ASPHALT CONCRETE
39-1 GENERAL
The Contractor shall be responsible for controlling the quality of the asphalt concrete product entering the work, including mix design, mixing, spreading, and compacting asphalt concrete and of the work performed, and for developing, implementing and maintaining a quality control program. The Contractor shall also be responsible for the inspection, sampling and testing required to control the quality of the asphalt concrete and the work performed, and for the inspection, sampling and testing required to provide the Engineer with the information and test data necessary for acceptance of the asphalt concrete, complete in place.
The inspection, sampling and testing required by the Contractor to control the quality of the workmanship and the asphalt concrete product shall conform to the requirements specified herein, and the Department's "Manual for Quality Control and Quality Assurance for Asphalt Concrete," dated April 1996.
Asphalt concrete is designated as Type A or Type B. The type of asphalt concrete will be shown on the plans or specified in "Asphalt Concrete" in Section 10-1, "General," elsewhere in these special provisions.
Asphalt concrete shall be produced in a batch mixing plant, a continuous pugmill mixing plant, or a drier-drum mixing plant. Proportioning shall be either by hot-feed control or cold-feed control.
The Contractor shall furnish test data in support of each proposed mix design. The test data furnished shall be for an asphalt concrete mixture that conforms to the proposed target values. In addition, the Contractor shall also furnish samples of the aggregate, asphalt binder and all additives proposed for use in each asphalt concrete mixture. The Contractor shall submit the following for each asphalt concrete mixture proposed for use under the contract:
A. Aggregate and mineral filler:
1. Target values for percent passing each sieve size for the aggregate blend. The proposed target values, for the specified type and aggregate size, shall conform to the aggregate gradation limits specified in Section 39-2.03, "Aggregate," of this specification;
2. Results of tests for aggregate quality requirements specified in Section 39-2.03, "Aggregate," of this specification;
3. Source of each aggregateto be used;
4. Percentage of each aggregate stockpile or hot bin to be used;
5. Gradation of each aggregate stockpile or hot bin to be used; and
6. Samples from each aggregate stockpile or hot bin to be used. These samples shall be representative of the material to be used and shall have been processed in a manner representative of that for the material to be used in the work.
a. 125 pounds of each coarse aggregate;
b. 75 pounds of each intermediate and fine aggregate; and
c. 10 pounds of each mineral filler.
B. Asphalt binder:
1. Target value for asphalt binder content for each proposed asphalt concrete mixture;
2. Four individual one-quart samples of the asphalt binder to be used in each proposed asphalt concrete mixture;
3. Results of the asphalt binder quality tests as specified in Section 92, "Asphalts," of the Standard Specifications; and
4. Material safety data sheets.
C. Antistrip additives, when applicable:
1. A 10-pound sample of dry additive or a one-quart sample of liquid antistrip additive, including name of product, manufacturer, manufacturer's numerical designation (if any) and proposed rate, location and method of addition; and
2. Material safety data sheets.
The Engineer will test the Contractor's proposed asphalt concrete mix design for verification using the proposed aggregate gradation and asphalt binder content target values, and the quality and asphalt concrete mixture requirements specified in Section 39-2.03, "Aggregate," of this specification. Asphalt concrete production for this project shall not begin until the Contractor has received written notification that the proposed mix design to be used has been verified by the Engineer.
Changes from one mix design to another shall not be made during the progress of the work, unless permitted in writing by the Engineer. The Contractor shall submit to the Engineer a proposed mix design for each new asphalt concrete mixture to be used at least two weeks prior to production of that mixture. Asphalt concrete mix designs not verified by the Engineer shall not be used. Changes in stockpile or hot bin proportions to conform to aggregate grading requirements will not be considered changes in the mix design. Changes in asphalt binder content or aggregate grading target values will not be applied retroactively for acceptance or payment.
The Engineer will determine all asphalt concrete mix design evaluation costs incurred as a result of Contractor requested verification of additional asphalt concrete mix design proposals. The mix design evaluation costs, as determined by the Engineer, will be deducted from any moneys due or to become due the Contractor.
39-2.02 Asphalts.--Asphalt binder to be mixed with aggregate shall be a steam-refined paving asphalt conforming to the provisions in Section 92, "Asphalts," of the Standard Specifications, and shall be of the grade designated in "Asphalt Concrete," in Section 10-1, "General," elsewhere in these special provisions, or as determined by the Engineer. The amount of asphalt binder to be mixed with the aggregate will be determined by the Contractor and verified by the Engineer, as specified in Section 39-2.01, "Mix Design," of this specification. In support of the material certification requirements specified in Section 92, "Asphalts," of the Standard Specifications, the Contractor shall obtain 2 individual one-quart samples of the asphalt binder for each day of asphalt concrete production. The sample containers shall be labeled with the date and time of sampling and shall be submitted to the Engineer on a weekly basis.
Liquid asphalt for prime coat shall conform to the provisions in Section 93, "Liquid Asphalts," of the Standard Specifications, and shall be the grade designated by the contract item or specified in "Asphalt Concrete," in Section 10-1, "General," elsewhere in these special provisions.
Asphalt emulsion for paint binder (tack coat) shall conform to the provisions in Section 94, "Asphaltic Emulsions," of the Standard Specifications, for the rapid-setting or slow-setting type and grade approved by the Engineer.
Paving asphalt to be used as a binder for pavement reinforcing fabric shall be a steam-refined paving asphalt conforming to the provisions in Section 92, "Asphalts," of the Standard Specifications, and shall be Grade AR-4000, unless otherwise ordered by the Engineer.
39-2.03 Aggregate.--All aggregates shall be clean and free from decomposed or organic materials and other deleterious substances. Coarse aggregate is material retained on the No. 4 sieve, fine aggregate is material passing the No. 4 sieve, and supplemental fine aggregate is added fine material passing the No. 30 sieve, including, but not limited to, cement and stored fines from dust collectors.
The combined aggregate shall conform to the requirements of this section.
The target value for the percent passing each designated sieve size for the aggregate blend used in the proposed asphalt concrete mixture shall fall within the "Target Value Limits" of the following table:
AGGREGATE GRADATION Type A and Type B Asphalt Concrete Percentage Passing
3/4" Maximum, Coarse
|
||
Sieve Sizes
|
Target
Value
Limits
| |
| 1"
|
100
| |
| 3/4"
|
90-100
| |
| 3/8"
|
60-75
| |
| No.
4
|
45-50
| |
| No.
8
|
32-36
| |
| No.
30
|
15-18
| |
| No.
200
|
3-7
|
3/4" Maximum, Medium
|
||
Sieve Sizes
|
Target
Value
Limits
| |
| 1"
|
100
| |
| 3/4"
|
90-100
| |
| 3/8"
|
65-80
| |
| No.
4
|
49-54
| |
| No.
8
|
36-40
| |
| No.
30
|
18-21
| |
| No.
200
|
3-8
|
1/2" Maximum, Coarse
|
||
Sieve Sizes
|
Target
Value
Limits
| |
| 3/4"
|
100
| |
| 1/2"
|
95-100
| |
| 3/8"
|
75-90
| |
| No.
4
|
55-61
| |
| No.
8
|
40-45
| |
| No.
30
|
20-25
| |
| No.
200
|
3-7
|
1/2" Maximum, Medium
|
||
Sieve Sizes
|
Target
Value
Limits
| |
| 3/4"
|
100
| |
| 1/2"
|
95-100
| |
| 3/8"
|
80-95
| |
| No.
4
|
59-66
| |
| No.
8
|
43-49
| |
| No.
30
|
22-27
| |
| No.
200
|
3-8
|
During asphalt concrete production, aggregate gradation shall be within the limits specified in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification. Conformance with these grading requirements will be determined by California Test 202, modified by California Test 105 when there is a difference in specific gravity of 0.2 or more between the coarse and fine portions of the aggregate or between the blends of the different aggregates.
The combined aggregate shall conform to the following quality requirements prior to the addition of the asphalt binder:
Aggregate Quality Requirements
|
||||
| Quality
|
California
Test
|
Asphalt
Concrete
Type
|
||
| A
|
B
| |||
| Percent
of Crushed Particles
Coarse Aggregate (Min.) Fine Aggregate (Passing No. 4,
Retained on No. 8) (Min.)
|
205
|
90%
70%
|
25%
20%
| |
| Los
Angeles Rattler Loss at 100 Rev. (Max.)
Loss at 500 Rev. (Max.) t
|
211
|
12%
45%
|
50%
| |
| Sand
Equivalent (Min.)
|
217
|
47
|
42
| |
| KcFactor
(Max.)
|
303
|
1.7
|
1.7
| |
| KfFactor
(Max.)
|
303
|
1.7
|
1.7
|
The asphalt concrete mixture, composed of the proposed aggregate blend and the proposed asphalt binder content as determined by California Test 367, shall conform to the following requirements:
Asphalt Concrete Mixture Requirements
| ||
| Design
Parameters
|
Asphalt
Concrete
Type
| |
| A
|
B
| |
| Hveem
Stabilometer Value (Min.)
California Test 366
|
37
|
35
|
| Percent
air voids
California Test 367
|
3-5
|
3-5
|
| Swell
Max. (in.)
California Test 305
|
.030
|
.030
|
39-2.04 Pavement Reinforcing Fabric.--Pavement reinforcing fabric shall conform to the provisions in Section 88, "Engineering Fabrics," of the Standard Specifications.
At least 14 days prior to the start of production of asphalt concrete, the Contractor shall submit to the Engineer for approval a written Quality Control Plan which shall be used to ensure the quality of the product and the work. The production of asphalt concrete shall not begin until the Quality Control Plan is approved by the Engineer.
