Inquiry #1: The Environmental Stewardship section of the Special Provisions calls out the need for a Contractor Supplied Biologist; however, there is not a Contractor Supplied Biologist bid item in the bid item list.
Inquiry submitted 10/04/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/04/2017


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 2, issued on Thursday, October 12, 2017.
Please bid per the current contract documents.
Response posted 10/12/2017




Inquiry #2: It appears the entire bridge structure is to be removed in whole, including footings. Could you please confirm why the footings would have to be pre-drilled before it is driven.
Inquiry submitted 10/09/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/09/2017


Response #2:
Your attention is directed to Section 60-2.01A of the Special Provisions. Contractor is to "Remove the existing Mud Creek bridge down to the top of footing slabs."
Please bid per the current contract documents.
Response posted 10/10/2017




Inquiry #3: Please reference plan sheet 18. for station BR 171+50 to 177+35 the Roadway Excavation and the Imported Borrow Item equals the Embankment Quantity(N) but for station BR 178+00 yo 184+50 the Roadway Excavation and the Imported Borrow is ~1,083 CY less then the Embankment Quantity. Is it Caltrans intention that the remaining Embankment Quantity(N) is to come from the Detour Removal or will additional material need to be imported?
Inquiry submitted 10/10/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/10/2017


Response #2:
Yes, the remaining Embankment material for the pullout area, "Br" 178+50 to 182+00 LT, is to come from Bid Item #25 - Roadway Excavation (Detour Removal). Your attention is directed to sheets Q-1 and SCQ-1 of the Project Plans.
Please bid per the current contract documents.
Response posted 10/10/2017




Inquiry #4: In reference to Section 13-12, Temporary Creek Diversion System, and Plan Sheet 6, will the required grading, installation of TCDS, as well as the removal of same, be allowed to be performed within the live stream channel and flows?
Inquiry submitted 10/10/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/11/2017


Response #2:
All work within the channel must comply with the specifications and PLACs.
Please bid per the current contract documents.
Response posted 10/17/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.