items do take time to procure and subject to price variation in the project time period. Please clarify.
Inquiry submitted 11/27/2012

Response #1:Fiber Optic cable and conduit are not considered eligible for partial payments on this project.
Response posted 11/29/2012




Inquiry #14: Please review the following questions that need clarification:

1) Refer to Sheet 501, what is construction note #1?

2) Refer to Sheet 507, what is construction note #2?

3) Refer to Sheet 585, How does general note #4 apply? It not congruent with subsequent plan sheet call outs.

4) Refer to Sheet 575, This sheet does not comport with the work and equipment shown on the location plan sheets. Is there another detail to work with?

Inquiry submitted 11/27/2012

Response #1:1)Sheet 501 - Note 1, under “Project Notes” and the #1 box callout are typos, they should not be on this sheet.
2)Sheet 507 – Note 2, under “Project Notes” is a typo, it should not be on this sheet. The #2 box callouts should be #1 box callouts.
3)Sheet 585 – The 4-1” Innerducts are only intended for the bottom 4” conduit (not the spare 4” conduit) of the Fiber Optic trench, as shown on Sheet E-115, to match existing conditions.
4)Sheet 575 – Refer to Project Note 6 on Sheet E-62.
Response posted 11/29/2012






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.