39-3.02 Quality Control Plan.--The Contractor shall provide a Quality Control Plan which shall describe the organization and procedures which the Contractor shall use to administer the quality control system including the procedures used to control the production process, to determine when changes to the production process are needed, and the procedures proposed to be used to implement the required changes. The Quality Control Plan shall meet the minimum standards set forth in the Department's "Manual for Quality Control and Quality Assurance for Asphalt Concrete," dated April 1996.Approval of the Quality Control Plan will be based on the inclusion of all of the required information.
Approval of the Quality Control Plan does not imply any warranty by the Engineer that adherence to the plan will result in production of asphalt concrete that complies with these specifications. It shall remain the responsibility of the Contractor to demonstrate such compliance. The Contractor may propose in writing a supplement to the Quality Control Plan as work progresses and must propose a supplement whenever there are changes in production or placement of asphalt concrete or to quality control procedures or personnel. Asphalt concrete production and placement shall not resume or continue until the revisions to the Quality Control Plan or quality control personnel have been approved in writing by the Engineer.
The Quality Control Plan shall include the name and qualifications of a Quality Control Manager. The Quality Control Manager shall be responsible for the administration of the Quality Control Plan, including compliance with the plan and any plan modifications. The Quality Control Manager shall be directly responsible to the Contractor and shall have the authority to make decisions where quality of the work or product are concerned. All sampling, inspection and test reports shall be reviewed and signed by the Quality Control Manager prior to submittal to the Engineer.
The Quality Control Plan shall include the name and qualifications of an independent testing laboratory mutually agreed to by the Contractor and the Engineer to serve as the Third Party Laboratory in any dispute resolution. Attention is directed to Section 39-4.05, "Dispute Resolution," of this specification.
39-3.03 Quality Control Inspection, Sampling and Testing.--The Contractor shall perform quality control sampling and testing, provide inspection, and exercise management control to ensure that asphalt concrete production and placement conforms to the requirements specified herein.
The Contractor shall provide the required sampling, testing and inspection during all phases of the asphalt concrete work. Sampling, testing and inspection shall be performed at a rate sufficient to ensure that the asphalt concrete product conforms to the requirements specified herein. Sampling, testing, and inspection to be used by the Engineer for acceptance and determination of payment shall be performed at the minimum frequency specified in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification, and as outlined in the approved Quality Control Plan. The Contractor shall provide quality control inspection on the project at all times asphalt concrete paving operations are in progress.
Sampling locations for quality control tests, as specified herein, shall be determined by the Contractor using a random sampling plan approved by the Engineer. The Contractor shall establish a statistically based procedure of random sampling.
The Contractor shall obtain and split into representative portions samples in conformance with California Test 125. One representative split portion of each sample shall be reserved for possible retest during dispute resolution, according to the requirements designated in Section 39-4.05, "Dispute Resolution," of this specification.
The Contractor shall provide a testing laboratory with adequate equipment and personnel for the performance of the quality control tests. Laboratory facilities shall be clean and all sampling and testing equipment shall be maintained in proper working condition. The Engineer shall be given unrestricted access to the laboratory for inspection and to witness the Contractor's quality control activities during working hours.
Testing laboratories and inspection, sampling and testing personnel shall conform to the minimum requirements as set forth in the Department's "Manual for Quality Control and Quality Assurance for Asphalt Concrete," dated April 1996.
39-3.04 Control Charts and Records.--The Contractor shall record all sampling, testing and inspection data on forms approved by the Engineer. The Contractor shall maintain complete testing and inspection records and post all test data in the laboratory.Upon written request by the Contractor, the Engineer will provide the test data of testing done by the State.
39-3.04A Control Charts.--The Contractor shall develop and maintain linear control charts. The control charts shall identify the project, test number, test parameter, applicable upper and lower specification limits, and test data. The control charts shall be used as part of the quality control system to document variability of the asphalt concrete production process, identify construction and equipment problems, and identify potential pay factor adjustments.
When test data for any quality characteristic deviates beyond the specification limits specified in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification, the Contractor shall take the necessary corrective action to bring the production within the specification limits, and shall document the corrective action taken in the records of inspection and testing as designated in Section 39-3.04B, "Records of Inspection and Testing," of this specification. When 3 consecutive sets of test data for any quality characteristic deviate beyond the specification limits designated in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification, the Contractor shall cease production of asphalt concrete, and shall propose corrective measures to the Engineer. Production of asphalt concrete may continue when the corrective measures have been approved by the Engineer and implemented by the Contractor.
Control charts shall be kept current and shall be posted in a location accessible to the Engineer. Control charts shall be updated each day of asphalt concrete production, and up-to-date copies shall be posted prior to the beginning of the next day's production of asphalt concrete.
39-3.04B Records of Inspection and Testing.--For each day of asphalt concrete production, the Contractor shall prepare an "Asphalt Concrete Construction Daily Record of Inspection", on a form approved by the Engineer. The inspection record shall include the following certification signed by the Quality Control Manager:
"It is hereby certified that the information contained in this record is accurate, and that all work documented herein complies with the requirements of the contract. Any exceptions to this certification are documented as a part of this record."
For each day of asphalt concrete production,, the Contractor shall prepare an "Asphalt Concrete Testing Record" on a form approved by the Engineer. The testing record shall include the following certification signed by the Quality Control Manager:
"It is hereby certified that the information contained in this record is accurate, and that all tests and calculations documented herein comply with the requirements of the contract and the standards set forth in the testing procedures. Any exceptions to this certification are documented as a part of this record."
The Contractor shall submit sampling, testing and inspection records and certifications to the Engineer within 24 hours or by noon of the next day's asphalt concrete production, whichever period is agreed to by the Engineer at the beginning of the asphalt concrete production. If the record is incomplete or in error, a copy of the record will be returned to the Contractor with the deficiencies noted by the Engineer. The Contractor shall correct the deficiencies and return the updated record to the Engineer by the start of the following working day. When errors or omissions in the sampling, inspection or testing records repeatedly occur, the Contractor shall correct the procedures by which the records are produced.
If control charts, sampling, testing and inspection records and certifications are not posted or provided as required within the time specified herein, the Engineer may require work to be suspended until the missing control charts, sampling, testing and inspection records, and certifications have been provided.
In addition to the minimum sampling and testing requirements specified in this specification, the Contractor shall, when directed by the Engineer, obtain representative samples of any asphalt concrete mixture or material component that appears defective or inconsistent. These samples will be obtained and split into representative portions in accordance with California Test 125. The Contractor shall provide the Engineer with one representative split portion of each sample taken and shall reserve one representative split portion of each sample for possible retest during dispute resolution, according to the requirements designated in Section 39-4.05, "Dispute Resolution," of this specification. The material need not be sampled if the Contractor elects to remove and replace the material, at the Contractor's expense, or if the Contractor uses a method of correcting the situation which has been approved by the Engineer. Test data from these additional material samples shall not be used as a basis for a calculated pay factor.
39-4.02 Engineer Sampling for Verification.--The Engineer will obtain random samples of aggregate, asphalt binder and asphalt concrete mixture, and test for in-place density independent of the Contractor's quality control testing. These samples may be obtained at any time during asphalt concrete production and placement operations, and will be obtained and split into representative portions in accordance with California Test 125. One of the representative split portions will be provided to the Contractor, one of the representative split portions will be tested by the Engineer and used to verify quality control test data furnished by the Contractor that has not yet been verified, and two representative split portions will be reserved by the Engineer for third party testing in accordance with the requirements of Section 39-4.05, "Dispute Resolution," of this specification.
The Engineer will permit the Contractor to witness all verification sampling. However, the Engineer will not be required to notify the Contractor of anticipated sampling schedules or locations. The Engineer will not delay sampling for the Contractor to witness the sampling.
39-4.03 Engineer Testing for Verification.--Test data from the samples taken by the Engineer will be used to verify the Contractor's quality control test data.
The Engineer will sample and test for all material quality characteristics specified for statistical acceptance of the work. The Engineer's verification tests will be at a frequency of not less than 10 percent of the minimum quality control sampling and testing frequency required of the Contractor, and will be in accordance with Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification. The Engineer's verification tests will be performed using the same test methods used by the Contractor.
A standard statistical test, the t-test for sample means, as specified in Section 39-4.04, "Statistical Verification Tests," of this specification, will be used by the Engineer to verify the Contractor's quality control sampling and testing for acceptance of the material. All quality control test data reported by the Contractor since the last completed verification by the Engineer, for each indexed quality characteristic, will be used in the comparison. If the t-test does not indicate that the difference between the Contractor's test data and the corresponding Engineer's verification test data is significant (t <= tcrit), the Contractor's test data will be deemed verified and used by the Engineer to accept the material. If the t-test indicates that the difference between the Contractor's test data and the corresponding Engineer's verification test data is significant (t > tcrit), the Contractor's test data will be deemed unverified.
When the Contractor's test data are not verified by the Engineer, the Contractor will be notified in writing of the difference, and the Engineer and Contractor will cooperate to attempt to determine the source of the discrepancy. In addition, the Engineer will continue to sample asphalt concrete production, and will compare the cumulative verification test data to the cumulative unverified test data reported by the Contractor for the indexed quality characteristic in question.
If, after 5 consecutive verification tests by the Engineer, the Contractor's quality control test data is not verified (t > tcrit), acceptance and payment determination for the indexed quality characteristic in question on the asphalt concrete represented by the unverified test data will be made on the basis of the Engineer's verification test data only. The unverified test data will not be considered for acceptance purposes by the Engineer, nor will the test data be included in any subsequent t-test verification by the Engineer, pending the findings of the dispute resolution process as designated in Section 39-4.05, "Dispute Resolution," of this specification. In addition, the Contractor's sampling and testing program shall be deemed unacceptable and shall be disqualified from further sampling and testing. Before proceeding with asphalt concrete production, the Contractor shall propose in writing remedial measures which will be taken to provide an acceptable sampling and testing program. Asphalt concrete production shall not resume until the Contractor has received written notification that the revised sampling and testing program has been approved by the Engineer.
