Inquiry #1: In which item of work will the contractor be paid for the “Select Import Borrow (MSE Wall)” material specified under 10-1.35 EARTH RETAINING STRUCTURE subsection Materials on page 134 of the special provisions, Item 54 - Structural Backfill (Retaining Wall), Item 58 - Import Borrow or Item 56 – Earth Retaining Structure (MSE Wall)?
Inquiry submitted 07/23/2012

Response #1:Submitted for consideration.
Response posted 07/24/2012


Response #2:Pay quantities associated with the 19th Avenue Overcrossing MSE Wall are shown on contract plan sheet 328 of 352.

The item of work in which the Contractor will be paid for structure backfill material associated with the construction of the MSE wall specified under 10-1.35, "Earth Retaining Structure," subsection, "Materials" on page 134 of the special provisions is Item 56 - Earth Retaining Structure (MSE Wall).

Refer to contract plan sheet 329 of 352- Typical Section detail for the following:
1. Area designated as "Structure Excavation (Retaining Wall)" will be paid under Item 50 - Structural Excavation (Retaining Wall)
2. Area designated as "Structure Backfill (Retaining Wall) (95% Relative Compaction)" will be paid under "Item 52 - Structure Backfill (Retaining Wall) "

Refer to Section 10-1.33, "Earthwork," in the next to the last paragraph on page 130 of the contract special provisions for description of payment for material below the bottom of the MSE wall
Response posted 08/11/2012




Inquiry #2: Please consider adding a new item for “Select Import Borrow (MSE Wall)” per Cal Trans standard item code # 022178.
Inquiry submitted 07/23/2012

Response #1:Submitted for consideration.
Response posted 07/24/2012


Response #2: Please refer to the response to Inquiry #1. Select imported borrow is not specified for this contract. Earthwork is included in the contract price paid per square foot for earth retaining structure (mechanically stabilized earth wall), as stated in subsection "MEASUREMENT AND PAYMENT," in Section 10-1.35 "EARTH RETAINING STRUCTURES" of the Special Provisions.
Response posted 08/15/2012




Inquiry #3: Section 10-1.33 EARTHWORK page 130, 2nd paragraph from bottom of the page. “At locations & to the limits shown on the plans, material below the bottom of MSE (Br No. 45E0104) as shown on the plans shall be removed and replaced with Class 2 aggregate base material, etc.” The typical section for the MSE wall shown on sheet 329 is unclear as to the depth of Class 2 aggregate base required. Is it 5.0 lf deep or 8.0 LF deep? Please clarify.
Inquiry submitted 07/23/2012

Response #1:Submitted for consideration.
Response posted 07/24/2012


Response #2:The depth of the materials to be removed and replaced is 5 feet as shown on the "Typical Section" detail of contract plan sheet 329 of 352. For additional information, see response to Bid Inquiry #1.
Response posted 08/11/2012




Inquiry #4: Please reference Typical Cross Section X-2 (sheet no. 3); the median construction detail shows a 5' shoulder widening at station 506+00 to 508+95 and 511+25 to 514+50 while 508+95 to 511+25 shows full section AC across the median. Now please reference Layout L-3 (sheet no. 12) and Traffic Handling Plan TH-6 (sheet no. 158); they appear to show full section AC across the median from station 506+00 to 514+50. Please confirm which one is correct.
Inquiry submitted 07/27/2012

Response #1:Submitted for consideration.
Response posted 07/28/2012


Response #2:Plans have been revised to clarify median construction and temporary pavement. Please see Addendum #2, dated September 11, 2012 for revised plans.
Response posted 08/24/2012




Inquiry #5: The typical cross sections show the existing pavement section for route 198 only; please provide the existing pavement information for 19th ave, 18.5 ave, Iona ave, Silverado dr/Tammy ln, and Stinson dr/Carmel dr.
Inquiry submitted 07/31/2012

Response #1:This inquiry has been submitted for consideration.
Response posted 08/01/2012


