PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/24/06 EST. NO.04 TIME 02:06 PM R.E. NAME: ARINDUQUE, RAY 11-263504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/24/06 EST. NO.04 TIME 02:06 PM R.E. NAME: ARINDUQUE, RAY 11-263504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION O/S PRS MAY -10,000.00 03 O/S PRS JUNE -10,000.00 04 -10,000.00 -20,000.00 OVERBID ITEMS OVERBID ITEM NO. 023 -3,475.05 02 OVERBID ITEM NO. 023 -1,158.35 03 0.00 -4,633.40 TOTAL DEDUCTIONS -10,000.00 -24,633.40 PROGRAM CAS145 PAGE 1 DATE 07/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-263504 TIME 02:06 PM ESTIMATE NO. 04 BID OPENING 02/16/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/06 R.E. NAME: ARINDUQUE, RAY DATE OF THIS ESTIMATE 07/24/06 LOCATION PROGRESS ESTIMATE 11-IMP-8-R96.2/R96.8 ----------------- 3-D ENTERPRISES, INC. IN IMPERIAL COUNTY AT WINTERHAVEN 2180-2C GARNET AVENUE FROM 0.5 KM WEST OF 4TH AVENUE SAN DIEGO,CA 92109 OVERCROSSING TO COLORADO RIVER VIADUCT FED. AID NO. ACST-008 -2(100)E ,PE-008 -2(100)E LANDSCAPING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 4,000.0000 4,000.00 0.250 1,000.00 1.000 4,000.00 S) PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 8,000.0000 8,000.00 1.000 8,000.00 1.000 8,000.00 03 TEMPORARY EROSION CONTROL M2 1.0000 16,100.00 0.000 0.00 04 TEMPORARY CONSTRUCTION ENTRANCE EA 2,000.0000 4,000.00 -0.020 -40.00 2.000 4,000.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 2,000.00 1.410 705.00 4.000 2,000.00 06 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 0.700 700.00 1.000 1,000.00 07 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.308 3,080.00 1.000 10,000.00 S) 08 CLEARING AND GRUBBING LS 15,000.0000 15,000.00 1.000 15,000.00 09 ROADWAY EXCAVATION M3 40.0000 44,000.00 1,100.000 44,000.00 10 PREPARE SLOPE M2 2.0000 19,120.00 732.900 1,465.80 9,704.000 19,408.00 11 ROCK MULCH (TYPE 1) M2 30.0000 900.00 3.000 90.00 33.000 990.00 12 ROCK MULCH (TYPE 2) M2 24.0000 146,640.00 1,753.420 42,082.08 6,543.420 157,042.08 13 ROCK MULCH (TYPE 3) M2 24.0000 169,200.00 702.420 16,858.08 7,747.420 185,938.08 14 ROCK MULCH (TYPE 4) M2 30.0000 3,300.00 26.300 789.00 128.300 3,849.00 15 SOIL STABILIZER M2 1.0000 7,130.00 7,053.690 7,053.69 7,053.690 7,053.69 16 ANTI-GRAFFITI PROTECTIVE COATING M2 100.0000 2,300.00 23.000 2,300.00 23.000 2,300.00 17 STEEL EDGING M 30.0000 43,200.00 20.000 600.00 1,432.600 42,978.00 18 ALUMINUM EDGING M 30.0000 3,300.00 110.000 3,300.00 19 MINOR CONCRETE (MISCELLANEOUS M3 2,000.0000 4,600.00 2.300 4,600.00 2.300 4,600.00 CONSTRUCTION) 20 MINOR CONCRETE M3 5,000.0000 15,000.00 3.100 15,500.00 (MISCELLANEOUS CONSTRUCTION) (FOOTING) 21 MINOR CONCRETE (TEXTURED PAVING) M2 4,000.0000 52,000.00 13.000 52,000.00 13.000 52,000.00 (GLASS PEBBLES) 22 MINOR CONCRETE (TEXTURED PAVING) (STAIN) M2 2,100.0000 48,300.00 10.000 21,000.00 10.000 21,000.00 PROGRAM CAS145 PAGE 2 DATE 07/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-263504 TIME 02:06 PM ESTIMATE NO. 04 BID OPENING 02/16/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/06 R.E. NAME: ARINDUQUE, RAY DATE OF THIS ESTIMATE 07/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 162,283.65 603,958.85 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 162,283.65 603,958.85 23 MOBILIZATION LS 73,936.0000 73,936.00 1.000 73,936.00 ORIGINAL CONTRACT AMOUNT 693,026.00 TOTAL WORK COMPLETED 162,283.65 677,894.85 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -10,000.00 -24,633.40 TOTAL 152,283.65 653,261.45 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 023 MOBILIZATION 69,302.60 73,936.00 4,633.40 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/24/06 65 04/10/06 04/10/06 08/01/06 71 1 0 0 97% 100% PROGRESS IS SATISFACTORY ARINDUQUE, RAY RESIDENT ENGINEER PROGRAM CAS145 PAGE 11 DATE 07/24/06