The Contractor shall not use any representative split portion of the samples taken by the Engineer for verification tests for determination of quality control test data.
Test data from the reserved representative split portions of verification samples will be used in the dispute resolution process as designated in Section 39-4.05, "Dispute Resolution," of this specification.
39-4.04 Statistical Verification Tests.--The Engineer shall determine the acceptability of the Contractor's quality control test data for material acceptance purposes using the t-test for sample means.
The Contractor's quality control test data will be considered verified at a level of significance, a = 0.01.The t-value of the group of test data to be verified (t ) is computed as follows:


where: nc = Number of Contractor's quality control tests (min. 2 required)
nv = Number of Verification tests (min. 1 required)
= Mean of the Contractor's quality control tests
= Mean of the Verification tests
Sp = Pooled standard deviation
(When nv = 1, Sp = Sc)
Sc = Standard deviation of the Contractor's quality control tests
Sv = Standard deviation of the Verification tests (when nv > 1)
(Use the standard deviation of the Contractor's quality control tests when nv = 1)
Compute t using the equation above and compare to the critical t-value, tcrit , from the following table:
| degrees
of freedom
(nc+nv-2)
|
tcrit for
a= 0.01
|
| 1
|
63.657
|
| 2
|
9.925
|
| 3
|
5.841
|
| 4
|
4.604
|
| 5
|
4.032
|
| 6
|
3.707
|
| 7
|
3.499
|
| 8
|
3.355
|
| 9
|
3.250
|
| 10
|
3.169
|
| 11
|
3.106
|
| 12
|
3.055
|
| 13
|
3.012
|
| 14
|
2.977
|
| 15
|
2.947
|
| 16
|
2.921
|
| 17
|
2.898
|
| 18
|
2.878
|
| 19
|
2.861
|
| 20
|
2.845
|
| 21
|
2.831
|
| 22
|
2.819
|
| 23
|
2.807
|
| 24
|
2.797
|
| 25
|
2.787
|
| 26
|
2.779
|
| 27
|
2.771
|
| 28
|
2.763
|
| 29
|
2.756
|
| 30
|
2.750
|
| 40
|
2.704
|
| 60
|
2.660
|
| 120
|
2.617
|
| [infinity]
|
2.576
|
When the t-value of the test data from the Engineer's verification tests and the Contractor's quality control tests is compared to tcrit from the previous table, if t is less than or equal to tcrit (t <= tcrit), the difference between the Contractor's quality control test data and the corresponding Engineer's verification test data is not significant, and the Contractor's test data are verified. When t is greater than tcrit (t > tcrit), the difference between the Contractor's quality control test data and the corresponding Engineer's verification test data is significant, and the Contractor's test data are not verified.
39-4.05 Dispute Resolution.--The Contractor and Engineer will work in partnership to avoid potential conflicts and to resolve any differences that may arise from unverified test data. As soon as an unsuccessful verification attempt is reported by the Engineer, both parties will review their sampling and testing procedures and share their findings. If an error in the Contractor's testing is detected during this review, the Contractor will either recalculate, if appropriate, or retest using the reserved representative split portions of quality control samples. This new test data shall be resubmitted to the Engineer for verification purposes. If an error in the Engineer's testing is detected, the Engineer will recalculate, if appropriate, or retest using a reserved representative split portion of the verification samples. Using the new test data, the Engineer will repeat the verification calculation of the Contractor's resubmitted test data using the statistical t-test as designated in Section 39-4.04, "Statistical Verification Tests," of this specification.
If the initial review does not reveal the source of the discrepancy, the Contractor may test the split verification samples and submit this test data to the Engineer for verification according to the requirements designated in Section 39-4.04, "Statistical Verification Tests," of this specification.
If the Contractor's quality control test data remain unverified after 5 consecutive verification samples have been obtained and tested, the Engineer will use the statistical t-test as designated in Section 39-4.03, "Statistical Verification Tests," of this specification, to verify the Contractor's test data on the 5 representative split portions of the verification samples. If the Contractor's test data for the 5 representative split portions of the verification samples are verified by the Engineer, then for purposes of acceptance and payment determination, the Contractor's unverified quality control test data will be replaced by the paired averages of the Engineer's and Contractor's test data for the 5 verification samples. If the Contractor's test data for the 5 representative split portions of the verification samples are not verified, the asphalt concrete represented by the unverified quality control tests will be accepted and paid for solely on the basis of the Engineer's verification test data. In either case, the Contractor's sampling and testing program will remain disqualified.
If neither the Contractor's quality control test data nor the test data of the representative split portions of the verification samples are verified by the Engineer, the Contractor may retain the services of the Third Party Laboratory designated in the Contractor's approved Quality Control Plan to resolve the difference. The Third Party Laboratory will perform the test method in question using the reserved representative split portions of the 5 verification samples. This test data will be submitted to the Engineer for verification . The Engineer will use the statistical t-test designated in Section 39-4.04, "Statistical Verification Tests," of this specification, to compare the Third Party Laboratory test data to the Engineer's verification test data. Both the Contractor and Engineer may witness the Third Party Laboratory testing.
If the Third Party Laboratory test data verifies the Engineer's verification test data, the asphalt concrete represented by the unverified quality control test data will be accepted and paid for using the paired averages of the Third Party Laboratory test data and the Engineer's verification test data. All costs related to the Third Party Laboratory testing shall be responsibility of the Contractor, and no additional compensation will be allowed. The Contractor's sampling and testing program shall remain disqualified.
If the Third Party Laboratory test data does not verify the Engineer's verification test data, the Engineer will use the statistical t-test to compare the Third Party Laboratory test data to the Contractor's unverified quality control test data. If the Contractor's quality control test data are verified by the Third Party Laboratory test data, acceptance and payment determination by the Engineer will be based on the Contractor's quality control test data. All costs of the Third Party Laboratory testing will be the Engineer's responsibility. The Contractor's quality control sampling and testing program shall be considered qualified, and the Engineer's verification sampling and testing program will be modified as necessary.
If the Third Party Laboratory test data fails to verify either the Engineer's verification test data or the Contractor's quality control test data, acceptance and payment determination will be based on the Third Party Laboratory test data. All costs for the Third Party Laboratory testing shall be split equally by the Engineer and the Contractor. The Contractor's sampling and testing program shall remain disqualified. The Engineer's verification sampling and testing program will be modified as necessary.
When the dispute is over relative compaction, the Third Party Laboratory will obtain test maximum densities using the reserved representative split portions of the verification samples. The Third Party Laboratory will re-calibrate the Engineer's nuclear density gage with cores obtained from the most recent 500 feet of complete in place asphalt concrete surfacing not yet opened to public traffic. If no 500-foot section of asphalt concrete surfacing not yet opened to public traffic is available, the Contractor shall construct a 500-foot test strip, to the thickness to be placed, at a location on the project approved by the Engineer. The Third Party Laboratory will use the new calibration to re-calculate the nuclear density gage readings for determination of the Engineer's verification test data and will use the new calibration to determine relative compaction. If the re-calculated relative compaction test data verifies the Engineer's verification test data, subsequent testing by the Engineer will use the re-calibrated nuclear density gage. If the re-calculated relative compaction test data verifies the Engineer's verification test data, all costs related to the Third Party Laboratory testing shall be the responsibility of the Contractor, and no additional compensation will be allowed. The Contractor's sampling and testing program shall remain disqualified. If the re-calculated relative compaction test data do not verify the Engineer's verification test data, the Engineer may choose to re-calibrate the Engineer's nuclear density gage or may use the Third Party Laboratory calibration and all costs for the re-calibration shall be the responsibility of the Engineer. The Contractor's sampling and testing program shall remain disqualified.
If the Contractor's sampling and testing program is disqualified, the Contractor shall submit a plan for improving the Contractor's sampling and testing program which satisfies the requirements of the Quality Control Plan, as designated in Section 39-3, "Contractor Quality Control," of this specification. The Contractor shall not continue to use the disqualified sampling and testing program for quality control sampling and testing to be considered for acceptance and payment determination during the dispute resolution process as specified herein.
Should the Third Party Laboratory test data obtained during the process of dispute resolution, as specified herein, verify the Contractor's quality control test data and if, in the opinion of the Engineer, the Contractor's controlling operation is delayed or interfered with by reason of the delay caused by the dispute resolution process, the delay will be considered a right of way delay as specified in Section 8-1.09, "Right of Way Delays," of the Standard Specifications.
When the Contractor adds supplemental fine aggregate, each such supplemental fine aggregate used shall be stored separately and kept thoroughly dry.
The measurement and storage requirements of this Section 39-5, shall not apply to the dust collected in skimmers and expansion chambers (knock-out boxes) or to the dust collected in centrifugal (cyclone) collectors. Dust from these collectors may be returned to the aggregate without being measured or stored separately, provided the dust is returned uniformly at a point in advance of the sampling device in batch-mixing plants or is returned at or before mixing in continuous mixing plants.
Aggregate and asphalt binder shall be stored in conformance with the following requirements:
39-5.01A Aggregate Cold Storage.--The Contractor shall feed the material from storage with a mechanical feeder. Before being fed to the drier, aggregate shall be separated into 3 or more sizes and stored separately.
39-5.0lB Aggregate Hot Storage.--The Contractor shall store aggregate for asphalt concrete to be mixed in batch mixing plants, after being dried, in accordance with the following requirements:
Aggregates for asphalt concrete shall be separated into 3 or more sizes.
After the aggregate is separated, each size shall be stored in a separate bin and shall be recombined in conformance with the provisions specified in Section 39-5.03, "Proportioning for Batch Mixing," of this specification, to conform to the gradings specified in Section 39-2, "Materials," of this specification. Storage bins shall be provided with chutes to prevent overflow into adjacent bins.
39-5.01C Asphalt Binder Storage.--Asphalt to be used as a binder for asphalt concrete shall be stored in tanks accurately calibrated in 100-gallon increments and maintained to this accuracy. The tanks shall be made accessible for measuring the volume of asphalt at any time.