Response #2: The requested existing structural section information is not available. Bidders are advised to "submit a bid based on the work item quantities the Department shows in the Bid Item List," per Section 2-1.12B "Bid Item List and Bid Comparison" of the amended Standard Specifications.
Response posted 08/17/2012




Inquiry #6: Please reference Layout L-5 (sheet no. 16); this sheet shows new pavement section on "WBE"/"A" from station 525+00 to 526+30.62. No typical section exists for this stationing. Please provide a typical pavement section for the work in this area.
Inquiry submitted 08/02/2012

Response #1:
This inquiry has been submitted for consideration.
Response posted 08/02/2012


Response #2:Station range for A Line westbound pavement on Typical Section X-2 (sheet 3) was incorrectly shown as ending at 525+36.36 (correct station is 526+36.36). Sheet has been revised to show correct station. See Addendum #2, dated September 11, 2012 for revised sheet.
Response posted 08/24/2012




Inquiry #7: Please reference Layout L-6 (sheet 17) and Traffic Handling Plan TH-17 (sheet 169); both of these pages show a new median shoulder section from station 535+50 to 545+00. The typical cross sections do not have any information for this stationing. Please provide a typical cross section for this location.
Inquiry submitted 08/02/2012

Response #1:
This inquiry has been submitted for consideration.
Response posted 08/02/2012


Response #2:Typical section has been added to Typical Cross Sections X-2 (sheet 3). See Addendum #2, dated September 11, 2012 for revised sheet.
Response posted 08/24/2012




Inquiry #8: The Engineer's estimated quantities for Furnish Piling Item #75 and Item #77 appear to be grossly inaccurate. The Item #75 quantity is overstated by approximately 50% and Item #77 is understated by approximately 10%. Please review and revise the item quantities as necessary.
Inquiry submitted 08/06/2012

Response #1:Submitted for consideration.
Response posted 08/06/2012


Response #2:Refer to Addendum No. 2 dated September 11, 2012.

Response posted 09/20/2012




Inquiry #9: The typical cross sections do not provide existing pavement information for the existing shoulders on Rte 198; please provide the missing information.
Inquiry submitted 08/06/2012

Response #1:Submitted for consideration.
Response posted 08/06/2012


Response #2: The requested existing structural section information is not available. Bidders are advised to "submit a bid based on the work item quantities the Department shows in the Bid Item List," per Section 2-1.12B "Bid Item List and Bid Comparison" of the amended Standard Specifications.
Response posted 08/17/2012




Inquiry #10: Special Provision Section 10-1.65, PREPARE AND PAINT CONCRETE SURFACES,Measurement And Payment, makes reference to a Prepare And Paint Concrete item which has been omitted from the bid item schedule. Please add the item.
Inquiry submitted 08/07/2012

Response #1:Submitted for consideration.
Response posted 08/07/2012


Response #2: Refer to Item No. 107, Item Code 597600 for PREPARE AND PAINT CONCRETE which is located on page 8 in the "COPY of BID ITEM LIST" in the Special Provisions and is also located in the Bid Book.
Response posted 08/11/2012




Inquiry #11: Special Provisions Section 10-1.56, SOUND WALL, Measurement And Payment, makes reference to a Structural Concrete, Sound Wall item to pay for the trench footing supporting the masonry wall. This item is not included in the schedule of bid items. The bid item schedule does include Item #86, Minor Concrete (Sound Wall). Please clarify.
Inquiry submitted 08/07/2012

Response #1:Submitted for consideration.
Response posted 08/07/2012


Response #2:Item 510524 - Minor Concrete (Minor Structure) was incorrect and has been changed to Item 510061 - Structural Concrete, Sound Wall. See Addendum #2, dated September 11, 2012, for updated bid item list and revised Summary of Quantity Q-2 (Sheet 203).
Response posted 08/24/2012




