Viewing inquiries for 01-0B5504

Submit new inquiry for this project


Inquiry #1: Will Caltrans allow the use of Zoneguard barrier, in minimum deflection configuration, in lieu of the temporary barrier type K listed in the specs.
Inquiry submitted 07/27/2017

Response #1:Your inquiry has been received and is being reviewed.
Response posted 07/27/2017


Response #2:
Any proposed modifications will only be considered by the Engineer after the contract has been awarded.

Please bid per the current contract documents.

Response posted 08/01/2017




Inquiry #2: There is a discrepancy in the Structural Concrete, Headwall.

Drainage Profile DP-1 shows a 4’-8” Headwall. Drainage Details DD-2 shows a 6’-8”, Length: 26’ Headwall and Drainage Quantities DQ-1 only has 2 CY of Structural Concrete, Headwall.
The Quantities shown are not sufficient enough for a Structural Headwall that size. It would require more CY of Concrete. Please clarify.

Inquiry submitted 08/17/2017

Response #1:Your inquiry has been received and is being reviewed.
Response posted 08/17/2017


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 3, issued on Wednesday, August 23, 2017.
Please bid per the current contract documents.
Response posted 08/23/2017






The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, “JOB SITE AND DOCUMENT EXAMINATION” of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.