The Contractor shall provide a suitable sampling device in asphalt feed lines connecting plant storage tanks to the asphalt weighing system or spray bar. The sampling device shall consist of a valve with a nominal diameter between 1/2 inch and 3/4 inch, constructed in such a manner that a one-quart sample may be withdrawn slowly at any time during plant operations. The Contractor shall maintain the valve in good condition and, if the valve fails to function properly, replace the valve. The sampling device shall be readily accessible and in an area free of dangerous obstructions and shall be between 24 and 30 inches above the platform. A drainage receptacle shall be provided by the Contractor for flushing the device prior to sampling.
The Contractor shall maintain the discharge end of the asphalt binder circulating pipe below the surface of the asphalt binder in the storage tank to prevent discharging hot asphalt binder into open air.
The Contractor shall install a temperature sensing device in the asphalt feed line. The device shall measure the temperature of the asphalt and shall be accurate to 10deg. F. increments. An automatic, continuous recording device shall be provided and used to maintain accurate records of the asphalt temperature during production.
39-5.02 Drying.--Aggregate shall be fed directly to a drier-drum mixer or to a drier at a uniform rate.
Drying shall continue for a sufficient period of time and at a sufficiently high temperature so that, at the time of spreading, the moisture content of the completed asphalt concrete mixture shall not exceed 1.0 percent and the minimum and maximum asphalt concrete mixture temperatures are not exceeded. Moisture content will be determined by California Test 310 or 370.
The drier or drier-drum mixer shall be provided with a device which senses the temperature of the material leaving the drier or the drier-drum mixer. The temperature-sensing device shall be accurate to the nearest 10deg. F. The device shall be located so that changes of 10deg. F. in temperature of the material will be indicated within one minute. An automatic continuous recording device shall be provided and used to maintain accurate records of the temperatures during production.
The burner used for heating the aggregate shall achieve complete combustion of the fuel.
39-5.03 Proportioning for Batch Mixing.--When the Contractor elects to use batch mixing equipment, each aggregate storage bin shall be equipped with a suitable, safe sampling device which will provide a sample, representative of actual production, of the aggregate discharged into the weigh hopper or volumetric proportioning bin. When such samples are taken from a location above ground level, a means shall be provided for lowering the aggregate samples to the ground.
Fine material collected in all dust control systems, other than centrifugal collectors or knock-out boxes, is considered to be supplemental fine aggregate. When supplemental fine aggregate is used, it shall be proportioned by weight as provided in the subsection, "Weight Proportioning," of Section 39-5.03A, "Manual Proportioning," of this specification. A suitable, safe sampling device shall be installed in each feed line or surge tank preceding the weigh hopper.
Aggregate and asphalt shall be proportioned by weight or by volume as follows:
39-5.03A Manual Proportioning.--An automatic plant shall not be operated manually unless the automatic circuitry is disconnected to the extent that it cannot be activated by the mere operation of a switch, circuit breaker, or some other similar routine procedure.
When manual proportioning is used in the production of asphalt concrete, proportioning shall conform to the following:
1. Weight Proportioning.--The zero tolerance for aggregate scales shall be 0.5-percent of the total batch weight of the aggregate. The zero tolerance for separate scales for weighing supplemental fine aggregate or asphalt binder shall be 0.05-percent of the total batch weight of the aggregate.The indicated weight of material drawn from storage for any draft of material shall not vary from the preselected scale setting by more than the following percentages of the total batch weight of the aggregate:
a. Aggregate shall be within one percent, except that when supplemental fine aggregate is used and is weighed cumulatively with the aggregate, the draft of aggregate drawn immediately before the supplemental fine aggregate shall be within 0.5-percent.
b. Supplemental fine aggregate shall be within 0.5-percent.
c. Asphalt binder shall be within 0.1-percent.
The asphalt binder shall be measured by a tank scale.
2. Volumetric Proportioning.--Each size of aggregate, except supplemental fine aggregate, shall be proportioned in a separate bin that is adjustable in size. Each bin shall have a gate or other device designed so that the bin shall be completely filled and struck off in measuring the volume of aggregate to be used in the mix. Means shall be provided for calibrating the weight of material in each measuring bin at any time. The plant shall be operated so that the material in each aggregate bin is within 2 percent of the weight pre-selected for the type of mixture being produced.
Asphalt binder shall be proportioned by a meter or an adjustable calibrated tank. When meters are used, the asphalt lines leading to the asphalt meters shall be full-circulating or shall be regulated so that during plant stoppages, the temperature of the asphalt does not change more than 15deg. F. from the temperature maintained while the plant is in full operation. Asphalt binder shall be proportioned to within 2 percent of the weight preselected for the asphalt concrete mixture being produced.
39-5.03B Automatic Proportioning.--When automatic batch mixing is required in "Asphalt Concrete," in Section 10-1, "General," elsewhere in these special provisions, or when the Contractor elects to use an automatic batching system, the proportioning devices shall be automatic to the extent that the only manual operation required for proportioning all materials for one batch shall be a single operation of a switch or starter.
When automatic proportioning is used in the production of asphalt concrete, proportioning shall conform to the following:
1. Weight Proportioning.--Automatic proportioning devices shall be of a type in which materials discharged from the several bins are controlled by gates or by mechanical conveyors. The batching devices shall be so interlocked that no new batch may be started until all weigh hoppers are empty, the scales are at zero, and the discharge gates are closed. The means of withdrawal from the bins and of discharge from the weigh box shall be interlocked so that not more than one bin can discharge onto any given scale at one time, and that the weigh box cannot be tripped until the required quantity from each of the bins has been deposited therein. In addition, automatic proportioning devices shall be interlocked so that the weighing cycle will be interrupted whenever the amount of material drawn from any storage varies from the preselected amount by more than the tolerances specified in Section 39-5.03A, "Manual Proportioning," of this specification. Whenever the weighing cycle is interrupted, that specific batch shall not be used in the work unless it can be manually adjusted to meet the specified tolerances based on the total weight of the batch. When partial batches are batched automatically, the interlock tolerances, except the zero tolerance, shall apply to the total weight of aggregate in the partial batch.
Automatic proportioning devices shall be operated so that all weight increments required for a batch are preset on the controls at the same time. Controls shall be designed so that these settings may be changed without delay, and the order of discharge from the several bins can be changed.
Automatic proportioning controls shall be equipped with means for inspection of the interlock tolerance settings, and instructions for doing so shall be immediately available at the point of operation.The Contractor shall provide the necessary means to check the weights of various proportioned amounts on a separate scale located at the plant.
2. Volumetric Proportioning.--Asphalt binder shall be proportioned by an adjustable calibrated tank.
Automatic volumetric proportioning devices shall be of a type which will not allow the bins to discharge into the mixer unless the mixer is empty and the mixer discharge gate is closed and will not operate unless the aggregate bins and asphalt binder tank are full. The automatic proportioning device shall operate in such a manner that the material in each aggregate bin and the asphalt binder tank is within 2 percent of the preselected weights.
The Contractor shall provide the necessary means to check the weights of various proportioned amounts on a separate scale located at the plant.
39-5.03C Proportioning for Continuous Mixing.--Asphalt binder shall be introduced into the mixer through a meter conforming to the requirements of Section 9-1.01, "Measurement of Quantities," of the Standard Specifications. The asphalt meter shall automatically compensate for changes in asphalt temperature, unless the meter is of the mass flow, coriolis effect, type. The system shall be capable of varying the rate of delivery of binder proportionate with the delivery of aggregate. During any day's run, the temperature of asphalt binder shall not vary more than 50deg. F. The meter and lines shall be heated and insulated. The binder storage shall be equipped with a device for automatic plant cut-off when the level of binder is lowered sufficiently to expose the pump suction line.
When supplemental fine aggregate is used, it shall be proportioned by weight by a method that uniformly feeds the material within 2 percent of the required amount. Supplemental fine aggregate shall be discharged from the proportioning device directly into the mixer.
The supplemental fine aggregate proportioning system shall function with a degree of accuracy such that, when operated at between 30 percent and 100 percent of maximum operating capacity, the average difference between the indicated weight of material delivered and the actual weight delivered shall not exceed one percent of the actual weight for three, 15-minute runs. For any of the 3, individual 15-minute runs, the indicated weight of material delivered shall not vary from the actual weight delivered by more than 2 percent of the actual weight.
The fine material collected in all dust control systems may be returned to the aggregate production stream without proportioning if returned at a rate commensurate with overall plant production, and if returned at or before the mixer. Any return rate of less than 100 percent of the collection rate shall be metered as specified above for supplemental fine aggregate.
The asphalt feeder, each of the aggregate feeders, the supplemental fine aggregate feeder, if used, and the combined aggregate feeder, shall be equipped with devices by which the rate of feed can be determined while the plant is in full operation.
The combined aggregate shall be weighed using a belt scale. The belt scale shall be of such accuracy that, when the plant is operating between 30 percent and 100 percent of belt capacity, the average difference between the indicated weight of material delivered and the actual weight delivered shall not exceed one percent of the actual weight for three, 3-minute runs. For any of the 3 individual 3-minute runs, the indicated weight of material delivered shall not vary from the actual weight delivered by more than 2 percent of the actual weight.
The actual weight of material delivered for proportioning device calibrations shall be determined by a vehicle scale conforming to the requirements of Section 9-1.01, "Measurement of Quantities," of the Standard Specifications. The vehicle scale shall be located at the plant and shall be sealed within 24 hours of checking the plant's proportioning devices. The plant shall be equipped so that this accuracy check can be made prior to the first production operation for a project and at any other time as directed by the Engineer.
