Inquiry #1: In regard to page 11 of the special provisions; the thermo stripe application rate is wrong. 0.36 lb/ft is for 4" stripe 0.100 inch thick. For 6" stripe the rate should be 0.57 lb/ft for 0.100 inch thick.
This needs to be addressed so that all bidders are figuring the same amount of thermoplastic materials.

Inquiry submitted 07/11/2017

Response #1:Submitted for consideration.
Response posted 07/12/2017


Response #2:Refer to Addendum No. 1, dated July 14, 2017.
Response posted 07/21/2017




Inquiry #2: The DBE percentage for this project is currently at 15%. There are only a limited number of items that are available for the prime to sub out to prospective clients to cover the costs of meeting the DBE goal ($76,500 based on the Engineers Estimate). The higher cost of the new 6 inch stripe specification is directly impacting the cost and the difficulty in meeting this percentage.
Inquiry submitted 07/28/2017

Response #1:Please bid in accordance with Section 2-1.12, "Disadvantaged Business Enterprises," of the Revised Standard Specifications (RSS). The RSS can be found in the back of the Notice to Bidders and Special Provisions book.
Response posted 07/31/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.