Contract 05-010504
The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.
Q) The detail on page 3 of 6 of the drawings indicates that the bottom portion of the concrete that the monument actually is embedded in is to be left in place. Does this mean that these are existing and we do not have to raise this portion of the monuments, that it stays in place? Do we only have to raise the cover up 30mm to accommodate for the overlay?
A) No, the Non-Metallic Form Tubes are not existing and are part of constructing the survey monuments.
Q) Do we have to install the monument including the bottom portion of the concrete in its entirety?
A) Yes
Q) Are all the monuments actually existing? If some are existing and some are new how many of each are there?
A) The 30 each survey monuments will be new construction.