Caltrans Office Engineer

Viewing inquiries for 04-151134

Submit new inquiry for this project


Inquiry #1: Are there any cross sections for the project? If so, will they be posted on the website?
Inquiry submitted 08/31/2012

Response #1:You can download the cross sections from the link below:


Response posted 08/31/2012




Inquiry #2: There seems to be no work/value associated to bid item #119 TOS Location 7, if i am correct this bid item should be deleted, please confirm all systems are existing. THANK YOU!!
Inquiry submitted 09/05/2012

Response #1:Submitted for consideration.
Response posted 09/05/2012


Response #2:The work on Location 7 is to install a traffic monitoring station (loops detectors) on the off-ramp.
Response posted 09/07/2012




Inquiry #3: Sheet number 119, E-22 indicates "Lighting location no. 21". Please change this sheet to read "Lighting Location no. 19", THANK YOU!!
Inquiry submitted 09/05/2012

Response #1:Submitted for consideration.
Response posted 09/05/2012


Response #2:Sheet No. 119 (E-22) shows Location 21 and 22. E-22 is correct in not stating Location No. 19. See Sheet LC-1.
Response posted 09/07/2012




Inquiry #4: Section 10-1.28 of the Special Provisions states that "At the locations and to the limits shown on the plans, material below the bottom of retaining wall footings shall be removed and replaced with Class 3 aggregate base...". I find no locations or limits indicated on the plans that identify this. Is it CalTrans' intent to have all the retainng wall footings sub-excavated, or is this an error in the special provisions.
Inquiry submitted 09/06/2012

Response #1:Submitted for consideration.
Response posted 09/07/2012


Response #2:The Special Provisions are correct and there is currently no retaining walls that show the sub-excavation.
Response posted 09/10/2012






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.