Inquiry #1: What Work Category Codes did Caltrans use to establish the DBE percentage goal?
Inquiry submitted 04/28/2017

Response #1:Please bid in accordance with Section 2-1.12, "Disadvantaged Business Enterprises," of the Revised Standard Specifications (RSS). The RSS can be found in the back of the Notice to Bidders and Special Provisions book.
Response posted 04/28/2017




Inquiry #2: Charts K1, K2 and K3 on pages 12 - 14 of the special provisions note specific times where "No work is allowed". Please confirm that these charts do not apply to the work to be performed during Stage 2, 3 and 4 behind K-Rail. If these charts do apply, and work cannot be performed for Stages 2, 3 and 4 during the hours specified on the charts as "No work is allowed", may the contractor install temporary traffic screen on top of the temporary k-rail in order to be allowed to perform work during these hours.
Inquiry submitted 05/09/2017

Response #1:Contractor can work behind K-Rail at night time if noise doesn't exceed limit mentioned in Section 14-8.
Response posted 05/09/2017




Inquiry #3: We request that Caltrans consider lowering the DBE goal on this project based on the micropile and sheet pile materials being department furnished.
Inquiry submitted 05/10/2017

Response #1: Please bid in accordance with Section 2-1.12, "Disadvantaged Business Enterprises," of the Revised Standard Specifications (RSS). The RSS can be found in the back of the Notice to Bidders and Special Provisions book.
Response posted 05/12/2017




Inquiry #4: The soil parameters shown on Sheet 47 of the plans for the Shoring Wall show a unit weight of 130.5 lb/ft^3 and an internal friction angle of 30 degrees. The information handout on page 69 of the pdf (page 2 of document #EA 33340K) show a unit weight of 110 lb/ft^3, cohesion of 150psf, and a friction angle of 10 degrees. Please confirm which is the correct soil parameters to use for the Shoring Wall
Inquiry submitted 05/15/2017

Response #1:The correct Soil properties are unit weight of 110 lb/ft^3, cohesion of 150psf, and a friction angle of 10 degrees.
Response posted 05/15/2017




Inquiry #5: Sheet 35 of the plans shows an anchor design of 303.5 kip for the Escondido Beach Landslide ground anchors. Please provide the geotechnical design report that is the basis for the 303.5 kip anchor design.
Inquiry submitted 05/15/2017

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/15/2017




Inquiry #6: Is there a pre-bid meeting/ job walk?
Inquiry submitted 05/15/2017

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/15/2017




Inquiry #7: We are unable to open the Bid Book. Please provide a PDF version of the Bid Book.
Inquiry submitted 05/23/2017

Response #1:The bid book and all related files open with no problems.

You need Bid Express software (last paragraph) to open up the bid book and follow the steps in guideline to be able to bid on projects; Please follow the direction given in the Electronic Bidding Guide at:

http://www.dot.ca.gov/hq/esc/oe/electronic_bidding/docs/ElectronicBiddingGuide.pdf

Bids can only be submitted electronically through Bid Express. To begin the electronic bidding process you will first need to receive a Bidder Identification Number (Bidder ID) from the California Department of Transportation (Caltrans). After you have received your Bidder ID number, you can then establish a Digital ID, and a Bid Express Internet Bidding (Bidx) account. The process of establishing a Digital ID can take 7 days or longer. You will not be able to submit a bid until this process has been completed.
To receive your Bidder ID, submit a letter requesting a Bidder ID to Office Engineer. The letter requesting a Bidder ID number must be on company letterhead, showing the full legal name, phone number, fax number and address of the bidding company, along with an email address to which the Bidder ID number will be sent. The letter can be faxed to Office Engineer at (916)227-6282, or mailed to:
MS43
Office Engineer
Department of Transportation
1727 30th Street
Sacramento CA, 95816-7005
BID Express Info:
Contact Bid Express

By mail:
Bid Express
5700 SW 34th Street, Suite 1235
Gainesville, FL 32608-5371

By phone or FAX:
Toll free phone: (888) 352-BIDX (2439)
Phone: (352) 381-4888
Fax: (888) 971-4191
By email:
Support: customer.support@bidx.com
Customer support for the Bid Express service is available by phone or email Monday through Friday from 7:00 am - 8:00 pm Eastern Time, excluding legal holidays.

Response posted 05/23/2017




Inquiry #8: Is the contractor allowed to work during the day during Stage 2, 3 and 4 without traffic screen installed on the krail.
Inquiry submitted 05/25/2017

Response #1:The Contractor is allowed to perform construction activities during the hours designated as “No work is allowed” on charts K1, K2 and K3, if he/she installs temporary traffic screens on top of the Type K temporary railings. Traffic screens are not allowed on the right side of traffic within the limits of a right horizontal curve with a radius of less than 2,000 feet as viewed in the direction of travel or on the left side of traffic within the limits of a left horizontal curve with a radius of less than 2,000 feet as viewed in the direction of travel.

The Department does not pay for furnishing, installing, maintaining, or removing temporary traffic screens that the Contractor elects to install on top of the Type K temporary railings.

Response posted 05/25/2017




Inquiry #9: Can you please give the address and contact person for submitting the Bidder's Bond prior to Bid Due date?
Is CALTRANS Bidder's Bond Form "DES-OE-0102.3(REV 08/2016) the form to be used for Bidder' Bond?

Inquiry submitted 05/25/2017

Response #1:Please submit an electronic bidder's bond with the electronic bid or submit Bidder's bond to:

MS43
Office Engineer
Department of Transportation
1727 30th Street
Sacramento CA, 95816-7005

Caltrans bidder's bond form to be used is "DES-OE-0102.3(REV 08/2016)".

Response posted 05/26/2017




Inquiry #10: Section 6 Control of Materials states that the Department will furnish the contractor with the micropiles and the sheet piles. Please confirm that the Department will load the material onto the Contractor's truck.
Inquiry submitted 05/26/2017

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/26/2017




Inquiry #11: For item 60(F) Chain Link Railing (Modified), the plan pages show it to be mounted to the side of an I-Beam. Will a detail for this modification be issued before bid time?
Inquiry submitted 05/26/2017

Response #1:Your inquiry has been received and is being reviewed. Thank You for your patience.
Response posted 05/26/2017




Inquiry #12: Sheet 22 shows a quantity of 222 LF to "Prepare and Stain Concrete - Concrete Barrier (Type 736B)". What is the requirements/specifications for the stain?
Inquiry submitted 05/26/2017

Response #1:See Specification Section 78-4.04.
Response posted 05/26/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.