Inquiry #1: Bid Item #62 "Minor Concrete (Minor Structure) is for 10 CY. These are two single headwalls for 24" diameter pipe. When I refer to Caltrans Standard page D89, "Straight Headwalls" D = 24" the chart tells me there is 1.20 CY per headwall. Plan sheet DQ-1 (plan sheet 13 of 64) says that there is 4.69 CY per headwall. Which is correct and why?
Inquiry submitted 05/02/2017

Response #1:Submitted for consideration.
Response posted 05/03/2017


Response #2:DQ-1 is correct. See the revised Standard Plan for RSP D89 below:


www.dot.ca.gov/dist4/construction/contracts/04-4H8804/Revised_Standard_Plan_RSP_D89.pdf


For revised 2015 Standard Plans, see:

http://www.dot.ca.gov/hq/esc/oe/project_plans/highway_plans/2015-RSP-and-NSP/Entire-2015-rsp-and-nsp.pdf


Response posted 05/04/2017




Inquiry #2:
Bid Item #62 "Minor Concrete (Minor Structure) is for 10 CY. These are two single headwalls for 24" diameter pipe. When I refer to Caltrans Standard page D89, "Straight Headwalls" D = 24" the chart tells me there is 1.20 CY per headwall. Plan sheet DQ-1 (plan sheet 13 of 64) says that there is 4.69 CY per headwall. Which is correct and why?

Inquiry submitted 05/03/2017

Response #1:Same question as above.
Response posted 05/03/2017




Inquiry #3: This project was an A + B, but that page is now missing from the Expedite bid. Did the A+B requirement change with one of the addendums?
Inquiry submitted 05/10/2017

Response #1:Submitted for consideration.
Response posted 05/11/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.