Inquiry #12: Please see note on sheet 14 of the layout drawings lower left hand corner of the page “HOUSE, POOL AND CONCRETE WALK TO BE PROTECTED IN PLACE”. Sound wall No. 1 at STA 13+00, as shown on sheet 205, is in contact with the corner of the existing house. The deep footing at this wall is +/- 8.5’ deep. Please relocating the sound wall south +/- 5 feet to avoid the existing house.
Inquiry submitted 08/09/2012

Response #1:Submitted for consideration.
Response posted 08/11/2012


Response #2:The house and wall are in close proximity but are not in conflict. Special Provisions, Section 10-1.01, "ORDER OF WORK" has been revised to clarify the contractor's responsibility in protecting the property adjacent to the sound wall. See Addendum #2, dated September 11, 2012 for requirements.
Response posted 08/24/2012




Inquiry #13: Will the existing house located at the corner of Carmel Drive and Stinson Drive be demolished by others? If not please add a bid item for this work.
Inquiry submitted 08/09/2012

Response #1:Submitted for consideration.
Response posted 08/11/2012


Response #2:The house is to be protected in place as shown on Layout L-3 (Sheet 14). See response to Inquiry #12 for additional clarification.
Response posted 08/24/2012




Inquiry #14: On sheet X-6(7) the patterned minor concrete is shown at .3' thick. On sheet C-18(57) the patterned minor concrete is shown at 6" thick. Please clarify which is correct
Inquiry submitted 08/13/2012

Response #1: Submitted for consideration.
Response posted 08/13/2012


Response #2:Minor Concrete (Patterned) is to be 6" thick. Typical sections have been revised to reflect this. See Addendum #2, dated September 11, 2012, for updated Typical Sections sheets.
Response posted 08/24/2012




Inquiry #15: The traffic control charts on pages 107 and 108 of the special provisions do not allow for any night-time lane closures. Is it the Owner's intent to limit all construction work requiring lane closures to between the hours of 6a.m. and 6p.m.?
Inquiry submitted 08/15/2012

Response #1: Submitted for consideration.
Response posted 08/17/2012


Response #2:Night work will be allowed for erecting and taking down falsework as shown on Traffic Handling Plan TH-8 and TH-9 (Sheets 160 & 161). Lane closure charts have been revised accordingly. See Addendum #2, dated September 11, 2012 for updated Lane Closure Charts.
Response posted 08/24/2012




Inquiry #16: The traffic control charts on page 107 of the special provisions limit work on the "EB On-ramp from SR 41" and the "WB Off-ramp to SR 41" to between the hours of 6a.m. to 6p.m. Is the Owner's intent for the contractor to re-open each on/off-ramp to public traffic between the hours of 6p.m. to 6a.m.?
Inquiry submitted 08/15/2012

Response #1: Submitted for consideration.
Response posted 08/17/2012


Response #2:"EB On-Ramp from SR41" and "WB Off-Ramp to SR41" can be closed for a maximum of 45 days during Stage 3B. Detours are to be provided as shown on Construction Area Signs CS-5 (Sheet 144). Lane closure charts have been revised accordingly. See Addendum #2, dated September 11, 2012, for updated Lane Closure Charts.
Response posted 08/24/2012




Inquiry #17: Please reference the MSE typical section on sheet no. 329; it shows a 9' minimum width for the structural excavation and backfill. Does this mean the structural excavation could be as wide as the distance in front of the wall plus the wall width plus the soil reinforcement elements plus 1' behind the elements? If that is the case, the structural excavation width would be 29' 9" when the base width is 27'. Please clarify how to figure the width of the structural excavation.
Inquiry submitted 08/15/2012

Response #1: Submitted for consideration.
Response posted 08/17/2012


Response #2:Refer to Addendum No. 2 dated September 11, 2012. Refer to the revised "Typical Section" view on plan sheet 329 for the formula denoting the width of the structure excavation and structure backfill below the MSE wall. Refer to the "Mirrored Elevation" views on plan sheets 329 thru 332 for BW (base width of wall segment).
Response posted 08/24/2012




Inquiry #18: Please reference Traffic Handling Plans TH-2, TH-3, and TH-4 (sheets 154-156); these plans show temporary pavement being installed in the median. The plan view/sections show the temporary pavement at 20' wide; this width would require the removal of this existing inside shoulders. Is that the intention?