The belt scale for the combined aggregate, the proportioning devices for supplemental fine aggregate, if used, and the asphalt proportioning meter shall be interlocked so that the rates of feed of the aggregates and asphalt will be adjusted automatically (at all production rates and production rate changes) to maintain the asphalt ratio (pounds of asphalt per 100 pounds of dry aggregate including supplemental fine aggregate, if used) designated in the verified mix design provided by the Contractor in accordance with the requirements of Section 39-2.01, "Mix Design," of this specification. The plant shall not be operated unless this automatic system is functioning and in good working condition.
Asphalt meters and aggregate belt scales used for proportioning aggregates and asphalt shall be equipped with rate-of-flow indicators to show the rates of delivery of asphalt and aggregate. Meters and scales shall be equipped with resettable totalizers so that the total amounts of asphalt and aggregate introduced into the asphalt concrete mixture can be determined. Rate-of-flow indicators and totalizers for like materials shall be accurate within one percent when compared directly. The asphalt cement totalizer shall not register when the asphalt metering system is not delivering material to the mixer.
The bin or bins containing the fine aggregate and supplemental fine aggregate, if used, shall be equipped with vibrating units or other equipment which will prevent any hang-up of material while the plant is operating. Each belt feeder shall be equipped with a device to monitor the depth of aggregate between the troughing rollers. The device for monitoring depth of aggregate shall automatically shut down the plant whenever the depth of aggregate is less than 70 percent of the target depth. To avoid erroneous shut down by normal fluctuations, a delay between sensing less than 70 percent flow and shutdown of the plant will be permitted, as determined by the Engineer, at the time of the initial California Test 109. A second device shall be located either in the stream of aggregate beyond the belt or where it will monitor movement of the belt by detecting revolutions of the tail pulley on the belt feeder. The device for monitoring no-flow or belt movement, as the case may be, shall stop the plant automatically and immediately when there is no flow. The plant shall not be operated unless both low-flow and no-flow monitoring devices are in good working condition and functioning properly.
For continuous pugmill mixing plants an aggregate sampling device which will provide a 60 to 80-pound sample of the combined aggregate while the plant is in full operation shall be provided in advance of the point where the aggregate enters the mixer.
For drier-drum mixing plants an aggregate sampling device which will provide a 60 to 80-pound sample of the combined aggregate while the plant is in full operation shall be provided in advance of the point where the aggregate enters the drier-drum mixer.
When the samples are taken from a location above ground level, the Contractor shall provide a means for safely lowering the aggregate samples to the ground.
When supplemental fine aggregate is used, a suitable, safe sampling device shall be installed in each feed line or surge tank preceding the proportioning device for the supplemental fine aggregate.
39-5.04 Mixing.--Aggregate, supplemental fine aggregate, and asphalt binder shall be mixed in a batch mixer, continuous mixing pugmill mixer, or continuous mixing drier-drum. The charge in a batch mixer, or the rate of feed to a continuous mixer, shall not exceed that which will permit complete mixing of all of the material. Dead areas in the mixer, in which the material does not move or is not sufficiently agitated, shall be corrected by a reduction in the volume of material or by other adjustments.
Asphalt binder shall be at a temperature of not less than 250deg. F. nor more than 375deg. F. when added to the aggregate.
The temperature of the aggregate before adding the binder shall be not more than 325deg. F.Mixing shall conform to the following requirements:
39-5.04A Batch Mixing.--When asphalt concrete is produced by batch mixing, the mixer shall be equipped with a sufficient number of paddles of a type and arrangement so as to produce a properly mixed batch.
The binder shall be introduced uniformly into the mixer along the center of the mixer parallel to the mixer shafts, or by pressure spraying. When a pan is used, it shall be equipped with movable vanes in order that the flow of binder may be directed across the width of the pan, as desired. The vanes shall be equipped with a means for quick adjustment, and a positive lock to prevent shifting.
The mixer platform shall be of ample size to provide safe and convenient access to the mixer and other equipment. The mixer housing and weighbox housing shall be equipped with gates of ample size to permit ready sampling of the discharge of aggregate from each of the plant bins and from each feed line or surge tank of supplemental fine aggregate, if used. The Contractor shall provide a sampling device capable of delivering a representative sample of sufficient size to permit the required tests.
The mixer shall be equipped with a timing device which will indicate by a definite audible or visual signal the expiration of the mixing period. The device shall measure the time of mixing within 2 seconds.
The time of mixing a batch shall begin on the charging stroke of the weighhopper dumping mechanism and shall end when discharge is started. Mixing shall continue until a homogeneous asphalt concrete mixture of uniformly distributed and properly coated aggregates of unchanging appearance is produced. The time of mixing shall be not less than 30 seconds.
When automatic proportioning or automatic batch mixing is required in "Asphalt Concrete," in Section 10-1, "General," elsewhere in these special provisions, or when the Contractor elects to use an automatic batching system, an interval timer shall control the time of mixing. The interval timer shall be interlocked so that the mixer cannot be discharged until all of the materials have been mixed for the full amount of time specified.
39-5.04B Continuous Mixing.--Continuous mixing plants shall utilize pugmill or drier-drum mixers.
When asphalt concrete is produced by pugmill mixing, the mixer shall be equipped with paddles of a type and arrangement to provide sufficient mixing action and movement to the asphalt concrete mixture to produce properly mixed asphalt concrete. The combined aggregate shall be fed directly from the drier to the mixer at a uniform and controlled rate.
Mixing shall continue until a homogeneous asphalt concrete mixture of thoroughly and uniformly coated aggregates of unchanging appearance is produced at the discharge point from the mixer.
The temperature of the completed asphalt concrete mixture shall not exceed 325deg. F. upon discharge from the mixer.
The mixer shall discharge into a storage silo with a capacity of not less than that specified in Section 39-5.05, "Asphalt Concrete Storage," of this specification. The Contractor shall provide a means of diverting the flow of asphalt concrete away from the silo to prevent incompletely mixed portions of the asphalt concrete mixture from entering the silo.
39-5.05 Asphalt Concrete Storage.--When asphalt concrete is stored, it shall be stored only in silos. Asphalt concrete shall not be stockpiled. The minimum quantity of asphalt concrete in any one silo during mixing shall be 20 tons except for the period immediately following a shutdown of the plant of 2 hours or more. A means shall be provided to indicate that storage in each silo is being maintained as required.
Storage silos shall be equipped with a surge-batcher sized to hold a minimum of 4,000 pounds of material. A surge-batcher consists of equipment placed at the top of the storage silo which catches the continuous delivery of the completed asphalt concrete mix and changes it to individual batch delivery to prevent the segregation of product ingredients as the completed asphalt concrete mix is placed into storage. The surge-batcher shall be center loading and shall be thermally insulated or heated to prevent material buildup. Rotary chutes shall not be used as surge-batchers.
The surge-batcher shall be independent and distinct from conveyors or chutes used to collect or direct the completed asphalt concrete mixture being discharged into storage silos and shall be the last device to handle the material before it enters the silo. Multiple storage silos shall be served by an individual surge-batcher for each silo. Material handling shall be free of oblique movement between the highest elevation (conveyor outfall) and subsequent placement in the silo. Discharge gates on surge-batchers shall be automatic in operation and shall discharge only after a minimum of 4,000 pounds of material has been collected and shall close before the last collected material leaves the device. Discharge gate design shall prevent the deflection of material during the opening and closing operation.
Asphalt concrete stored in excess of 18 hours shall not be used in the work. Asphalt concrete mixture containing hardened lumps shall not be used. Any storage facility which contained the material with the hardened lumps shall not be used for further storage until the cause of the lumps is corrected.
39-5.06 Asphalt Concrete Plants.--Any plant, including commercial plants, that produce asphalt concrete that is subject to these specifications shall conform to the provisions in Section 7-1.01F, "Air Pollution Control," of the Standard Specifications, and shall be equipped with a wet-tube dust washer or equal and other devices which will reduce the dust emission to the degree that adjacent property is not damaged. The washer and other equipment shall function efficiently at all times when the plant is in operation.
During production, petroleum products such as diesel fuel and kerosene shall not be used as a release agent on belts, conveyors, hoppers or hauling equipment.
Plants shall be equipped with an inspection dock constructed so that a quality control technician or inspector standing on the dock can inspect the completed asphalt concrete mixture and take samples, as necessary, from the hauling vehicle before the vehicle leaves the plant site. This inspection dock shall allow the hauling vehicle to pull alongside and shall meet all applicable safety requirements of the California Division of Occupational Safety and Health. Haul vehicle drivers shall be instructed to stop at the dock whenever a quality control technician or inspector is on the dock and to remain there until directed to leave by that individual.
39-6.02 Prime Coat and Paint Binder (Tack Coat).--A prime coat of liquid asphalt shall be applied to the areas to be surfaced when there is a contract item for the work or when the work is required in "Asphalt Concrete," in Section 10-1, "General," elsewhere in these special provisions.
Prime coat shall be applied only to those areas designated by the Engineer.
Prime coat shall be applied at the approximate total rate of 0.25-gallon per square yard of surface covered. The exact rate and number of applications will be determined by the Engineer.
Prime coat shall be applied at a temperature conforming to the range of temperatures provided in Section 93-1.03, "Mixing and Applying," of the Standard Specifications, for distributor application of the grade of liquid asphalt being used.
A paint binder (tack coat) of asphaltic emulsion shall be furnished and applied in accordance with the provisions in Section 94, "Asphaltic Emulsions," of the Standard Specifications, and shall be applied to all vertical surfaces of existing pavement, curbs, gutters, and construction joints in the surfacing against which additional material is to be placed, to a pavement to be surfaced, and to other surfaces designated in "Asphalt Concrete," in Section 10-1, "General," elsewhere in these special provisions.
Paint binder (tack coat) shall be applied in one application at a rate of from 0.02 to 0.10-gallon per square yard of surface covered. The exact rate of application will be determined by the Engineer.
