Inquiry #1: 1.Plan Sheet No. 4 (L-1) Note #2 States "Roadside Clearing will consist of plant removal only".
Should the contractor assume "plant removal" includes trees, brush and grass?
If trees are to be cleared does this include the stumps?

Inquiry submitted 05/02/2013

Response #1: 5/3/13:Your question is under review. If a response is not issued before bid opening addressing your concern, please bid per the current contract documents. Thank you for your patience.
Response posted 05/03/2013


Response #2:5/6/13: [1] Yes.
[2] Please refer to Section 20-7.03B Roadside Clearing of the 2010 Standard Specifications.

Response posted 05/06/2013




Inquiry #2: Plan sheet 24 (Q-1)
Roadway Quantities Table:

1. What is the 330 ton AC Structure ?

2. What makes up the 380 SQYD Place HMA (Misc Area)?
There is no mention of it in a detail or on the Layout sheets.




Inquiry submitted 05/02/2013

Response #1:5/3/13:Your question is under review. If a response is not issued before bid opening addressing your concern, please bid per the current contract documents. Thank you for your patience.
Response posted 05/03/2013


Response #2:5/6/13: [1] The 330 ton "AC Structure", shown on the Roadway Quantities chart under HMA (Type A) is the quantity for the full depth structural section as shown on the typical cross sections as differentiated from the areas of overlay and/or superelevation change.
[2] The 380 SQYD of Place HMA (Misc Area), shown on the Roadway Quantities chart corresponds to the "AC Gutter" shown under "Minor HMA" on the same chart.

Response posted 05/06/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.