CONSTRUCTION STORMWATER POLLUTION PREVENTION BULLETIN

Acrobat Library...

All issues of the Construction Bulletin, including the current issue, can be downloaded and viewed in Adobe Acrobat format, using Adobe Arobat Reader. If you don't already have Acrobat Reader, you can download it free from Adobe. CLICK HERE.

SEE "DOWNLOAD" NOTE AT BOTTOM
ISSUE:
Reverse date order
Files open in a
new browser window.
JUNE 2007 Construction Stormwater Bulletin, Vol. 7 Issue 5
MAY 2007 Construction Stormwater Bulletin, Vol. 7 Issue 4
APRIL 2007 Construction Stormwater Bulletin, Vol. 7 Issue 3
MARCH 2007 Construction Stormwater Bulletin, Vol. 7 Issue 2
FEBRUARY 2007 Construction Stormwater Bulletin, Vol. 7 Issue 1
NOVEMBER 2002 Year-Round Disturbed Soil Area Protection
OCTOBER 2002 Stormwater Inspections during Storm Events
SEPTEMBER 2002 Using Existing and Planned Permanent BMPs for Water Pollution Control
AUGUST 2002 Termination of NPDES Permit Coverage at Project Closeout
JULY 2002 Best Management Practice NS-5 - Clear Water Diversion
JUNE 2002 Water Pollution Control for Vehicle and Equipment Operations
MAY 2002 Hazardous Waste Management on the Construction Site
APRIL 2002 Stormwater Protection for Encroachment Permit Projects
MARCH 2002 Managing PCC Batch Plants
FEBRUARY 2002 Best Management Practice WM-3 – Stockpile Management
JANUARY 2002 Standard Special Provision 20-020 Move-In/Move-Out (Erosion Control)
DECEMBER 2001 Removal and Cleanup of Temporary BMPs
NOVEMBER 2001 Using Cross Barriers With Linear Sediment Controls
OCTOBER 2001 Construction Dewatering Operations–Dewatering Under the Caltrans Permit
SEPTEMBER 2001
SPECIAL EDITION
Project Spotlight – District 2
SEPTEMBER 2001 Construction Dewatering Operations Part III: Dewatering Under a RWQCB Permit
AUGUST 2001 Construction Dewatering Operations Part II: Sediment Treatment
JULY 2001 Construction Dewatering Operations Part I: Management Options and NPDES Permit Requirements
JUNE 2001 Non-Compliance Reporting for Construction Activities
MAY 2001 Construction Dewatering Operations Part III: Dewatering Under a RWQCB Permit
APRIL 2001 Construction Dewatering Operations Part II: Sediment Treatment
MARCH 2001 Construction Dewatering Operations Part I: Management Options and NPDES Permit Requirements
FEBRUARY 2001 Non-Compliance Reporting for Construction Activities
JANUARY 2001 Help from the Construction Stormwater Coordinator
2000
DECEMBER 2000 Calculating Stormwater Run-on at Construction Sites
NOVEMBER 2000 Reducing Slope Length for Erosion Control
OCTOBER 2000 Preparing for the Rainy Season – Part 2
SEPTEMBER 2000 Preparing for the Rainy Season – Part 1
AUGUST 2000 Sediment Tracking Controls
JULY 2000 Solid Waste Management on Construction Sites
JUNE 2000 Structure Construction and Water Pollution Control
MAY 2000 Water Pollution Control Compliance After Contract Termination
APRIL 2000 Cost Saving Tips – Part III: Non-Stormwater Management and Sediment Tracking Controls
MARCH 2000 Cost Saving Tips – Part II: Sediment Controls
FEBRUARY 2000 Cost Saving Tips – Part I: Soil Stabilization Practices
JANUARY 2000 Stormwater Compliance Inspection for Your Project
1 9 9 9
DECEMBER 1999 BMP Maintenance
NOVEMBER 1999 Rainy Season Reminders
OCTOBER 1999 Solid Waste and Hazardous Waste Management
SEPTEMBER 1999 Lessons Learned
AUGUST 1999 Soil Stabilization using Erosion Control Blankets
JULY 1999 Stormwater Protection for Encroachment Permit Projects
JUNE 1999 Scheduling Construction Activity to Minimize Stormwater pollution
