Inquiry #1: In the IH provided there is a site location map Figure #1 PM19.5 to 30.5. There is also a project plan sheet that shows the locations of work for the project. Specifically with regards to the Z-2 ADL soil locations #1, #5 & #6, does the Table 1 ADL data number provided apply directly to the same numbered work site location?

Inquiry submitted 07/05/2017

Response #1:Yes, ADL locations shown in information handout table apply directly to the same numbered work site location.
Response posted 07/06/2017




Inquiry #2: In spec section 5-1.25 Automated Machine Guidance control, it mentions submitting a QC plan, having a QC Technician, check testing, grade verification and Grade QC. Will the contractor be required to furnish the state with all of these added costs if we are using the state furnished slope stakes and rough grade stakes, or will this only be required if we elect to not use the State furnished slope stakes and rough grade states?
Inquiry submitted 07/12/2017

Response #1:Submitted for consideration.
Response posted 07/12/2017


Response #2:The contractor has the option to use Automated Machine Guidance(AMG) control. If AMG is used, providing a QC plan, a QC technician, check testing, grade verification and Grade QC as described in Section 5-1.25 of the special provisions is required.

The state will furnish survey control points to support AMG as described in Section 5-1.24B Department Construction Surveys for Automated Machine Guidance of the special provisions.

If the contractor does not elect to utilize AMG for construction, then the Department will furnish slope staking as described in Section 5-1.24A of the special provisions.

There is not a specific bid item for AMG. Full compensation for AMG is in the various bid items; reference section 9-1.03 Payment Scope of the Standard Specifications:

Full compensation for work specified in divisions I, II, and XI is included in the payment for the bid items involved unless:

1. Bid item work is shown on the Bid Item List
2. Work is specified as change order work

Response posted 07/14/2017




Inquiry #3: Will the state please provide the depth for the 8" WSP that is to be bored underneath the Freeway near Shaw Ave Over-crossing (Bid item 43)?
Inquiry submitted 07/12/2017

Response #1:Submitted for consideration.
Response posted 07/12/2017


Response #2:Attention is directed to Section 20-2.07C(2)(a) Welded Steel Pipe Conduit of the 2015 Standard Specifications: “Install top of conduits from… 40 to 52 inches below the finished grade in other paved areas.”
Response posted 07/14/2017




Inquiry #4: Per Bid Item #24 - Roadway Excavation (Type Z-2)(Aerially Deposited Lead), will the trucking of this material be required to pay prevailing wage?

Inquiry submitted 07/13/2017

Response #1:Submitted for consideration.
Response posted 07/14/2017


Response #2:Yes.
Response posted 07/17/2017




Inquiry #5: PLEASE CONFIRM THAT ANY EXCAVATION THAT SHOWN TO BE PERFORMED IN AREAS WHERE TYPE Z-2 LEAD IS PRESENT, IT SHALL HANDLED AND PAID FOR UNDER BID ITEM 24. HOW WILL THE BACKFILL BE PAID FOR?
Inquiry submitted 07/16/2017

Response #1:Yes. There are no areas where we are removing ADL soil and replacing it with backfill.
Response posted 07/17/2017




Inquiry #6: Is the BOE (Board of Equalization) Fee for Remediation waste exempt? (Is an exemption Letter on file?)
Inquiry submitted 07/17/2017

Response #1:No. Exemption Letter may be generated after clean up, but status of Fee Exemption is not know until after the project closes.
Response posted 07/18/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.