California Department of Transportation
 

Olancha/Cartago Four-Lane

Olancha/Cartago Four-Lane Project
Inyo County - Highway 395 - Post Mile 30.8 to 41.8

Project Location:

This project is located on U.S. Highway 395 in Inyo County.   The project limits extend from 4.2 miles south of Olancha to 3.9 miles north of Cartago.

Click on the highlighted links below to view.  After viewing, click the "Back" button on your browser to return to this page.

Project Description:

This project will upgrade 11.0 miles of the existing two-lane conventional highway to four-lanes in and near Olancha and Cartago from 0.2 mile north of North Haiwee Road to 1.8 miles south of Ash Creek Road.   It will close the gap in existing four-lane sections to the south and north.

Project Status:

The project is in the Environmental and Design Studies (How A Project Gets Built) phase.   In this phase, the impacts that the proposed project alternatives will have on the environment are studied and documented.   Due to the current fiscal environment of the State, and a reduction of available funds in the 2004 State Transportation Improvement Program (STIP), work on this project has been suspended.   In the next funding cycle, the 2006 STIP, it is anticipated that funds will be programmed on the project, allowing work to resume (the schedule shown below is dependent on the future availability of funds).

Estimated total project cost (support and capital)
$89,643,000
Current Project Phase
Environmental & Design Studies
Estimated Date of Current Phase Completion
early 2015
Estimated Date to Begin Construction
late 2018
Estimated Date of Construction Completion
late 2021

Due to the delay of the Olancha/Cartago Four-Lane project, a interim project (Olancha/ Cartago Roadway Improvements) was developed through the Two- and Three-Lane Highway Monitoring Program in the State Highway Operations and Protection Program (SHOPP) to implement safety improvements on the remaining section of two-lane highway. The safety project includes widening the existing four-foot shoulders to eight-feet along each side of the two-lane highway.

For more details please see Project Status.

Project Information:

Project Alternative Descriptions
Map:   Project Alternatives
Map:   Alternative 1
Map:   Alternative 2
Map:   Alternative 2a
Map:   Alternative 3
Map:   Alternative 3a

Project Manager:

Bryan Winzenread
500 S. Main Street
Bishop, CA 93514
760-872-5250
Email: Bryan_Winzenread@dot.ca.gov