State of California Department of Transportation
Page 1
 Statement of Ongoing Contracts as of  08/20/07
09/07/07
District 08
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
08-RIV-10-37.1/0 VERLENGIA, ROMANO  $307,292 06/26/07
08-0E5604 IN RIVERSIDE COUNTY IN PALM SPRINGS AT WILLOW WASH BRIDGE
D G YEAGER CONSTRUCTION CO. ATTN: DALE YEAGER
2781 W. RAMSEY ST., STE #7
 $101,051 07/18/07  26%
   RETROFIT BRIDGE P.O. BOX 74073  $101,051 10/15/07  33%
   BANNING, CA 92220  
   SAN CLEMENTE, CA  92673 (951)538-9810  
HM3 SWPPP  
08-RIV-10-71.8/72.3 ZONDIROS CORPORATION DAVIS, DARCY  $656,001 06/01/07
08-0C3904 IN RIVERSIDE COUNTY NEAR INDIO AT CACTUS CITY SAFETY ROADSIDE REST AREA WESTBOUND
2401 208TH STREET SUITE C8 2781 W. RAMSEY STE 7  $56,290 07/06/07  18%
   BANNING, CA 92220-3700 12/04/07  9%
   UPGRADE EXISTING FACILITIES (909)844-9731  $56,290  
TORRANCE CA 90501
   (310)320-2558  
HB71 WPCP
08-RIV-10-134.0/144.1 GRANITE CONSTRUCTION CO. OOI, KEE  $1,910,640 03/29/07
08-0G7204 IN RIVERSIDE COUNTY NEAR BLYTHE  FROM 1.6 KM WEST OF WILEY WELL ROAD TO 8.1 KM WEST OF ROUTE 78
3800 MONROE STREET 790 S VIA LATA, SUITE 100
 $1,352,507 04/19/07  77%
 71%
    $1,106,347 09/05/07
   RESURFACE ASPHALT CONCRETE INDIO, CA 92203 COLTON, CA 92324  
     (951)840-8323  
HA22 SWPPP
08-RIV-15-3.2/8.1 YANG, CHAD  $1,933,910 01/12/07
08-0G6504 IN RIVERSIDE COUNTY NEAR TEMECULA FROM THE SOUTH JUNCTION OF ROUTE 79 TO JUNCTION ROUTE 215
R J NOBLE COMPANY TONY GATOFF, PROJECT MANAGER
 $1,575,428 02/05/07  100%
P.O. BOX 620 9225 STELLAR COURT STE B
 100%
    $0 08/30/07
   OVERLAY ASPHALT CONCRETE CORONA, CA 92883 08/30/07
   ORANGE, CA  92856 (951)232-7638  
HA22 WPCP  
KAWWA, JABRA
08-RIV-60-.5/7.5 IN RIVERSIDE COUNTY AT GLEN AVON FROM ROUTE 15 AND 60 SEPARATION TO VALLEY WAY UNDERCROSSING
YEAGER SKANSKA INC.  MR. JON P. HADLEY
 $54,290,636 03/08/06  83%
08-354804 1995 AGUA MANSA ROAD 2023 CHICAGO AVENUE, SUITE B6
 $46,289,650 03/17/06  85%
ACNH-P060-(123)E  $2,412,176 11/26/07
LN62-08 0-(8) WIDEN HIGHWAY RIVERSIDE, CA 92507  
--() RIVERSIDE, CA 92509 (951)276-1938  
 
HB5 SWPPP
DC HUBBS CONSTRUCTION AL-SAADOON, ALI
08-RIV-60-28.3/30.3 IN RIVERSIDE COUNTY NEAR BEAUMONT AT VARIOUS LOCATIONS
 $95,555 06/25/07  60%
08-477824 37306 VISTA VIEW DR. 2023 CHICAGO AVE., SUITE B-6
 $32,336 07/16/07  34%
   UPGRADE GUARD RAILS  $32,336 09/04/07
   YUCAIPA, CA  92399 RIVERSIDE, CA 92507  
     (951)276-1945  
HB1 WPCP

