Viewing inquiries for 06-0S4704

Submit new inquiry for this project


Inquiry #1: Per Note 1 on Revised Standard Plan RSP P31B (Sheet No. 149 of plans), it states "For the locations of the terminal joints, expansion joints, and pavement anchors, see project plans." The plans do not show where these items are located. Please advise.
Inquiry submitted 08/07/2017

Response #1:Submitted for consideration.
Response posted 08/08/2017


Response #2:When CRCP (Continuously Reinforced Concrete Pavement) is introduced next to an approach slab of a bridge (those locations are shown on project plans and structure plans as conform stations), or on a ramp next to existing AC (Asphalt Concrete) pavement (those locations are shown as begin or end PCC Dike Type E conform stations), terminal joints are needed. For the type of joints needed, SP (Standard Plans) P31A shows Terminal Joint Type D which is for CRCP next to existing approach slabs, and it shows Terminal Joint Type A which is for CRCP next to existing AC pavement.
Response posted 08/14/2017




Inquiry #2: Cross section X-1, x-2, and x-3 do not identify the existing pavement section for the outside 10' shoulder. Please identify the existing 10' outside shoulder pavement section to be replaced.
Inquiry submitted 08/09/2017

Response #1:Submitted for consideration.
Response posted 08/11/2017




Inquiry #3: Reference Construction detail C-1. The 3D drawing at lower right indicates CRCP extends under PCC dike. Does the HMA base extend under as well? The 2D drawings along the top of the sheet confuse the issue. please advise.
Inquiry submitted 08/09/2017

Response #1:Submitted for consideration.
Response posted 08/11/2017




Inquiry #4: Please reconsider the answer to inquiry #1. Along with a terminal joint type D Caltrans typically places CRCP pavement anchors and an expansion joint type "AN" adjacent to a bridge structure. Please specify by addendum, location and type of CRCP joints required.
Inquiry submitted 08/15/2017

Response #1:Submitted for consideration.
Response posted 08/15/2017




Inquiry #5: As a follow up to the response to Inquiry #1 – please provide a summary of quantity including station locations for the terminal joints. Also, please provide how this work will be paid for since on other contracts work associated with the joints have their own bid items.
Inquiry submitted 08/15/2017

Response #1:Submitted for consideration.
Response posted 08/15/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.