MAY 1999 Winter is Over, Don't Forget the Non-Stormwater Requirements
APRIL 1999 Reducing Stormwater Erosion with Diversion Ditches and Berms
MARCH 1999 Stormwater Protection during Concrete Sawing, Grinding, Core Drilling and Grooving
FEBRUARY 1999 Stabilizing Soils on Construction Projects Using Vegetative Buffer Strips
JANUARY 1999 Using BONDED FIBER MATRIX for Mulching and Soil Stabilization
1 9 9 8
DECEMBER 1, 1998 Federal, State and Local Permits
NOVEMBER 15, 1998 Construction Projects Located over Bodies of Water
NOVEMBER 1, 1998 Protection of Stockpile Materials
OCTOBER 15, 1998 Sandblasting Operations and Stormwater pollution Control
OCTOBER 1, 1998 Water Pollution Control Requirements and Completed Construction Sites
SEPTEMBER 15, 1998 Contractors and Caltrans Inspection Requirements
SEPTEMBER 1, 1998 Winter Season 1998... Compliance Requirements
AUGUST 1, 1998 SWPPP Preparation
JULY 1, 1998 Pollution Discharges... Asphalt Concrete Paving Operations
JUNE 1, 1998 Compliance Assistance Program
MAY 1, 1998 Dust Control of Construction Vehicle Traffic Areas using Liquid Soil Stabilizers CD26A
APRIL 15, 1998 Continuing Construction Concerns: Concrete Waste Washout and Silt Fence Installation
APRIL 1, 1998 Entrance/Outlet Tire Wash (CD29C)
MARCH 1, 1998 Fiber Rolls CD43
MARCH 15, 1998 Traffic Safe Storm Drain Inlet Protection (CD40)
FEBRUARY 15, 1998 Continuing Construction Concerns: Asphalt Concrete Stockpiles, and Cold Mix Use
FEBRUARY 1, 1998 How Construction Sites Affect Water Quality
JANUARY 15, 1998 Preparing for a Major Storm Event
JANUARY 1, 1998 Construction Non-Stormwater pollution Prevention Construction Site Fueling Operations
1 9 9 7
DECEMBER 15, 1997 Construction Scheduling CD22 and the use of Existing Vegetation for Job Site Erosion Control CD23
DECEMBER 1, 1997 Construction Contractual Requirements for New Products
and Methods for Erosion and Sediment Control
NOVEMBER 15, 1997 Essentials of Sediment Traps and Basins
NOVEMBER 1, 1997 Understanding Sediment Control using Linear Barriers
OCTOBER 15, 1997 Stormwater Discharges... Sediment Control
OCTOBER 1, 1997 Stormwater Discharges... Management Activities
SEPTEMBER 15, 1997 Stormwater Discharges... Protection of Soil Disturbed Areas
SEPTEMBER 1, 1997 Stormwater Discharges...
Construction Projects Winter Season Preparedness Activities
AUGUST 15, 1997 Non-Stormwater Discharges, Construction Dewatering Activities
AUGUST 1, 1997 Stormwater Discharges... Construction Site Soil Stabilization
& Sediment Controls
JULY 15, 1997 Non-Stormwater Discharges... Lead Paint Abatement
using Plastic Shrink Wrap Protection During Construction
JULY 2, 1997 Non-Stormwater Discharges... Vehicle Equipment Fueling CD19
JUNE 18, 1997 Non-Stormwater Discharges... Concrete Waste Management
JUNE 1, 1997 Non-Stormwater Discharges, More Construction Site Issues
MAY 15, 1997 Non-Stormwater Discharges, Construction Site Operations
APRIL 1997 Non-Stormwater Discharges, Inspection of Contractor Yards
APRIL 1997 Stormwater Compliance Review Task Force ... The Next Step

Important Note: To download an Acrobat file to your computer, right-click an issue above and select the menu choice that starts with "Save".

Contacts:
Additional information is available on the Caltrans Construction website.

FOR MORE INFORMATION CONTACT

Division of Environmental Analysis, Stormwater Unit
California Department of Transportation
P.O. Box 942874, MS-27
Sacramento, CA 94274-0001
Email: Division of Environmental Analysis, Stormwater Unit

ADDITIONAL CALTRANS NPDES CONTACTS