State of California Department of Transportation
Page 2
 Statement of Ongoing Contracts as of  08/20/07
09/07/07
District 08
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
08-RIV-60-28.8/29.8 MODERN ALLOYS INC FATHI, ALI  $1,730,870 05/15/07
08-0G4604 IN RIVERSIDE COUNTY IN BEAUMONT  FROM 2.5 KM TO 0.9 KM WEST OF ROUTE 10 AND 60 SEPARATION
11172 WESTERN AVENUE 2023 CHICAGO AVE. STE B-6
 $386,513 06/04/07  48%
ACST-P060-(133)E  $95,683 10/11/07  22%
G P0-60 1-(3E) INSTALL CONCRETE MEDIAN BARRIER SANTON CA 90680 RIVERSIDE, CA 92507  
--() (714)893-0551 (951)232-7259  
HB1 SWPPP
08-RIV-71-/2.7 SEMA CONSTRUCTION YOGARAJAH, MANNY M.  $9,500,960 12/29/03
08-446514 IN RIVERSIDE COUNTY NEAR CORONA AND CHINO HILLS FROM SAN BERNARDINO AND RIVERSIDE COUNTY LINE TO SANTA ANA RIVER BRIDGE
2 SOUTH POINTE DR. STE 295 790 S. VIA LATA STE 100
 $9,955,793 01/14/04  0%
HP21-6208-(007)L  $2,265 04/29/08  0%
 620-8 00-() LAKE FOREST, CA  92630 COLTON, CA 92334  
--() WIDEN DIVIDED HIGHWAY   (951)830-6864
SWPPP PLANT EST SATIS
HE13
08-RIV-74-40.6/42.6 ALL AMERICAN ASPHALT AL-SAADOON, ALI  $936,143 05/30/07
08-0H6704 IN RIVERSIDE COUNTY IN HEMET FROM STATE STREET TO DARTMOUTH AVENUE
400 E. SIXTH ST. 2023 CHICAGO AVE., SUITE B-6
 $859,237 07/03/07  53%
   RESURFACE ASPHALT CONCRETE  $859,237 09/20/07  90%
   CORONA, CA  92878 RIVERSIDE, CA 92507  
     (951)276-1945  
HM1 WPCP
08-RIV-74-87.6/87.7 VERLENGIA, ROMANO  $697,870 05/22/07
08-0C4104 IN RIVERSIDE COUNTY NEAR PALM DESERT AT 3.9 KM SOUTH OF BIG HORN DRIVE AT COACHELLA VALLEY VISTA POINT
RSB GROUP INC. ATTN: SIMON SEPEHRI
 $187,905 06/11/07  12%
8 MCLAREN STE #8 2781 W. RAMSEY ST. STE #7
 27%
    $187,905 11/06/07
   UPGRADE VISTA POINT BANNING, CA 92220  
   IRVINE, CA  92618 (951)538-9810  
HB71 WPCP  
BERT W SALIS INC. MANASRAH, FATHI
08-RIV-79-7.0/7.1 IN RIVERSIDE COUNTY NEAR AGUANGA AT TEMECULA CREEK BRIDGE
10769 WOODSIDE AVENUE, #205  $643,545 10/03/06  0%
08-450204 9225 STELLAR COURT, SUITE B
 $622,127 10/13/06  0%
   ROCK SLOPE PROTECTION  $18,360 12/23/08
   SANTEE, CA 92071 CORONA, CA 92883  
     (951)277-8582
PLANT EST SATIS
HA21 SWPPP
PAVEMENT RECYCLING SYSTEMS INC MOHAMMADI, ESSI
08-RIV-86-15.5/23.2 IN RIVERSIDE COUNTY IN COACHELLA FROM 58TH AVENUE TO ROUTE 10
 $73,623 06/04/07  100%
08-1A5404 P.O. BOX 1266 2781 W. RAMSEY ST.  $72,577 07/03/07  100%
   GRIND IN RUMBLE STRIPS BANNING, CA 92220 07/30/07
   RIVERSIDE, CA  92502 (951)453-8943  $0 07/30/07
     COMPLETED
HB1 WPCP

State of California Department of Transportation
Page 3
 Statement of Ongoing Contracts as of  08/20/07
09/07/07
District 08
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
08-RIV-91-.6/1.2 SEMA CONSTRUCTION, INC. MANASRAH, FATHI  $13,481,677 02/08/07
08-456614 IN RIVERSIDE COUNTY NEAR CORONA  FROM 1.0 KM EAST OF ORANGE AND RIVERSIDE COUNTY LINE TO 1.4 KM  WEST OF ROUTE 91 AND 71 SEPARATIO
6 ORCHARD SUITE 150 9225 STELLAR COURT #5  $4,275,437 02/27/07  21%
HP21-6054-(049)L CORONA, CA 92883 03/20/09  32%
 605-4 04-() LAKE FOREST, CA  92630 (951)277-8582  $1,064,229
--() REPLACE EXISTING BRIDGE    
 
