PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/26/01 EST. NO.11 TIME 11:29 AM R.E. NAME: LAMBERT, ROD 01-230014 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001-1 -4,142.11 E.W. @ F.A.(+) 022201 Y JB 0 DAO CORRECTING ENTRY 0001-2 4,263.59 022201 Y JB 0 DAO CORRECTING ENTRY 0001-3 -4,263.59 022201 Y JB 0 DAO CORRECTING ENTRY 0001-4 3,984.66 022201 Y JB 0 DAO CORRECTING ENTRY 009 0001-1 -2,152.74 E.W. @ F.A.(+) 050901 N S3 DAO CORRECTING ENTRY 0001-2 2,303.43 050901 N S3 DAO CORRECTING ENTRY -6.76 TOTAL THIS ESTIMATE 96,196.31 TOTAL PREVIOUS ESTIMATE 96,189.55 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/26/01 EST. NO.11 TIME 11:29 AM R.E. NAME: LAMBERT, ROD 01-230014 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE RETENTION PROG SCHED -121,442.93 04 RET DEDCT PROG SCHD 121,442.93 05 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 11/26/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-230014 TIME 11:29 AM ESTIMATE NO. 11 BID OPENING 09/20/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/01 R.E. NAME: LAMBERT, ROD DATE OF THIS ESTIMATE 11/26/01 LOCATION PROGRESS ESTIMATE 01-LAK-29-9.4/9.9 ----------------- SHASTA CONSTRUCTORS INC IN LAKE COUNTY NEAR MIDDLETOWN FROM P O BOX 491539 0.5 KM SOUTH TO 0.2 KM NORTH OF REDDING CA 960491539 PUTAH CREEK BRIDGE FED. AID NO. ACST-P029(85)E ,P-P029(85)E BRIDGE REPLACEMENT (SCOUR) ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH) LS 12,000.0000 12,000.00 0.150 1,800.00 0.750 9,000.00 002 TIME-RELATED OVERHEAD WDAY 1,180.0000 507,400.00 22.000 25,960.00 164.000 193,520.00 003 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.950 4,750.00 (S) 004 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 0.050 1,250.00 0.380 9,500.00 (S) 005 TEMPORARY CREEK DIVERSION SYSTEM LS 70,000.0000 70,000.00 0.500 35,000.00 006 TEMPORARY PAVEMENT MARKING (PAINT) M2 36.0000 792.00 60.480 2,177.28 (S) 007 TEMPORARY PAVEMENT MARKING (TAPE) M2 95.0000 570.00 9.560 908.20 (S) 008 TEMPORARY TRAFFIC STRIPE (PAINT) M 1.0000 2,820.00 2,807.000 2,807.00 (S) 009 CHANNELIZER (SURFACE MOUNTED) EA 38.0000 5,320.00 120.000 4,560.00 (S) 010 TEMPORARY SIGNAL SYSTEM LS 100,000.0000 100,000.00 0.863 86,300.00 (S) 011 PORTABLE CHANGEABLE MESSAGE SIGN EA 10,000.0000 30,000.00 1.000 10,000.00 (S) 012 TEMPORARY SOLAR POWER FLASHING BEACON LS 15,000.0000 15,000.00 0.750 11,250.00 (S) SYSTEM 013 TEMPORARY RAILING (TYPE K) M 60.0000 25,200.00 421.000 25,260.00 (S) 014 TEMPORARY CRASH CUSHION MODULE EA 250.0000 5,500.00 22.000 5,500.00 (S) 015 REMOVE FENCE M 15.0000 4,200.00 117.000 1,755.00 016 REMOVE METAL BEAM GUARD RAILING M 56.0000 4,200.00 70.000 3,920.00 (S) 017 REMOVE FLARED END SECTION EA 200.0000 200.00 1.000 200.00 018 REMOVE ROADSIDE SIGN EA 100.0000 100.00 0.000 0.00 019 RESET ROADSIDE SIGN EA 200.0000 1,800.00 0.000 0.00 020 RELOCATE ROADSIDE SIGN EA 200.0000 600.00 0.000 0.00 021 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 5.5000 42,020.00 6,625.000 36,437.50 (S) 022 BRIDGE REMOVAL LS 115,000.0000 115,000.00 1.000 115,000.00 PROGRAM CAS145 PAGE 2 DATE 11/26/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-230014 TIME 11:29 AM ESTIMATE NO. 11 BID OPENING 09/20/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/01 R.E. NAME: LAMBERT, ROD DATE OF THIS ESTIMATE 11/26/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 CLEARING AND GRUBBING LS 9,000.0000 9,000.00 1.000 9,000.00 024 ROADWAY EXCAVATION M3 20.0000 73,000.00 3,484.800 69,696.00 025 STRUCTURE EXCAVATION (BRIDGE) M3 100.0000 42,900.00 485.300 48,530.00 (F) 026 STRUCTURE BACKFILL (BRIDGE) M3 80.0000 16,000.00 77.210 6,176.80 (F) 027 IMPORTED BORROW M3 12.0000 63,120.00 3,385.000 40,620.00 028 STRAW (EROSION CONTROL) TONN 450.0000 1,125.00 1.300 585.00 (S) 029 FIBER (EROSION CONTROL) KG 1.0000 630.00 325.200 325.20 (S) 030 COMPOST (EROSION CONTROL) KG 1.0000 1,880.00 975.600 975.60 (S) 031 PURE LIVE SEED (EROSION CONTROL) KG 75.0000 3,225.00 22.280 1,671.00 (S) 032 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 1.0000 160.00 81.300 81.30 (S) 033 STABILIZING EMULSION (EROSION CONTROL) KG 2.0000 260.00 65.040 130.08 (S) 034 CLASS 2 AGGREGATE BASE M3 55.0000 69,300.00 616.280 33,895.40 035 ASPHALT CONCRETE (TYPE A) TONN 