Inquiry submitted 08/17/2012

Response #1:Submitted for consideration.
Response posted 08/20/2012


Response #2:The plans have been revised to clarify the median construction and limits of temporary pavement. The intent is for the existing shoulders to be removed and reconstructed, as shown on the revised plans. Temporary pavement will also be required between the shoulders to facilitate a crossover of traffic to allow for the erection and removal of falsework. Please see Addendum #2, dated September 11, 2012 for the revised plans.
Response posted 08/24/2012




Inquiry #19: The plans call out for traffic cones to be used in stage construction along 198. Traffic cones will be a maintenance issue, Caltrans should change to surface mounted channelizers.
Inquiry submitted 08/18/2012

Response #1:Submitted for consideration.
Response posted 08/20/2012


Response #2:The contractor should bid on the plans as shown with the traffic cones.
Response posted 08/23/2012




Inquiry #20: There is an existing masonry soundwall located near the Motel 6 fence line to eastbound Rte 198 at approx. stations 502 - 505, per typcial cross section plan sheet X-6, the new C-Line connector improvements appear to be widened to the Caltrans right of way thourgh this wall. Plan layout sheets L-2 & L-4 also do not indicate the existence or removal of this existing wall. Does this existing wall get removed as part of the new improvements, and if so, were does this work get paid for?
Inquiry submitted 08/21/2012

Response #1:Submitted for consideration.
Response posted 08/21/2012


Response #2:The existing wall does get removed and disposed of as part of this project. This work is to be paid for under Bid Item #45 - Clearing and Grubbing as described in Section 16 of the Standard Specifications.
Response posted 08/23/2012




Inquiry #21: Layout drawings L-2 & L-3 on the “A” line station 503+46.38 LT to 509+52.29 LT, list “Sound Wall Removal” between these stations. Under what item are we paid for the Sound Wall Removal?
Inquiry submitted 08/21/2012

Response #1:Submitted for consideration.
Response posted 08/22/2012


Response #2:This work is to be paid for under Bid Item #45 - Clearing and Grubbing as described in Section 16 - Clearing and Grubbing of the Standard Specifications and Section 10-1.31 - Clearing and Grubbing of the Special Provisions. Specifically reference paragraph 2 of Section 16-1.03 - Construction of the Standard Specifications.

Response posted 08/23/2012




Inquiry #22: Layout drawings L-3 “A” line station 509+52.29 LT to “19th” line 27+46.13 LT list “Remove Masonry Wall” between these stations. Under what item are we paid for the Remove Masonry Wall?
Inquiry submitted 08/21/2012

Response #1:Submitted for consideration.
Response posted 08/22/2012


Response #2:This work is to be paid for under Bid Item #45 - Clearing and Grubbing as described in Section 16 - Clearing and Grubbing of the Standard Specifications and Section 10-1.31 - Clearing and Grubbing of the Special Provisions. Specifically reference paragraph 2 of Section 16-1.03 - Construction of the Standard Specifications.

Response posted 08/23/2012




Inquiry #23: On sheet 339 of 352, on Section A-A it shows the basket being 2'-6" tall. On the Half Gabion Cage Detail, it shows the basket being 1'-6" tall. Can you please confirm the height.
Inquiry submitted 08/21/2012

Response #1:Submitted for consideration.
Response posted 08/22/2012


Response #2:Refer to Addendum No. 2 dated September 11, 2012.