At the Contractor's option, paving asphalt may be used for paint binder (tack coat) instead of asphaltic emulsion. If paving asphalt is used, the grade to be used and the rate of application will be determined by the Engineer. The paving asphalt shall be applied at a temperature of not less than 285deg. F., nor more than 350deg. F.
Prime coat or paint binder (tack coat) shall be applied only so far in advance of placing the surfacing as may be permitted by the Engineer. When asphaltic emulsion is used as a paint binder (tack coat), the asphalt concrete shall not be placed until the asphaltic emulsion has cured.
Immediately in advance of placing asphalt concrete, additional prime coat or paint binder (tack coat) shall be applied as directed by the Engineer to areas where the prime coat or paint binder (tack coat) has been damaged, and loose or extraneous material shall be removed, and no additional compensation will be allowed therefor.
39-6.03 Pavement Reinforcing Fabric.--Pavement reinforcing fabric shall be placed on existing pavement to be surfaced or between layers of asphalt concrete when such work is shown on the plans, or specified in "Asphalt Concrete," in Section 10-1, elsewhere in these special provisions, or ordered by the Engineer.
Before placing the pavement reinforcing fabric, a binder of paving asphalt shall be applied to the surface to receive the pavement reinforcing fabric at an approximate rate of 0.25-gallon per square yard of surface covered. The exact rate will be determined by the Engineer. The binder shall be applied to a width equal to the width of the fabric mat plus 3 inches on each side.
Before applying binder, large cracks, spalls and depressions in existing pavement shall be repaired as directed by the Engineer, and the repair work will be paid for as extra work as provided in Section 4-1.03D, "Extra Work," of the Standard Specifications.
The fabric shall be aligned and placed with no wrinkles that lap. The test for lapping shall be made by gathering together the fabric in a wrinkle. If the height of the doubled portion of extra fabric is 1/2-inch or more, the fabric shall be cut to remove the wrinkle, then lapped in the direction of paving. Lap in excess of 2 inches shall be removed. Pavement reinforcing fabric shall not be placed in areas of conform tapers where the thickness of the overlying asphalt concrete is 0.10-foot or less.
If manual laydown methods are used, the fabric shall be unrolled, aligned, and placed in increments of approximately 30 feet.
Adjacent borders of the fabric shall be lapped 2 to 4 inches. The preceding roll shall be lapped 2 to 4 inches over the following roll in the direction of paving at ends of rolls or at any break. At fabric overlays, both the binder and the fabric shall overlap previously placed fabric by the same amount.
Seating of the fabric with rolling equipment after placing will be permitted. Turning of the paving machine and other vehicles shall be gradual and kept to a minimum to avoid damage to the fabric.
A small quantity of asphalt concrete, to be determined by the Engineer, may be spread over the fabric immediately in advance of placing asphalt concrete surfacing in order to prevent fabric from being damaged by construction equipment.
Public traffic shall not be allowed on the bare reinforcing fabric, except that public cross traffic may be allowed to cross the fabric under traffic control after the Contractor has placed a small quantity of asphalt concrete over the fabric.
Care shall be taken to avoid tracking binder material onto the pavement reinforcing fabric or distorting the fabric during seating of the fabric with rolling equipment. If necessary to protect the pavement reinforcing fabric, exposed binder material may be covered lightly with sand.
The asphalt paver shall operate independently of the vehicle being unloaded or shall be capable of propelling the vehicle being unloaded in a satisfactory manner. The load of the haul vehicle shall be limited to that which will insure satisfactory spreading. While being unloaded the haul vehicle shall be in contact with the machine at all times, and the brakes on the haul vehicle shall not be depended upon to maintain contact between the vehicle and the machine.
No portion of the weight of hauling or loading equipment, other than the connection, shall be supported by the asphalt paver, and no vibrations or other motions of the loader, which could have a detrimental effect on the riding quality of the completed pavement, shall be transmitted to the paver.
When asphalt concrete is placed directly upon asphalt treated permeable base, the asphalt concrete shall be placed with a paver equipped with tracks unless the layer being placed is 0.15-foot or less in compacted thickness.
39-7.02 Compacting Equipment.--The Contractor shall furnish a sufficient number of rollers to obtain the specified compaction and surface finish required by these specifications. One roller each shall be provided for breakdown, intermediate, and finish rolling. The Contractor shall size the rollers to achieve the required results.
All rollers shall be equipped with pads and water systems which prevent sticking of asphalt concrete mixtures to the pneumatic or steel-tired wheels. A parting agent which will not damage the asphalt concrete mixture, as approved by the Engineer, may be used to aid in preventing the sticking of the asphalt concrete mixture to the wheels.
Asphalt concrete shall be placed in such a manner so that cracking, shoving and displacement will be avoided.
Type A and Type B asphalt concrete shall be placed only when the atmospheric temperature is above 50deg. F.
Asphalt concrete shall not be placed when the underlying layer or surface is frozen or when weather conditions will prevent proper handling, finishing, or compaction of the mixture.
Asphalt concrete shall be spread and compacted in the number of layers of the thicknesses indicated in the following table. All thicknesses shown are in hundredths of a foot.
Total Thick-ness
Shown on the
|
No.
of
|
Top Layer
Thickness
|
Next Lower Layer
Thickness
|
All Other Lower Layers
Thickness
| |||
| Plans*
|
Layers
|
Min.
|
Max.
|
Min.
|
Max.
|
Min.
|
Max.
|
| 20 or
25
|
one
|
--
|
--
|
--
|
--
|
--
|
--
|
| 35
through 45
|
2
|
15
|
20
|
20
|
25
|
--
|
--
|
| 50 or
more
|
**
|
15
|
20
|
15
|
25
|
20
|
40
|
Notes:
* When pavement reinforcing fabric is shown to be placed between layers of asphalt concrete, the thickness of asphalt concrete above the pavement reinforcing fabric shall be considered to be the "Total Thickness Shown on the Plans" for the purpose of spreading and compacting the asphalt concrete above the pavement reinforcing fabric.
** At least 3 layers if total thickness is 0.50-foot or more and less than 0.90-foot. At least 4 layers if total thickness is 0.90-foot or more.
A layer shall not be placed over a layer which exceeds 0.25-foot in compacted thickness until the temperature of the layer being covered is less than 160deg. F. at mid depth.
Asphalt concrete to be placed on shoulders, and on other areas off the traveled way having a width of 5 feet or more, shall be spread in the same manner as above.
The completed mixture shall be deposited on the roadbed at a uniform quantity per linear foot, as necessary to provide the required compacted thickness without resorting to spotting, picking-up or otherwise shifting the mixture.
Segregation shall be avoided, and the surfacing shall be free from pockets of coarse or fine material. Asphalt concrete containing hardened lumps shall not be used.
Longitudinal joints in the top layer shall correspond with the edges of proposed traffic lanes. Longitudinal joints in all other layers shall be offset not less than 0.5-foot alternately each side of the edges of traffic lanes.
Unless otherwise provided herein or permitted by the Engineer, the top layer of asphalt concrete for shoulders, tapers, transitions, road connections, private drives, curve widenings, chain control lanes, turnouts, left turn pockets, and other such areas, shall not be spread before the top layer of asphalt concrete for the adjoining through lane has been spread and compacted. At locations where the number of lanes is changed, the top layer for the through lanes shall be paved first. When existing pavement is to be surfaced and the specified thickness of asphalt concrete to be spread and compacted on the existing pavement is 0.25-foot or less, shoulders or other adjoining areas may be spread simultaneously with the through lane provided the completed surfacing conforms to the requirement of this specification. Tracks or wheels of spreading equipment shall not be operated on the top layer of asphalt concrete in any area until final compaction has been completed.
At location shown on the plans, specified in "Asphalt Concrete," in Section 10-1, "General," elsewhere in these special provisions, or as directed by the Engineer, the asphalt concrete shall be tapered or feathered to conform to existing surfacing or to other highway and non-highway facilities.
At locations where the asphalt concrete is to be placed over areas inaccessible to spreading and rolling equipment, the asphalt concrete shall be spread by any means practicable so as to obtain the specified results and shall be compacted thoroughly to the required lines, grades and cross sections by means of pneumatic tampers, or by other methods that will produce the same degree of compaction as pneumatic tampers.
39-8.02 Test Strip Start Up Procedures.--On the first day of asphalt concrete production, of each asphalt concrete mixture, the Contractor shall produce an initial quantity of asphalt concrete mixture sufficient to construct a test strip of asphalt concrete surfacing to the thickness representative of the operations for each asphalt concrete mixture. The test strip shall contain a minimum of 100 tons, and a maximum of 500 tons, of complete in place asphalt concrete. The amount of asphalt concrete to be initially produced for the construction of the test strip shall be proposed to the Engineer by the Contractor, and shall be approved by the Engineer. The Contractor shall construct the test strip on the project at a location approved by the Engineer. The purpose of the test strip is to establish a rolling pattern which will produce the specified asphalt concrete density, to develop a correlation between cores taken from the test strip and the Contractor's and Engineer's nuclear density gage readings taken at the core locations on the test strip, and to verify the Contractor's mix design and asphalt concrete mixture quality characteristics which shall be produced for the contract.
The Contractor shall construct the test strip using asphalt concrete mix production, lay-down and compaction procedures and equipment intended for the entire project. The Contractor shall stop production of asphalt concrete after construction of the test strip until the specified quality characteristics of the asphalt concrete mixture and the density values of the test strip have been tested, verified and accepted by the Engineer according to the requirements designated in Section 39-4.03, "Engineer Testing for Verification," of this specification.
Attention is directed to longitudinal and transverse construction joint requirements specified in "Asphalt Concrete" in Section 10-1, "General," elsewhere in these special provisions.
