Olancha/Cartago Roadway Improvement Project
Inyo County - Highway 395 - Post Mile 31.2 to 41.4

Project Location:
 

The project is located on U.S. Highway 395 in Inyo County.  The project limits extend from 3.8 miles south of Olancha to 3.5 miles north of Cartago.

Click on the highlighted links below to view.  After viewing, click the "Back" button on your browser to return to this page.

Project Description:

Caltrans developed this project through the Two- and Three-Lane Highway Monitoring Program to implement cost effective safety improvements from 0.6 mile north of North Haiwee Road to 2.5 miles south of Ash Creek Road - the remaining section of two-lane highway. The project will make improvements to the two-lane highway until the ultimate facility, four-lanes (Olancha/ Cartago Four-Lane), can be realized.

The project includes widening the existing four-foot shoulders to eight-feet, placing rumble strips along each shoulder, and placing rumble strip along the centerline in locations where the highway is striped as no passing.

 Project Status:

The project is in the Final Design (How A Project Gets Built) phase, and design of the selected alternative is in progress.

Estimated total project cost (support and capital)
$5,777,000.00
Date Environmental Document approved
March 12, 2004
Date that project alternative and Project approved (PA&ED)
April 22, 2004
Estimated beginning of construction date (Approve Contract)
spring 2006
Estimated completion of construction date (Contract Acceptance)
winter 2006

For more details please see Project Status.

Project Funding:

This project was identified through the Two- and Three-Lane Highway Monitoring Program and programmed in the 2004 State Highway Operation and Protection Program (SHOPP).

Project Information:

Map:  Project Location
Project photo:  existing highway
Project photo (enhanced):  proposed highway

Project Manager:

Bryan Winzenread
500 S. Main Street
Bishop, CA 93514
760-872-5250
Email: Bryan_Winzenread@dot.ca.gov