HE11 SWPPP
08-RIV-91-2.9/3.6 HIGHLAND CONSTRUCTION INC    $1,356,316 06/27/07
08-0H7704 IN RIVERSIDE COUNTY IN CORONA FROM PRADO OVERHEAD TO SERFAS CLUB DRIVE UNDERCROSSING
133 N PIXLEY STREET    $0 07/23/07  0%
        0%
   RECONSTRUCT MEDIAN BARRIER    $0  
ORANGE CA 92868
   (714)538-5156  
HB4N WPCP
08-RIV-91-5.3/6.6 SPRAY, MICHAEL  $1,976,917 11/03/06
08-474104 IN RIVERSIDE COUNTY IN CORONA FROM 0.2 KM WEST OF LINCOLN AVENUE OVERCROSSING TO EAST GRAND BOULEVARD UNDERCROSSING
P AND D LANDSCAPE MANAGEMENT SERVICES
1110-A RESEARCH DR.  $1,589,972 12/05/06  68%
999 TOWN AND COUNTRY RD 4TH F REDLANDS, CA 92374-4562  80%
   12/21/10
   (951)232-6497  $144,091  
   PLANTING AND IRRIGATION ORANGE CA 92868
SWPPP (714)835-4447  
HA25
08-RIV-215-8.4/23 ALL AMERICAN ASPHALT ABUGHARBIEH, IMAD  $2,857,657 04/19/07
08-0G6604 IN RIVERSIDE COUNTY FROM ROUTE 15 AND 215 SEPARATION TO 0.4 KM  NORTH OF ETHANC ROAD OVERCROSSING
P.O. BOX 2229  $2,550,631 05/07/07  100%
9225 STELLAR COURT, SUITE B
 100%
    $0 08/16/07
   COLD PLANE ASPHALT CONCRETE CORONA, CA 92878 CORONA, CA 92883 08/21/07
     (951)232-3610  
HA22 SWPPP
WASHINGTON/OBAYASHI LOPEZ, JOE
08-RIV-215-37.7/43.9 IN RIVERSIDE COUNTY IN RIVERSIDE AND MORENO VALLEY AT VARIOUS  LOCATIONS
P.O. BOX 600 3474 NIKI WAY  $245,070,885 02/06/04  74%
08-334844  $199,183,220 02/24/04  81%
ACNH-215 -(219)9 WIDEN EXISTING FREEWAY RIVERSIDE, CA 92557 04/09/08
I-215 -(219)9 HIGHLAND, CA  92346 (909)275-0751  $6,272,582  
ACNH-X065-(080)N    
HB5 HB4C HE11
SWPPP
VERLENGIA, ROMANO  $318,121 02/09/07
08-0C4004 IN RIVERSIDE COUNTY ABOUT 23.2 KM SOUTH OF BANNING AT INDIAN VISTA POINT
RSB GROUP INC. ATTN: SIMON SEPEHRI
2781 W. RAMSEY STREET, STE #7
 $317,669 03/07/07  100%
8 MCLAREN, SUITE #8  100%
    $0 07/03/07
   UPGRADE INDIAN VISTA POINT BANNING, CA 92220  
   IRVINE, CA   92318 (951)538-9810  
HB71 WPCP  

