Viewing inquiries for 06-442544

Submit new inquiry for this project


Inquiry #1: Will precast double cell box culvert be allowed for systems 24b and 24c
Inquiry submitted 09/18/2017

Response #1:
Submitted for consideration.
Response posted 09/18/2017




Inquiry #2: Special provision 14-11.16C Site Conditions states: "An asbestos survey was performed for bridge no. 50-0316 and 50-0030. The relevant portions of the asbestos survey report are included in the Information Handout."

A survey report was not provided in the informational handout. Please provide a copy of the asbestos survey.

Inquiry submitted 09/20/2017

Response #1:
Submitted for consideration.
Response posted 09/20/2017




Inquiry #3: No lane closure chart is provided for TH-25 complete closure of I5. Advise if a chart will be provided.
Inquiry submitted 09/20/2017

Response #1:
Submitted for consideration.
Response posted 09/20/2017




Inquiry #4: The IH is missing cross section information for alignment ETRNS1 STA 415+01.05 to 423+00.00. Please provide the missing cross section and surface file.
Inquiry submitted 09/22/2017

Response #1:
Submitted for consideration.
Response posted 09/22/2017




Inquiry #5: Overhead sign structures are shown on sheet E-16, E-19, and E-22 which are noted as having power conductors routed to the signs, but no fixtures or sign controller are called out to be installed. Should there be fixtures, conduit and wire, and sign controllers at these locations?
Inquiry submitted 09/25/2017

Response #1:
Submitted for consideration.
Response posted 09/25/2017




Inquiry #6: The cross sections or layout sheets are not showing the limits for CRCP into the side streets or into Ramps 5 and 6. Can you please clarify if CRCP construction goes into the sides streets? and if so, how far into the side streets are the limits of construction for CRCP? Also, please clarify the limits for CRCP into ramps 5 and 6?


Based on the drawings, there is no reconstruction of Warren Drive and Aloma Street, (north and south of Route 46). Can you please clarify if Warren Drive and Aloma Street are not be reconstructed? Can you also clarify the limits of construction for Lawton Drive and for New County Road tying into Warren Drive and Aloma Street?

Inquiry submitted 09/25/2017

Response #1:
Submitted for consideration.
Response posted 09/25/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.