75.0000 156,000.00 131.500 9,862.50 036 ASPHALT CONCRETE (OPEN GRADED) TONN 105.0000 52,500.00 0.000 0.00 037 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 150.0000 2,700.00 0.000 0.00 AREA) 038 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 15.0000 2,700.00 0.000 0.00 039 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 15.0000 345.00 0.000 0.00 040 FURNISH STEEL PILING (HP 360 X 132) M 45.0000 30,825.00 17.120 770.40 302.570 13,615.65 041 DRIVE STEEL PILE (HP 360 X 132) EA 2,000.0000 96,000.00 28.000 56,000.00 48.000 96,000.00 (S) 042 FURNISH STEEL PIPE PILING (610 MM) M 100.0000 10,500.00 118.000 11,800.00 043 DRIVE STEEL PIPE PILE (610 MM) EA 6,000.0000 24,000.00 4.000 24,000.00 (S) 044 FURNISH CAST-IN-STEEL-SHELL CONCRETE M 800.0000 268,000.00 190.170 152,136.00 PILING (1524 MM) 045 DRIVE CAST-IN-STEEL-SHELL CONCRETE EA 102,000.0000 918,000.00 5.000 510,000.00 (S) PILE (1524 MM) 046 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 400.0000 34,800.00 50.520 20,208.00 87.000 34,800.00 047 STRUCTURAL CONCRETE, BRIDGE M3 500.0000 610,000.00 499.480 249,740.00 (F) 048 STRUCTURAL CONCRETE, APPROACH SLAB M3 600.0000 59,400.00 41.000 24,600.00 (F) (TYPE N) 049 JOINT SEAL (MR 50 MM) M 240.0000 9,120.00 0.000 0.00 (S) PROGRAM CAS145 PAGE 3 DATE 11/26/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-230014 TIME 11:29 AM ESTIMATE NO. 11 BID OPENING 09/20/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/01 R.E. NAME: LAMBERT, ROD DATE OF THIS ESTIMATE 11/26/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 BAR REINFORCING STEEL (BRIDGE) KG 1.5000 540,411.00 91.950 137.93 149,295.540 223,943.31 (SF) 051 450 MM CORRUGATED STEEL PIPE M 550.0000 2,750.00 5.000 2,750.00 (2.77 MM THICK) 052 450 MM STEEL FLARED END SECTION EA 300.0000 300.00 1.000 300.00 053 ROCK SLOPE PROTECTION (1/2T, METHOD A) M3 70.0000 281,400.00 1,860.000 130,200.00 2,260.000 158,200.00 054 ROCK SLOPE PROTECTION M3 70.0000 84,700.00 224.000 15,680.00 398.000 27,860.00 (BACKING NO. 1, METHOD B) 055 ROCK SLOPE PROTECTION FABRIC M2 2.0000 5,880.00 1,096.000 2,192.00 1,519.000 3,038.00 056 MISCELLANEOUS METAL (BRIDGE) KG 4.0000 9,348.00 0.000 0.00 (SF) 057 FENCE (TYPE WM, WOOD POST) M 25.0000 7,000.00 0.000 0.00 058 DELINEATOR (CLASS 2) EA 28.0000 392.00 7.000 196.00 059 MARKER (CULVERT) EA 35.0000 70.00 0.000 0.00 060 OBJECT MARKER (TYPE L-1) EA 35.0000 140.00 0.000 0.00 061 METAL BEAM GUARD RAILING (WOOD POST) M 97.0000 3,007.00 15.000 1,455.00 (S) 062 CONCRETE BARRIER (TYPE 25) M 150.0000 40,500.00 136.000 20,400.00 (F) 063 TERMINAL SECTION (TYPE B) EA 100.0000 200.00 2.000 200.00 (S) 064 END SECTION EA 100.0000 200.00 0.000 0.00 (S) 065 TERMINAL SYSTEM (TYPE SRT) EA 2,500.0000 10,000.00 2.000 5,000.00 (S) 066 THERMOPLASTIC PAVEMENT MARKING M2 39.0000 3,159.00 0.000 0.00 (S) 067 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 7,680.00 0.000 0.00 (S) 068 200 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 1,240.00 0.000 0.00 (S) 069 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 260.00 0.000 0.00 (S) (BROKEN 3.66 M - 0.92 M) 070 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 30.00 0.000 0.00 (S) (BROKEN 10.98 M - 3.66 M) 071 PAVEMENT MARKER (RETROREFLECTIVE- EA 15.0000 2,700.00 11.000 165.00 (S) RECESSED) PROGRAM CAS145 PAGE 4 DATE 11/26/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 01-230014 TIME 11:29 AM ESTIMATE NO. 11 BID OPENING 09/20/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/01 R.E. NAME: LAMBERT, ROD DATE OF THIS ESTIMATE 11/26/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 254,198.33 2,339,592.82 ADJUSTMENT OF COMPENSATION 0.00 19,895.57 EXTRA WORK -6.76 76,293.98 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 254,191.57 2,435,782.37 072 MOBILIZATION LS 500,000.0000 500,000.00 0.050 25,000.00 1.000 500,000.00 ORIGINAL CONTRACT AMOUNT 5,029,579.00 TOTAL WORK COMPLETED 279,191.57 2,935,782.37 MATERIALS ON HAND ON SITE 92,072.42 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 279,191.57 3,027,854.79 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/23/00 430 02/08/01 11/17/00 12/26/02 161 97 0 0 56% 37% PROGRESS IS SATISFACTORY LAMBERT, ROD RESIDENT ENGINEER PROGRAM CAS145 DATE 11/26/01