Inquiry #1: The plans call for the removal and replacement of the inside shoulder of I-10 Eastbound from Station 1277+16 to 1301+00. There is no contract item for the removal of the existing shoulder. Please clarify where the removal of this shoulder is to be paid.
Inquiry submitted 09/19/2013

Response #1:Submitted for consideration.
Response posted 09/19/2013


Response #2:Removal of the existing shoulder is paid for under roadway excavation. Refer to section 19-2 of std specs.
Response posted 09/20/2013




Inquiry #2: The plans call for construction of the jointed plane concrete pavement (JPCP) on I-10 Eastbound from Station 1285+00 to 1296+71.12. There is no contract item for the removal of the existing surfacing/subgrade that is necessary to construct the new JPCP . Please clarify where the removal of the surfacing/subgrade is to be paid.
Inquiry submitted 09/19/2013

Response #1:Submitted for consideration.
Response posted 09/19/2013


Response #2:See response to inquiry #1.
Response posted 09/20/2013




Inquiry #3: There are concrete panel replacements throughout the project both Eastbound and Westbound. Please clarify where the removal of the existing concrete is paid.
Inquiry submitted 09/19/2013

Response #1:Submitted for consideration.
Response posted 09/19/2013


Response #2:Removal of existing concrete is included in payment for JPCP (rapid strength concrete). Refer to section 41-9 of std specs.
Response posted 09/20/2013




Inquiry #4: The plans call for the construction of concrete pavement at the ramp termini's on Dillon Road, both Eastbound and Westbound. There is no contract item for the removal of the existing surfacing/subgrade that is necessary to construct the new concrete pavement. Please clarify where the removal of the surfacing/subgrade is to be paid.
Inquiry submitted 09/19/2013

Response #1:Submitted for consideration.
Response posted 09/19/2013


Response #2:Same response as inquiry #1.
Response posted 09/20/2013




Inquiry #5: On the summary of quantities Q-3 (Page 44), it shows PCCP grinding from Stations 1283+55 to 1459+25 both Eastbound and Westbound.

Will the panel replacments be ground with the rest of the highway and be included in the SY payment for Item 53 - Grind Existing Concrete Pavement?

Will new JPCP from Station 1285+00 to 1296+71.12 be ground with the rest of the highway and be included in the SY payment for Item 53 - Grind Existing Concrete Pavement?

Inquiry submitted 09/19/2013

Response #1:Submitted for consideration.
Response posted 09/19/2013


Response #2:Yes.
Response posted 09/20/2013




Inquiry #6: Caltrans has released latest revisions to the Superpave NSSP dated 08-30-2013. These latest revisions include some modifications to the Superpave specifications that are not included in Contract#08-0K2304 (Page 51, 39-5 HOT MIX ASPHALT , SUPERPAVE). The Caltrans contact for additional information on these latest revisions to the Superpave NSSP is Joe Peterson, Chief, Office of Roadway Materials Testing METS.

Will Caltrans issue a change order to include the latest revisions to the Superpave NSSP for Contract#08-0K2304 as issued by the Office of Roadway Materials Testing METS?

Inquiry submitted 09/20/2013

Response #1:Submitted for consideration
Response posted 09/20/2013


Response #2:Please bid per the current Contract Documents.
Response posted 09/27/2013




Inquiry #7: Can you please clarify which cracks (asphalt shoulders or concrete freeway) get treated in Bid Item 34 - Crack Treatment.

Section 37-5.03 states that the reservoir must be 1/2 inches wide by 1/2 inches deep. Should the crack be routed to obtain this?

Section 37-5.03 states to fill the crack recessed 1/4" and fill the crack overband not more than 3 inches wide. These conflict, please clarify.

Inquiry submitted 09/25/2013

Response #1:Submitted for consideration
Response posted 09/26/2013




Inquiry #8: What is the meaning of the two closure charts on Page 13 of the Special Provisions? One chart states that one lane of traffic can be maintained for EB traffic 24/7, and the other chart restricts it to both EB and WB from 0700 to 1600 (7am to 4pm). Please clarify.
Inquiry submitted 09/27/2013

Response #1:Submitted for consideration.
Response posted 09/27/2013


Response #2:Remarks were inadvertedly left off chart No. 2.
Chart no. 2 is for lane drop only and chart no. 1 is applied to other areas.
Response posted 10/02/2013




Inquiry #9: Where is of the pre paving inertial profiler and grinding to be performed on this job? Traffic lanes on the mainline highway have no asphalt work, and CAL TRANS specs currently state that shoulders do not require profilograph. Please clarify.
Inquiry submitted 09/27/2013

Response #1:Submitted for consideration.
Response posted 09/27/2013




Inquiry #10: The specifications in Contract#08-0K2304 for the following items differ from the latest revisions that Caltrans has released (Superpave NSSP dated 08-30-13. Contact-Joe Peterson, Chief, Office of Roadway Materials Testing METS)


VMA for RHMA-SP-G:

Caltrans Contract 08-0K2304: 19.0-24.0 (Page 54)
Caltrans Superpave NSSP 08-30-2013: 18.0-23.0

Hamburg Wheel Track Test temperature for PG64 oil for RHMA-SP-G:

Caltrans Contract 08-0K2304: 140 +/- 2 degrees F (Page 58)
CT Superpave NSSP 08-30-2013: 122 +/- 2 degrees for PG 64

Minimum Dry Tensile Strength for RHMA-G:

Caltrans Contract 08-0K2304: 120 psi (Page 54)
Caltrans Superpave NSSP 08-30-2013: 110 psi


Will Caltrans issue a change order for Contract#08-0K2304 on the above Items ?

Inquiry submitted 10/02/2013

Response #1:Submitted for consideration.
Response posted 10/03/2013






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.03, “Examination of Plans, Specifications, Contract, and Site of Work,” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.