PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/21/08 EST. NO.04 TIME 06:24 PM R.E. NAME: ROGERS, JIM 02-0E3704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/21/08 EST. NO.04 TIME 06:24 PM R.E. NAME: ROGERS, JIM 02-0E3704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION PER LTR DATED 9/08 -8,000.00 02 PER LTR 10/08 -5,000.00 03 RTN 09/08 DEDUCT 8,000.00 03 PER 11/08 LTR -5,000.00 04 -5,000.00 -10,000.00 OVERBID ITEMS OVERBID ITEM NO. 024 -98,328.10 01 OVERBID ITEM NO. 024 -49,164.05 02 OVERBID ITEM NO. 024 -49,164.05 03 0.00 -196,656.20 TOTAL DEDUCTIONS -5,000.00 -206,656.20 PROGRAM CAS145 PAGE 1 DATE 11/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-0E3704 TIME 06:24 PM ESTIMATE NO. 04 BID OPENING 05/06/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/08 R.E. NAME: ROGERS, JIM DATE OF THIS ESTIMATE 11/21/08 LOCATION PROGRESS ESTIMATE 02-TEH-99-0.0/4.7 ----------------- PAVEMENT RECYCLING SYSTEMS INC IN TEHAMA AND RIVERSIDE COUNTIES ON P O BOX 1266 ROUTE 99 AND ROUTE 62 RIVERSIDE CA 92502 FED. AID NO. N O N E RECYCLE ASPHALT PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 DESERT TORTOISE PROTECTION LS 27,500.0000 27,500.00 0.000 0.00 S) 02 CONSTRUCTION SITE MANAGEMENT LS 25,000.0000 25,000.00 0.152 3,800.00 0.690 17,250.00 S) 03 PREPARE WATER POLLUTION CONTROL LS 15,000.0000 15,000.00 0.750 11,250.00 S) PROGRAM 04 STREET SWEEPING LS 50,000.0000 50,000.00 0.152 7,600.00 0.690 34,500.00 05 CONSTRUCTION AREA SIGNS LS 12,500.0000 12,500.00 0.192 2,400.00 1.000 12,500.00 S) 06 TRAFFIC CONTROL SYSTEM LS 150,000.0000 150,000.00 0.152 22,800.00 0.690 103,500.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,800.0000 12,600.00 0.152 273.60 0.690 1,242.00 S) 08 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.0000 21,300.00 105,310.000 105,310.00 S) 09 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 10 ASPHALTIC EMULSION (FOG SEAL COAT) TON 1,000.0000 15,000.00 3.500 3,500.00 11 REPLACE ASPHALT CONCRETE SURFACING CY 300.0000 348,000.00 1,161.500 348,450.00 12 HOT IN-PLACE TRANSFORMING SQYD 8.2000 1,558,000.00 20,293.780 166,409.00 13 FURNISH VIRGIN HOT MIX ASPHALT TON 145.0000 694,550.00 5,475.090 793,888.05 12,469.370 1,808,058.65 14 FURNISH RECYCLING AGENT TON 1,000.0000 49,000.00 1.980 1,980.00 15 THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 250.00 832.000 832.00 832.000 832.00 S) 16 THERMOPLASTIC PAVEMENT MARKING SQFT 5.2500 10,290.00 1,424.000 7,476.00 2,438.000 12,799.50 S) 17 THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 35,800.00 76,276.000 15,255.20 155,868.000 31,173.60 S) (SPRAYABLE) 18 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.5000 5,500.00 2,336.000 5,840.00 2,336.000 5,840.00 S) 19 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.2000 12,448.00 1,192.000 3,814.40 3,331.000 10,659.20 S) 20 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 8,800.0000 8,800.00 0.152 1,337.60 0.690 6,072.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION 21 INDUCTIVE LOOP DETECTOR EA 300.0000 8,400.00 28.000 8,400.00 28.000 8,400.00 S) 22 DETECTOR LOOP LS 10,000.0000 10,000.00 1.000 10,000.00 S) PROGRAM CAS145 PAGE 2 DATE 11/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-0E3704 TIME 06:24 PM ESTIMATE NO. 04 BID OPENING 05/06/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/08 R.E. NAME: ROGERS, JIM DATE OF THIS ESTIMATE 11/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MODIFY TRAFFIC MONITORING STATION LS 10,000.0000 10,000.00 1.000 10,000.00 S) (COUNT) PROGRAM CAS145 PAGE 3 DATE 11/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 02-0E3704 TIME 06:24 PM ESTIMATE NO. 04 BID OPENING 05/06/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/08 R.E. NAME: ROGERS, JIM DATE OF THIS ESTIMATE 11/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 873,716.85 2,712,225.95 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 873,716.85 2,712,225.95 24 MOBILIZATION LS 561,000.0000 561,000.00 1.000 561,000.00 ORIGINAL CONTRACT AMOUNT 3,643,438.00 TOTAL WORK COMPLETED 873,716.85 3,273,225.95 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -5,000.00 -206,656.20 TOTAL 868,716.85 3,066,569.75 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 024 MOBILIZATION 364,343.80 561,000.00 196,656.20 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/16/08 145 06/26/08 07/01/08 11/26/08 97 2 0 0 96% 67% PROGRESS IS SATISFACTORY ROGERS, JIM RESIDENT ENGINEER PROGRAM CAS145 DATE 11/21/08