The following sampling and testing requirements shall apply to the test strip:
The Contractor shall obtain 3 representative asphalt concrete mixture samples from the test strip and shall evaluate the material for conformance to the asphalt concrete mixture requirements specified in Section 39-2.03, "Aggregate," of this specification. The Engineer will also obtain 3 representative asphalt concrete mixture samples from the test strip at the same location for purposes of verification of the Contractor's test data. The Contractor's test data will be considered verified if the asphalt concrete mixture design parameters conform to the requirements specified herein for minimum and maximum values and the design parameter of asphalt concrete mixture percent air voids is within +/- 1.0 percent of the percent air voids designated in the Contractor's verified mix design submitted in accordance with the requirements of Section 39-2.01, "Mix Design," of this specification. The asphalt concrete mixture is acceptable if the verified test data for the design parameters from the 3 asphalt concrete mixture samples are within the specified limits.
The Contractor shall obtain 5 representative samples and shall evaluate the material quality characteristics for conformance to the requirements specified in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification. If the test data from one or more samples are outside the specified limits, but the average of the test data from all samples is within the specification limits, the Engineer may tentatively accept the test strip with the Contractor's assurance that adjustments to the process will be made to correct the indicated quality characteristic deficiencies in the asphalt concrete mixture.
The Contractor shall obtain nuclear density gage readings for density and relative compaction determinations, and obtain 2 core samples each at a minimum of 10 locations selected at random within the test strip. The Engineer will obtain nuclear density gage readings at the same locations within the test strip as the Contractor. The Contractor shall perform the nuclear density gage tests according to California Test 375. The test data of each of the 2 cores shall be averaged to obtain one set of test data per location. The Contractor shall furnish the Engineer with the Contractor's calibration values for correlation of the nuclear density gage readings to the core densities. The test strip density will be acceptable if all core test data yield a pay factor of 0.90 or greater when determined in accordance with Section 39-10.02B, "Statistical Evaluation," of this specification.
The Contractor shall repeat the test strip process until the material properties and mix design parameters produced conform to the requirements specified herein and the test strip is accepted by the Engineer. Test strips that are accepted by the Engineer may remain in place and payment for the test strips will be determined by the procedure specified in Section 39-10.02B, "Statistical Evaluation and Determination of Pay Factor," of this specification. Test data used to accept the test strips will not be included with the test data used for acceptance of the work according to the requirements of Section 39-10, "Acceptance," of this specification. Upon receipt of written approval from the Engineer that the test strip has been accepted, full production of asphalt concrete may commence. The Contractor may request that unacceptable test strips be left in place.
The Contractor shall use the test strip start-up procedures specified herein when resuming production of asphalt concrete after a termination of asphalt concrete production due to unsatisfactory material quality characteristics.
39-8.03 Spreading.--All layers, except as otherwise specified, shall be spread with an asphalt paver, unless otherwise approved by the Engineer. Asphalt pavers shall be operated in such a manner as to insure continuous and uniform movement of the paver.
In advance of spreading asphalt concrete over an existing base, surfacing, or bridge deck, if there is a contract item for asphalt concrete (leveling), or if ordered by the Engineer, asphalt concrete shall be spread by any mechanical means that will produce a uniform smoothness and texture to level irregularities, and to provide a smooth base in order that subsequent layers will be of uniform thickness. Section 39-10.02, "Statistical Evaluation and Determination of Pay Factor," of this specification, shall not apply to asphalt concrete (leveling).
When directed by the Engineer, paint binder (tack coat) shall be applied to any layer in advance of spreading the next layer.
Before placing the top layer adjacent to cold transverse construction joints, the joints shall be trimmed to a vertical face and to a neat line. Transverse joints shall be tested with a 12-foot straightedge and shall be cut back as required to conform to the requirements specified in Section 39-8.04, "Compacting," of this specification, for surface smoothness. Connections to existing surfacing shall be feathered to conform to the requirements for smoothness. Longitudinal joints shall be trimmed to a vertical face and to a neat line if the edges of the previously laid surfacing are, in the opinion of the Engineer, in such condition that the quality of the completed joint will be affected.
39-8.04 Compacting.--Compacting equipment shall conform to the provisions of Section 39-7.03, "Compacting Equipment," of this specification.
Rolling shall commence at the lower edge and shall progress toward the highest portion, except that when compacting layers which exceed 0.25-foot in compacted thickness, and if approved by the Engineer, rolling shall commence at the center and shall progress outwards.
The Contractor shall monitor density during the compaction process with nuclear density gages calibrated to the control strip core density test data. Asphalt concrete shall be compacted to a relative compaction of not less than 96 percent and shall be finished to the lines, grades, and cross sections shown on the plans. In-place density of asphalt concrete will be determined prior to opening the pavement to public traffic.
Relative compaction shall be determined by California Test 375. Laboratory specimens shall be compacted in conformance with California Test 304. Test locations will be established for asphalt concrete areas to be tested, as specified in California Test 375.
Upon completion of rolling operations, if ordered be the Engineer, the asphalt concrete shall be cooled by applying water. Applying water shall conform to the provision in Section 17, "Watering," of the Standard Specifications.
The completed surfacing shall be thoroughly compacted, smooth, and free from ruts, humps, depressions, or irregularities. Any ridges, indentations or other objectionable marks left in the surface of the asphalt concrete by blading or other equipment shall be eliminated by rolling or other suitable means. The use of any equipment that leaves ridges, indentations, or other objectionable marks in the asphalt concrete shall be discontinued, and acceptable equipment shall be furnished by the Contractor.
When a straightedge 12 feet long is laid on the finished surface and parallel with the center line, the surface shall not vary more than 0.01-foot from the lower edge of the straightedge. The transverse slope of the finished surface shall be uniform to a degree such that no depressions greater than 0.02-foot are present when tested with a straightedge 12 feet long in a direction transverse to the center line and extending from edge to edge of a 12-foot traffic lane.
Pavement within 50 feet of a structure or approach slab shall conform to the smoothness tolerances specified in Section 51-1.17, "Finishing Bridge Decks," of the Standard Specifications.
39-10 ACCEPTANCE OF WORK
The Contractor's quality control test data which has been verified by the Engineer will form the basis for acceptance of the work. The quality requirements on which acceptance will be based are specified in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification.
Work determined by the Engineer to conform to the requirements specified herein will be paid for at the contract price per ton for asphalt concrete and may be subject to compensation adjustment in accordance with Section 39-10.02C, "Pay Factor Determination and Compensation Adjustment," of this specification.
Work that does not conform to the specified requirements may be rejected by the Engineer at any time and shall be removed and replaced by the Contractor, at the Contractor's expense.
If a lot is concluded with fewer than 5 samples, the work will be accepted or rejected based on the quality requirements specified in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification. Section 39-10.02, "Statistical Evaluation and Pay Factor Determination," of this specification, shall not apply to the lot. The Engineer may reject any batch, load, or portion of roadway that appears to not be in compliance with these specifications.
Any quantity of material that is determined to be defective may be rejected by the Engineer based on visual inspection or noncompliance with the specifications herein.
Rejected material shall not be incorporated into the roadway unless authorized in writing by the Engineer. The Contractor may request that work rejected by the Engineer on a visual basis be tested for conformance to the specifications.
If the Contractor elects to have material tested which was visually rejected by the Engineer, a minimum of 5 random samples of the material shall be obtained and split into representative portions and tested for compliance with the material quality requirements specified herein. Sampling of the material shall be witnessed by the Engineer. The Contractor shall provide the Engineer with one representative split portion of each sample obtained for verification testing purposes according to the requirements of Section 39-4.04 "Statistical Verification Tests," of this specification. If the Engineer cannot verify the Contractor's test data, no payment will be made and the material shall be removed at the Contractor's expense. In addition, the cost of the Engineer's verification testing will be deducted from any moneys due or to become due the Contractor. If the Engineer verifies the Contractor's test data, and the test data indicates that the material is in compliance with the material quality requirements specified herein, the cost of the Engineer's verification testing will be borne by the State. The test data obtained from testing this rejected material will be excluded from the payment determination of the lot .
39-10.02 Statistical Evaluation and Determination of Pay Factor.--Statistical evaluation of the work shall be used to verify the Contractor's quality control test data to determine compliance with the specified requirements.
39-10.02A General.--The quality characteristics to be evaluated, test methods, and specification limits are specified in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification. Asphalt content, aggregate gradation (No. 30 and No. 200), and relative compaction are considered for purposes of this specification to be critical quality characteristics.
A lot is a discrete quantity of work to which the statistical acceptance procedure is applied. For this contract, a lot represents the total quantity of asphalt concrete placed. More than one lot will occur if changes in the target values, material sources, or mix design are requested by the Contractor in writing and made in accordance with the requirements of this specification, or if production of asphalt concrete is terminated due to unsatisfactory material quality characteristics.
The frequency of sampling is specified in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification. Five samples is the minimum number of samples required to perform a statistical t-test evaluation. The maximum obtainable pay factor with 5 samples is 1.01. A minimum of 8 samples is required to obtain a 1.05 pay factor. If the sampling frequencies and quantity of work would otherwise result in fewer than 8 samples, the Contractor may submit a written request to increase the sampling frequency to provide for a minimum of 8 samples. The Contractor shall provide the Engineer with the request to increase the sampling frequency at least 48 hours before the beginning of asphalt concrete production.
The point of sampling is indicated in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification. The location of sampling shall be determined by a random method approved by the Engineer. The Engineer will obtain random samples for verification testing independent of the Contractor.
The work in the lot will be accepted and a final pay factor determined when all sampling, inspection and test data are completed and have been submitted, evaluated and approved by the Engineer. Contractor quality control test data shall be verified by the Engineer using the t-test as designated in Section 39-4.04, "Statistical Verification Tests," of this specification, before the data will be accepted by the Engineer.If the current composite pay factor of a lot is less than 1.00, the work represented by the lot will be accepted by the Engineer, provided the lowest single pay factor is not within the reject portion of Table 39-2, "Pay Factors," of this specification.
