Rubberized Asphalt Concrete Project

Caltrans Flexible Pavement Materials Program

Contract 59A0258

Task Order 21 Deliverables

Category

Document Title

Adobe pdf

State of the Technology

  • Use of Scrap Tire Rubber – State of the Technology and Best Practices

Experimental Design

  • Generic Experimental Design for Product/Strategy Evaluation – Crumb Rubber Modified Materials

RAC Recycle

  • Feasibility of Recycling Rubber-Modified Paving Materials

Rubberized Asphalt Concrete

Warranty Pilot Projects

·         Volume 1 - Construction Report

o        Appendix A - Resident Engineers Packet

o        Appendix B - Ventura County, Highway 150 Data

o        Appendix C - Fresno County, Highway 33 Data

o        Appendix D - Merced County, Highway 140 Data

o        Appendix E - San Diego County, Highway 75 Data

o        Appendix F - Lassen County, Highway 395 Data

·         Volume 2 - Interim Performance Monitoring Report

o        Appendices

o        Deflection Database (require MS Access)

Click Here

Rubberized Asphalt Concrete

Firebaugh Project

(Fre-33)

·         Volume 1 - Construction Report

·         Volume 2 - Laboratory Test Report

o        Appendices

Rubberized Asphalt Concrete

District 1 Project

(Men-20)

·         Volume 1 - Work Plan

·         Volume 2 - Pre-Construction Report

o        Appendix A - Deflection Data

o        Appendix B - Distress Map and Rut Measurements

o        Appendix C - Photo Log

·         Volume 3 - Construction Report

o       Appendix A - Photo Log 

o        Appendix B- Test Data (Mix Q&A)

Synthesis of Caltrans RAC Evaluations

·         Synthesis of Caltrans Rubberized Asphalt Concrete Projects & Reports