Response posted 09/20/2012




Inquiry #24: On pg 339 of 352, on the half gabion cage detail, it shows the wire fabric to be 3"x3". In talking with your approved vendor. the 3"x 3" is an old spec. The current spec is 6"x9" welded wire fabric. Is this acceptable?
Inquiry submitted 08/21/2012

Response #1:Submitted for consideration.
Response posted 08/22/2012


Response #2:No. Changing the pre-approved proprietary earth retaining system welded wire wall's dimensions without approval is not acceptable. In Section 10-1.34, "HALF GABION RETURN WALL," of the special provisions states: "Cage sizes and the overall plan and profile dimensions of the basket structures shall be as shown on the plans." Stay with the 3" x 3".
Response posted 08/27/2012




Inquiry #25: On pages 209 - 214, show irrigation removal plan. How is this work to be paid for?
Inquiry submitted 08/21/2012

Response #1:Submitted for consideration.
Response posted 08/22/2012


Response #2:Work shown on the irrigation removal plan is to be paid for under Bid Item #61 - Irrigation System as described in Section 20-5 - Irrigation Systems of the Standard Specifications and Section 10-2 Highway Planting and Irrigation Systems of the Special Provisions. Specifically, reference paragraph 4 of Section 20-5.05 - Payment of the Standard Specifications.
Response posted 08/23/2012




Inquiry #26: The project Special Provisions added section 6-1.085 Buy America. I do not see a Federal aid number within the specifications.

Please confirm that this project is NOT subject to the "Buy America" material requirement for steel products.

Inquiry submitted 08/22/2012

Response #1:Submitted for consideration.
Response posted 08/22/2012


Response #2:SSP 6-1.085 Buy America is an amendment to the Standard Specifications. Since there is no Federal Aid Number, this section does not apply.
Response posted 09/19/2012




Inquiry #27: Refer to sheet #103 (DP-7). please provide the specification for the 36" rgrcp (city of lemoore L100079)

Inquiry submitted 08/23/2012

Response #1:Submitted for consideration.
Response posted 08/24/2012


Response #2:The portion of irrigation pipe shown on Sheet 103 (DP-7) between Station 525+05.44 "A" Line, 96.17' Lt and Station 513+62.46 "WBE" Line, 113.96' Lt and labeled as 'Irrigation Pipe Improvements Per City of Lemoore (L100079)' has already been installed by the City of Lemoore under a separate City administered project. L100079 is the City's project number for that project. This stretch of pipe is being shown for reference purposes as Drainage System 13(n) and 13(h) join this pipe on either end. No specifications are necessary for the portion of pipe already installed by the City.
Response posted 08/24/2012




Inquiry #28: Special Provisions Sections 10-1.85 and 10-1.86 are unclear, seem to conflict and are confusing. Please clear up your requiremet before bid date.
Inquiry submitted 08/23/2012

Response #1:Submitted for consideration.
Response posted 08/24/2012


Response #2:Section 10-1.85 "CONCRETE BARRIER" has been revised for clarification and section 10-1.86 "CONCRETE BARRIER" has been deleted. Please see Addendum #2, dated September 11, 2012.
Response posted 09/24/2012




Inquiry #29: On sheet 329 of the plans 19th Street Overcrossing the Design H for the Sound Wall is 6 ft. When the 3 ft. is subtracted for the barrier it leaves 3ft. Does you want the Sound Wall to be 3ft. as this is not of full Block Demensions or is it to be 3ft. 4in. to make it a full 5 Courses? Also are we to use the same pattern as the other 2 Sound Walls or is it going to be only the Field Block on this Wall?
Inquiry submitted 08/26/2012

Response #1:Submitted for consideration.

Response posted 08/27/2012


Response #2:Refer to Addendum No. 2 dated September 11, 2012.

Response posted 09/20/2012




Inquiry #30: “Half-Gabion Return Wall” These items are a result of reviewing Sheet 339 of 352 of the project plans.

