PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/08/05 EST. NO.08 TIME 01:42 PM R.E. NAME: AMUTHASAKARAN, KAUSI 12-0H0024 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0035 1,383.44 E.W. @ F.A.(+) 031605 N 24 0 0036 1,573.55 022805 N 23 0 003 0001 162,664.58 E.W. @ L.S.(+) 031105 N 1 0 0002 39,942.00 E.W. @ U.P (+) 031105 N 2.0 0 004 0001 53,229.65 A.C. @ L.S.(+) 040705 N 1 0 258,793.22 TOTAL THIS ESTIMATE 45,912.47 TOTAL PREVIOUS ESTIMATE 304,705.69 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/08/05 EST. NO.08 TIME 01:42 PM R.E. NAME: AMUTHASAKARAN, KAUSI 12-0H0024 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/08/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H0024 TIME 01:42 PM ESTIMATE NO. 08 BID OPENING 09/23/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/16/05 R.E. NAME: AMUTHASAKARAN, KAUSI DATE OF THIS ESTIMATE 04/08/05 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 12-ORA-241-27.7/31.8 ---------------------------------- HIGHLAND CONSTRUCTION INC. IN ORANGE COUNTY ON STATE ROUTE 241 133 NORTH PIXLEY STREET FROM JUCTION 133 TO CHAPMAN ORANGE, CA 92868 SANTIAGO ROAD OVERCROSSING FED. AID NO. N O N E RESURFACE EXISTING HIGHWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM 02 WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 03 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 1.000 15,000.00 S) 04 TRAFFIC CONTROL SYSTEM LS 125,000.0000 125,000.00 1.000 125,000.00 S) 05 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,000.0000 5,000.00 1.000 5,000.00 S) 06 RECONSTRUCT CONCRETE BARRIER (TYPE K) M 20.0000 132,400.00 6,388.234 127,764.68 07 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 25.0000 5,500.00 317.800 7,945.00 S) (30 MM MAXIMUM) 08 ASPHALT CONCRETE (OPEN GRADED) TONN 70.0000 966,000.00 13,195.560 923,689.20 09 ASPHALTIC EMULSION (PAINT BINDER) TONN 1,500.0000 135,000.00 90.000 135,000.00 10 THERMOPLASTIC TRAFFIC STRIPE M 1.5000 39,750.00 26,539.000 39,808.50 S) 11 THERMOPLASTIC PAVEMENT MARKING M2 50.0000 1,200.00 35.200 1,760.00 S) 12 PAVEMENT MARKER (NON-REFLECTIVE) M 3.0000 17,580.00 5,420.000 16,260.00 S) 13 PAVEMENT MARKER (REFLECTIVE-SPECIAL M 0.1000 1,970.00 1,449.000 144.90 S) TYPE G) 14 PAVEMENT MARKER (REFLECTIVE-SPECIAL M 3.0000 5,430.00 865.000 2,595.00 S) TYPE H) 15 INDUCTIVE LOOP DETECTOR EA 600.0000 78,000.00 130.000 78,000.00 S) PROGRAM CAS145 PAGE 2 DATE 04/08/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 12-0H0024 TIME 01:42 PM ESTIMATE NO. 08 BID OPENING 09/23/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/16/05 R.E. NAME: AMUTHASAKARAN, KAUSI DATE OF THIS ESTIMATE 04/08/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 1,479,967.28 ADJUSTMENT OF COMPENSATION 53,229.65 53,229.65 EXTRA WORK 205,563.57 251,476.04 SUBTOTAL AMOUNT EARNED 258,793.22 1,784,672.97 ORIGINAL CONTRACT AMOUNT 1,529,830.00 TOTAL WORK COMPLETED 258,793.22 1,784,672.97 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 258,793.22 1,784,672.97 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/06/04 30 10/11/04 10/04/04 03/16/05 101 14 71 0 100% 100% AMUTHASAKARAN, KAUSI RESIDENT ENGINEER PROGRAM CAS145 DATE 04/08/05