Inquiry #1: for the hydroseed spec , it calls out for BFM , and on the erosion control legend , it calls for wood fiber and tackifier. cant i use a pre packaged Bonded Fiber Matrix?? like we have used in the past for cal-trans
Inquiry submitted 04/16/2013

Response #1:Submitted for consideration.

Response posted 04/17/2013


Response #2:Yes, you may use a pre-packaged bonded fiber matrix product that contains both fiber and tackifier.
Response posted 04/17/2013




Inquiry #2: After, a site visit, it appears that there are a few parcels that have structures that are called out to be protected in place; however the structures are located within 1’ to 2’ of the SW LOL, meaning they are within inches of the edge of CIDH Piles. The parcels of concern include 34904, 34930 and 34931.
Parcel 34904 - The building’s roof overhang is in line with the existing fence and the edge of the CIDH is to be in line with the existing fence.
Parcel 34930 - Existing shed and masonry/retaining wall are located within 0.5’ of edge of CIDH.
Parcel 34931 - The Patio cover hangs over the existing fence and edge of CIDH is to be in line with existing fence. Also, there is a masonry/retaining wall that is located within a foot of the edge of the CIDH.
How are we supposed to protect those structures in place while constructing the soundwall when there is not enough room to perform the work? Also, per the Special Provisions 58-2.03B, all excess mortar must be cleaned from beveled block joints, however the interfering structures will not allow enough room for this spec to be met. Will the alignment of the soundwalls be moved out to allow room for installation per the specifications and protection of the existing structures?

Inquiry submitted 04/18/2013

Response #1:Submitted for consideration.
Response posted 04/18/2013


Response #2:Please bid per the current contract documents.
Response posted 04/25/2013




Inquiry #3: Can you please provide more details for the dimensions and tolerances of the Transparent Soundwall System? The details provided in the plans do not give enough information for tolerances during construction.

Inquiry submitted 04/18/2013

Response #1:Submitted for consideration.
Response posted 04/18/2013


Response #2:Please refer to the distributor, Armtec, for the construction tolerances of the transparent sound walls.

Response posted 04/25/2013




Inquiry #4: on the erosion control legend step 5 and step 6 . shouldnt they be reversed ? put the seed and 600 lb BFM , and then cap it off with the 1200 lb BFM . the seed will be closer to the ground and a better chance of germination . thank you
Inquiry submitted 04/23/2013

Response #1:Submitted for consideration.
Response posted 04/23/2013


Response #2:No, steps 5 and 6 should not be reversed. Perform the erosion control in the steps as shown on the plans.
Response posted 04/23/2013




Inquiry #5: Item 70 - Structure Concrete, Sound Wall has a quantity of 506 cy. Where is the Structure Excavation and Structure Backfill for this item to be paid?

My review of the contract documents do not make reference to payments for this work.

Inquiry submitted 04/23/2013

Response #1:Submitted for consideration.
Response posted 04/23/2013


Response #2:Please refer to Section 51-1.04 PAYMENT of the Standard Specifications. Please bid per the current contract documents.

Response posted 04/23/2013




Inquiry #6: What address may I mail the bid bond to?
Inquiry submitted 04/29/2013

Response #1:Submitted for consideration.
Response posted 04/29/2013


Response #2:The electronic bidding guide instructs the bidder to submit the bid bond to Office Engineer before the bid opening time. The Office Engineer address is listed in the Standards section 1-1.11 as:

MSC43
Office Engineer
Department of Transportation
1727 30th Street
Sacramento CA 95816-7005
Response posted 04/30/2013




Inquiry #7: I have a inquiry in regards to the CMU heights for sound walls 358R, 362R & 662R. Based on the aesthetic pattern chosen for these masonry walls and incorporating a 4" cap block on top the wall and pilasters theres a problem with the overall height of the walls listed.

The overall height from top of pilecap to top of soundwall should be 4" off the CMU modular height. Meaning the wall should be for example 9'-0", 9"-8", 10'-4", 11'-0", 11'-8", 12'-4", 13'-0" and so on. But the heights associated with 358R, 362R & 662R are all modular 8" heights. Such as 8'-8", 9'-4", 10'-0", 10'-8", 11'-4", 12'-0" etc. It does not work out equally for the pattern chosen by Caltrans.

In order to build the wall to the height listed, you would have to use 4" high pieces right below the 4"cap. Which is not per plan. The height must be either increased or decreased by 4" and the final pay quantity should also be adjusted to reflect this change.

Though inquiry might be too late to issue an addendum, please note that the question was asked and needs to be addressed after or before bid award.

Inquiry submitted 04/30/2013

Response #1:Submitted for consideration.
Response posted 04/30/2013


Response #2:Please bid per the current contract plans.
Response posted 04/30/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.