1. Does Caltrans really want 3”x3” mesh instead of 6x9 wire as shown in the detail?
2. Standard HRW mat widths are 7.5’ wide, not 8’ as shown.
3. A stiffener mat is not used in an 18” lift as shown, but was used by HRW in an old 24” lift system. Ultimately, this stiffener mat is not necessary or beneficial.
4. For a 6x9 wire mat, the length would typically be 4.5’ not 4’ at shown.
5. The Half Gabion Cage Detail at the top of this sheet shows 18” lift, and Section A-A at the bottom, calls out 2’6” lift.

Inquiry submitted 09/26/2012

Response #1:Submitted for consideration.
Response posted 09/26/2012


Response #2:Refer to the response to Bidder Inquiry #24 Changing the pre-approved proprietary earth retaining system welded wire wall's dimensions without approval is not acceptable.
In Section 10-1.34, "HALF GABION RETURN WALL," of the special provisions states:

"Cage sizes and the overall plan and profile dimensions of the basket structures shall be as shown on the plans. "

Stay with the 3" x 3". Also refer to Addendum No. 2 dated September 11, 2012 for revised plan sheet 339 of 352.

Response posted 10/03/2012




Inquiry #31: Please look into the bid item # 99F. Overhead sign quantities show a total of three signs; one sign weighing 87,435lbs. This is incorrect. Please verify the weights.
Inquiry submitted 09/26/2012

Response #1:Submitted for consideration.
Response posted 09/27/2012


Response #2:The Contractor is directed to bid the item as shown on the plans and specified in the specifications. The State will pay the specified final pay quantity in accordance with Section 9-1.015 of the Standard Specifications.
Response posted 10/01/2012




Inquiry #32: Please Reference Sheet SQ-4. The Pay quantity for sign D is extremely high compared to the actual weight. Please review.
Inquiry submitted 09/26/2012

Response #1:Submitted for consideration.
Response posted 09/27/2012


Response #2:The Contractor is directed to bid the item as shown on the plans and specified in the specifications. The State will pay the specified final pay quantity in accordance with Section 9-1.015 of the Standard Specifications.
Response posted 10/01/2012




Inquiry #33: Item 61 IRRIGATION SYSTEM includes as part of it's scope the relocation of two water meters. According to the utility plans the water main that these were attached to is being abandoned as a part of this contract, but I do not see that a new waterline is being installed to replace it. At the meter location on the north side of Hwy 198 there seems to be a water main in the nearby street which is indicated to be "new installed by others". Is it the intent that the old water meter be attached to this water main?

On the south side of 198 there is no new water main shown where the new meter location is indicated. How is this meter to be relocated if there is no water main to connect to?

I have been in touch with the Director of Public Works for the City of Lemoore and to the Water department and so far have not been able to find anyone who nows anything about this. Was there a contact with the Water Department about this work? If so, please give the contact information.

With the information provided it is not possible to estimate the cost for this work. Please make the relocation of the two water meters payable either as extra work or by an allowance.

Inquiry submitted 09/30/2012

Response #1:Submitted for consideration.
Response posted 10/01/2012


Response #2:The water meter on the north side of Route 198 is to be relocated from the position shown on IR-2 (Sheet 210 of 352) to the position shown on Sheet IP-1 (Sheet 215 of 352). This water meter is currently attached to an abandoned water main (the water main was recently abandoned by the utility owner). As part of this contract, the water meter is to be relocated west to the location shown on IP-1 and is to be connected to the water main labeled 'RELOCATED WATER FACILITY' as shown on IP-1. The 'relocated water facility' is a new water main that was installed by the utility owner when the water main to the east was abandoned.

The water meter on the south side of Route 198 is to be relocated from the position shown on IR-3 (Sheet 211 of 352) to the position shown on Sheet IP-2 (Sheet 216 of 352). This water meter is currently attached to an abandoned water main (the water main was recently abandoned by the utility owner). As part of this contract, the water meter is to be relocated west to the location shown on IP-2 and is to be connected to the water main labeled 'RELOCATED WATER FACILITY' as shown on IP-2. The 'relocated water facility' is a new water main that was installed by the utility owner when the water main to the east was abandoned.

Response posted 10/01/2012






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.