State of California Department of Transportation
Page 4
 Statement of Ongoing Contracts as of  08/20/07
09/07/07
District 08
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
08-RIV-371-56.4/77.1 R J NOBLE COMPANY FATHI, ALI  $1,842,442 06/07/07
08-0H6904 IN RIVERSIDE COUNTY NEAR CITY OF AGUANGA FROM 0.2 KM EAST OF 79 AND 371 JUNCTION TO 1.2 KM EAST OF WILSON VALLEY ROAD
P O BOX 620 2023 CHICAGO AVE. STE B-6
 $146,467 06/28/07  0%
    $146,467 10/30/07  8%
   ORANGE CA 92856 RIVERSIDE, CA 92507
   RESURFACE ASPHALT CONCRETE (951)232-7259    
(714)637-1550
HM1 SWPPP
08-SBD-10-24.0/33.6 TERNO, INC. OOI, KEE  $8,892,606 06/28/07
08-384204 IN SAN BERNARDINO COUNTY IN COLTON, SAN BERNARDINO, LOMA LINDA AND REDLANDS AT VARIOUS LOCATIONS
15701 HERENO AVENUE 790 VIA LATA, SUITE 100
 $8,738 07/16/07  0%
ACIM-X071-(052)E  $8,738 09/04/08  0%
LN62-08 0-(2) WIDEN AND STRIPE RAMPS COLTON, CA 92324  
LA MIRADA, CA  90638
--()   (951)840-8323  
HB4N SWPPP
08-SBD-10-37.2/38.9 DANNY C HUBBS CONSTRUCTION INC EMUH, GODWIN  $770,190 06/15/07
08-0C2904 IN SAN BERNARDINO AND RIVERSIDE COUNTIES AT VARIOUS LOCATIONS
37306 VISTER VIEW DRIVE 2351 LUGONIA AVENUE, SUITE F
 $239,530 07/03/07  37%
   RECONSTRUCT FENCING  $239,530 10/19/07  31%
   YUCAIPA, CA 92339 REDLANDS, CA 92374  
     (951)232-3706  
HA22 SWPPP
08-SBD-15-23.0/29.5 PACIFIC COAST MARKINGS GADALLA, AMGAD  $128,023 05/16/07
08-0H7404 IN SAN BERNARDINO COUNTY FROM 0.2 MILE NORTH OF NORTH ALRAY OVERHEAD TO 0.9 MILE NORTH OF OAKHILL ROAD OVERCROSSING
3104 SACRAMENTO ROAD 15367 TAMARACK RD  $110,581 06/06/07  72%
 86%
   VICTORVILLE, CA 92392 09/17/07
   PHELAN CA 92371 (951)453-8929  $109,784  
   REPLACE PAVEMENT MARKERS (760)316-9690
WPCP  
HM4
SARKIN, SUE
08-SBD-15-41.7/42.4 IN SAN BERNARDINO COUNTY IN VICTORVILLE FROM 1.0 KM SOUTH TO 1.0 KM NORTH OF MAJAVE DRIVE
SKANSKA USA CIVIL WEST CALIFORNIA DISTRICT INC
 $5,361,083 03/16/07  28%
08-333904 1995 AGUA MANSA ROAD VICTORVILLE, CA 92392  $1,247,260 04/06/07  23%
DPIL-0061-(025) 07/03/09
--() WIDEN BRIDGE, RAMPS AND SIGNAL (951)232-7826  $324,621  
   RIVERSIDE CA 925092405  
(951)684-5360
HE11 HB4N
SWPPP
08-SBD-15-87.7/186 GRANITE CONSTRUCTION COMPANY SANTOS, JOHN  $26,439,374 10/19/06
08-0C0404 IN SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS
P O BOX 50085 222 E. MAIN ST., STE 208
 $17,197,664 11/09/06  29%
ACIM-015 -(149)E MEDIAN GRADING, DRAINAGE, RAILING  $2,237,387 01/09/09  64%
--() WATSONVILLE CA 95077 BARSTOW, CA 92311-2366  
   (831)724-1011 (951)538-5315  
HB1 SWPPP

State of California Department of Transportation
Page 5
 Statement of Ongoing Contracts as of  08/20/07
09/07/07
District 08
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
08-SBD-15-115.3/119 GRANITE CONSTRUCTION CO. TORRES, JOSE  $7,032,799 08/22/06
08-476104 IN SAN BERNARDINO COUNTY NEAR BAKER FROM 5.9 KM NORTH OF AFTON ROAD OVERCROSSING TO 2.3 KM SOUTH OF BASIN ROAD OVERCROSSING
P. O. BOX 50085 222 E MAIN STREET  $6,968,447 09/07/06  85%
   BARSTOW, CA 92311 09/28/07  93%
   WATSONVILLE, CA 95077-5085 (760)256-5239  $1,114,605
   WIDEN ROADWAY AND BRIDGE    
 
HB4C SWPPP
08-SBD-18-20.5/31 ORTIZ ASPHALT PAVING INC. EMUH, GODWIN  $1,249,211 03/23/07
08-0H6204 IN SAN BERNARDINO COUNTY NEAR RIMFOREST, SKYFOREST AND RUNNING SPRINGS AT VARIOUS LOCATIONS
264 S LELAND NORTON WY #A170 2351 LUGONIA AVENUE, SUITE F
 $1,333,494 04/06/07