If the current composite pay factor of a lot is less than 1.00, and the lowest single pay factor is within the reject portion of Table 39-2, "Pay Factors," of this specification, the lot will be rejected. The Contractor shall remove all rejected material from the work, at the Contractor's expense.
If the current composite pay factor of a lot is less than 0.90, the Contractor shall terminate asphalt concrete production and the Engineer will terminate the lot. Production of asphalt concrete may resume after the Contractor takes necessary actions to improve the quality of the asphalt concrete product, and the proposed actions are approved in writing by the Engineer.
If any pay factor for a critical quality characteristic designated in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification, is less than 0.90 for the lot, or is within the rejection range for the last five tests, the Contractor shall terminate asphalt concrete production. Asphalt concrete production may resume after the Contractor takes necessary actions to improve the quality of the asphalt concrete product and the proposed actions are approved in writing by the Engineer. A new lot will be established when production resumes.
When approved in writing by the Engineer, the Contractor may voluntarily remove defective material and replace it with new material to avoid or minimize a pay factor of less than 1.00. New material will be sampled, tested, and evaluated for acceptance according to the requirements of this specification.
39-10.02B Statistical Evaluation.--The Variability-Unknown/Standard Deviation Method will be used to determine the estimated percentage of the lot that is outside specification limits. The number of significant figures used in the calculations will in accordance with the requirements of AASHTO Designation R-11, Absolute Method.
The estimated percentage of work that is outside of the specification limits for each quality characteristic will be determined as follows:
(1) Calculate the arithmetic mean (
)
of the test values;
= 
where: [Sigma] = summation of
x = individual test value
n = total number of test values
(2) Calculate the standard deviation (s);
s = 
where: [Sigma](x2) = summation of the squares of individual test values
([Sigma]x)2 = summation of the individual test values squared
(3) Calculate the upper quality index (Qu);
Qu = 
where: USL = upper specification limit
s = standard deviation
= arithmetic mean
(Note: The USL is equal to the contract specification limit or the target value plus the allowable deviation.)
(4) Calculate the lower quality index (QL);
QL = 
where: LSL = lower specification limit
s = standard deviation
= arithmetic mean
(Note: The LSL is equal to the contract specification limit or the target value minus the allowable deviation.)
(5) From Table 39-1 "Estimated Percent of Work Outside Specification Limits," of this specification, determine PU ;
where: PU = the estimated percentage of work outside the USL.
(PU corresponds to a given QU ; PU = 0, when USL is not specified.)
(6) From Table 39-1, "Estimated Percent of Work Outside Specification Limits," of this specification, determine PL;
where: PL = the estimated percentage of work outside the LSL.
(PL corresponds to a given QL ; PL = 0, when LSL is not specified.)
(7) Calculate the total estimated percentage of work outside the USL and LSL, Percent Defective;
(8) Repeat Steps 1 through 7 for each quality characteristic listed for acceptance.
39-10.02C Pay Factor Determination and Compensation Adjustment.--The pay factor and compensation adjustment for a lot will be determined as follows:
1. From Table 39-2, "Pay Factors," of this specification, determine the pay factor for each quality characteristic, (PFQC) using the total number of test data values and the total estimated percentage outside the specification limits (PU + PL) from Step 7 in Section 39-10.02B, "Statistical Evaluation," of this specification.
2. The pay factor for the lot is a composite of single pay factors determined for each quality characteristic designated in Table 39-3, "Minimum Quality Control Required for Acceptance," of this specification. The following formula is used:

w = the weighting factor listed in Table 39-3, and
i = the quality characteristic index number.
3. Payment to the Contractor for the lot of asphalt concrete will be subject to a compensation adjustment. The Compensation Adjustment Factor (CAF) will be determined as follows:
The amount of the compensation adjustment will be calculated as the product of: (1) the Compensation Adjustment Factor, (2) the total tonnes represented in the lot, and (3) the contract unit price per tonne for the contract item of asphalt involved. If the compensation adjustment is a negative value, the compensation adjustment will be deducted from any moneys due, or that may become due, the Contractor under the contract. If the compensation adjustment is a positive value, it will be added to any moneys due, or that may become due, the Contractor under the contract.
Estimated Percent
|
Upper Quality Index Qu or Lower Quality Index QL
|
||||||||||||
| Outside
Specification Limits
(Pu and/or PL)
|
n=5
|
n=6
|
n=7
|
n=8
|
n=9
|
n=10
to
n=11
|
n=12
to
n=14
| ||||||
| 0
|
1.72
|
1.88
|
1.99
|
2.07
|
2.13
|
2.20
|
2.28
| ||||||
| 1
|
1.64
|
1.75
|
1.82
|
1.88
|
1.91
|
1.96
|
2.01
| ||||||
| 2
|
1.58
|
1.66
|
1.72
|
1.75
|
1.78
|
1.81
|
1.84
| ||||||
| 3
|
1.52
|
1.59
|
1.63
|
1.66
|
1.68
|
1.71
|
1.73
| ||||||
| 4
|
1.47
|
1.52
|
1.56
|
1.58
|
1.60
|
1.62
|
1.64
| ||||||
| 5
|
1.42
|
1.47
|
1.49
|
1.51
|
1.52
|
1.54
|
1.55
| ||||||
| 6
|
1.38
|
1.41
|
1.43
|
1.45
|
1.46
|
1.47
|
1.48
| ||||||
| 7
|
1.33
|
1.36
|
1.38
|
1.39
|
1.40
|
1.41
|
1.41
| ||||||
| 8
|
1.29
|
1.31
|
1.33
|
1.33
|
1.34
|
1.35
|
1.35
| ||||||
| 9
|
1.25
|
1.27
|
1.28
|
1.28
|
1.29
|
1.29
|
1.30
| ||||||
| 10
|
1.21
|
1.23
|
1.23
|
1.24
|
1.24
|
1.24
|
1.25
| ||||||
| 11
|
1.18
|
1.18
|
1.19
|
1.19
|
1.19
|
1.19
|
1.20
| ||||||
| 12
|
1.14
|
1.14
|
1.15
|
1.15
|
1.15
|
1.15
|
1.15
| ||||||
| 13
|
1.10
|
1.10
|
1.10
|
1.10
|
1.10
|
1.10
|
1.11
| ||||||
| 14
|
1.07
|
1.07
|
1.07
|
1.06
|
1.06
|
1.06
|
1.06
| ||||||
| 15
|
1.03
|
1.03
|
1.03
|
1.03
|
1.02
|
1.02
|
1.02
| ||||||
| 16
|
1.00
|
0.99
|
0.99
|
0.99
|
0.99
|
0.98
|
0.98
| ||||||
| 17
|
0.97
|
0.96
|
0.95
|
0.95
|
0.95
|
0.95
|
0.94
| ||||||
| 18
|
0.93
|
0.92
|
0.92
|
0.92
|
0.91
|
0.91
|
0.91
| ||||||
| 19
|
0.90
|
0.89
|
0.88
|
0.88
|
0.88
|
0.87
|
0.87
| ||||||
| 20
|
0.87
|
0.86
|
0.85
|
0.85
|
0.84
|
0.84
|
0.84
| ||||||
| 21
|
0.84
|
0.82
|
0.82
|
0.81
|
0.81
|
0.81
|
0.80
| ||||||
| 22
|
0.81
|
0.79
|
0.79
|
0.78
|
0.78
|
0.77
|
0.77
| ||||||
| 23
|
0.77
|
0.76
|
0.75
|
0.75
|
0.74
|
0.74
|
0.74
| ||||||
| 24
|
0.74
|
0.73
|
0.72
|
0.72
|
0.71
|
0.71
|
0.70
| ||||||
| 25
|
0.71
|
0.70
|
0.69
|
0.69
|
0.68
|
0.68
|
0.67
| ||||||
| 26
|
0.68
|
0.67
|
0.67
|
0.65
|
0.65
|
0.65
|
0.64
| ||||||
| 27
|
0.65
|
0.64
|
0.63
|
0.62
|
0.62
|
0.62
|
0.61
| ||||||
| 28
|
0.62
|
0.61
|
0.60
|
0.59
|
0.59
|
0.59
|
0.58
| ||||||
| 29
|
0.59
|
0.58
|
0.57
|
0.57
|
0.56
|
0.56
|
0.55
| ||||||
| 30
|
0.56
|
0.55
|
0.54
|
0.54
|
0.53
|
0.53
|
0.52
| ||||||
| 31
|
0.53
|
0.52
|
0.51
|
0.51
|
0.50
|
0.50
|
0.50
| ||||||
| 32
|
0.50
|
0.49
|
0.48
|
0.48
|
0.48
|
0.47
|
0.47
| ||||||
| 33
|
0.47
|
0.48
|
0.45
|
0.45
|
0.45
|
0.44
|
0.44
| ||||||
| 34
|
0.45
|
0.43
|
0.43
|
0.42
|
0.42
|
0.42
|
0.41
| ||||||
| 35
|
0.42
|
0.40
|
0.40
|
0.39
|
0.39
|
0.39
|
0.38
| ||||||
| 36
|
0.39
|
0.38
|
0.37
|
0.37
|
0.36
|
0.36
|
0.36
| ||||||
| 37
|
0.36
|
0.35
|
0.34
|
0.34
|
0.34
|
0.33
|
0.33
| ||||||
| 38
|
0.33
|
0.32
|
0.32
|
0.31
|
0.31
|
0.31
|
0.30
| ||||||
| 39
|
0.30
|
0.30
|
0.29
|
0.28
|
0.28
|
0.28
|
0.28
| ||||||
| 40
|
0.28
|
0.25
|
0.25
|
0.25
|
0.25
|
0.25
|
0.25
| ||||||
| 41
|
0.25
|
0.23
|
0.23
|
0.23
|
0.23
|
0.23
|
0.23
| ||||||
| 42
|
0.23
|
0.20
|
0.20
|
0.20
|
0.20 < | ||||||||