Inquiry #1: Specifications included sections for recycled water, but none called out on irrigation plans, Please Clarify.
Inquiry submitted 07/15/2014

Response #1: Submitted for consideration.
Response posted 07/15/2014


Response #2: Recycled water is not specified for the irrigation system in this project. Revised Standard Specifications applicable to the 2010 Standard Specifications are included in the Notice to Bidders and Special Provisions for this contract.
Response posted 07/18/2014




Inquiry #2: Irrigation sprinkler schedule sheet ISS-1 has callout for note # 9. there are only 8 notes shown. Please clarify.
Inquiry submitted 07/15/2014

Response #1: Submitted for consideration.
Response posted 07/15/2014


Response #2: The note numbers shown for sprinkler assemblies under Remarks in the Irrigation Sprinkler Schedule appear to be a typographical error. The note references should be 7 and 8.
Response posted 07/18/2014




Inquiry #3: Controller bid item# 22 call out for wall mounted controller. There is no bid item for a enclosure for this unit. Where is this controller to be installed?
Inquiry submitted 07/15/2014

Response #1: Submitted for consideration.
Response posted 07/15/2014


Response #2: Refer to Section 20-2.07B(2)(a) of the Special Provisions. The enclosure is part of the irrigation controller item. Section 20-2.07C “Construction” of the Revised Standard Specifications states, “Locate irrigation controllers in pedestal or wall mounted enclosures as shown.” The irrigation controller cabinet is shown on Irrigation Plan IP-1, sheet 11 of the plans.
Response posted 07/18/2014




Inquiry #4: Does this project need the implementation of Fiber Rolls and Drain Inlet Protection? Typically there are bid items for these BMP's. Please clarify.
Inquiry submitted 07/18/2014

Response #1: Submitted for consideration.
Response posted 07/21/2014


Response #2: The estimated quantities for these items were minor; therefore separate bid items were not needed for payment. Refer to Section 9-1.03 “PAYMENT SCOPE” which states,
“Full compensation for work specified in divisions I, II, and X is included in the payment for (all) the bid items unless:
1. Bid item for the work is shown on the Bid Item List.”
Refer to the requirements of Sections 13-2 “WATER POLLUTION CONTROL PROGRAM” and 13-4 “JOB SITE MANAGEMENT.”

Response posted 07/23/2014




Inquiry #5: What is the Risk Level of this project?
There are no line items for SWPPP ph testing or Reaps?
Depending on the risk level, how are these items to be paid?

Inquiry submitted 07/21/2014

Response #1: Submitted for consideration.
Response posted 07/21/2014


Response #2: This project doesn’t require a Storm Water Pollution Prevention Plan, and therefore a risk level designation is not required. A Water Pollution Control Program is required; refer to Section 13-2 “WATER POLLUTION CONTROL PROGRAM.” The soil disturbance from work activities must be maintained at less than one acre. Refer to Section 9-1.03 “PAYMENT SCOPE” which states,
“Full compensation for work specified in divisions I, II, and X is included in the payment for (all) the bid items unless:
1. Bid item for the work is shown on the Bid Item List.”

Response posted 07/23/2014






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.