The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.


Q1) can you give me a list of manufacturers of the steel bench that meet the requirments of this contract? does the bench have to have the horizontal slats made out of half round bar or can the slats be flat steel slats?

A1) Bid as shown on the specifications and plans. 2Apr10.


Q2) the horizontal seat straps for the steel bench are shown to be 5/8" dia half round steel bar. would 5/8" dia. full round bar be allowed?

A2) Bid as shown on the specifications and plans. 2Apr10


Q3) Please confirm that all 2"x wood trim, interior and exterior is existing as shown in 3/A5-3.

A3) Bid per the current contract bid documents.12Apr10


Q4) Plans call for new Electroliers and other electrical work not related to the buildings. There is no bid item for this work. How will this work be paid for?

A4) Bid item #62, Building work, includes payment for electroliers and other electrical work shown on the electrical (EE) plans. Reference the first paragraph in Section 12-1.09, "Measurement and Payment," on page 127 of the special provisions. 12Apr10


Q5) I can not find the light fixture schedule for this project. Sheet EE0.12 shows the Electrolier Details. This sheet only describes the foundation details.

A5) See Section 12-16.05, "LIGHTING," on pages 278-280 of the contract special provisions. 13Apr10


Q6)Need the light fixture schedule for the buildings.

A6) See Section 12-16.05, "LIGHTING," on pages 278-280 of the contract special provisions. 13Apr10


Q7) I see a lot of wood signs on this project, but no precast. Please refer to pages in plans for; PRECAST CONCRETE ENTRANCE SIGN,PRECAST CONCRETE SITE SIGN (SINGLE SIGN),PRECAST CONCRETE SITE SIGN (DOUBLE SIGN),PRECAST CONCRETE SITE SIGN (TRIPLE SIGN)PRECAST CONCRETE SITE SIGN (QUAD SIGN)

A7) Refer to Speccial Provisions Section 10-4 Precast Concrete Products, paragraphs for Precast Concrete Entrance Sign and Precast Concrete Site Sign Plans. 8Apr10


Q8)Sheet SS-5 of the plans, show 3 new Aerators. There is no pay item for this work. How will this be paid?

A8) Bid item #62, Building work, includes payment for aerators. Reference the first paragraph in Section 12-1.09, "Measurement and Payment," on page 127 of the contract special provisions. 12Apr10


Q9)Sheet SS-11 of the plans show 2- 8000 gallon water storage tanks being installed. There is no pay item for this. How will this be paid?

A9) Bid item #62, Building work, includes payment for water storage tanks. Reference the first paragraph in Section 12-1.09, "Measurement and Payment," on page 127 of the contract special provisions.12Apr10


Q10) There is extensive electrical work involved in the new aerators as well as the equipment for the Sanitary Stations. There is no pay item for this work. How will this be paid?

A10) Bid item #62, Building work, includes payment for all electrical work for new aerators and sanitary stations. Reference the first paragraph in Section 12-1.09, "Measurement and Payment," on page 127 of the contract special provisions. 12Apr10