Welcome to Caltrans District 4
D4 Icon

Menu

PHOTOGRAPHY DESK
510-286-6179

Staff:
  • Bill Hall
    Senior Photographer
    510-286-5311
  • John Huseby
    Senior Photographer
    510-286-5323
  • Isaac Garcia
    Office Tech
    510-286-6179


Visitors Since 6/6/08

Right Column

District 4 Photography | New Staff Phone Numbers!

District 4 Photography | May 2012

Click to View
Public Order Forms
Internal (Caltrans) Order Forms
Our Mission:
  • Provide professional still photographic services to Caltrans and stock photographic images to the general public in a timely manner.
  • Digital still photography of Caltrans District 4 projects. This includes transportation systems and facilities, oblique aerial files and historic images maintained in our office Room 12-325, 111 Grand Avenue, Oakland.
  • Orders for District 4 Photographic Services can be requested via Order Shoot, and Order Digital Files order forms.
  • Caltrans photo galleries 2008 and earlier are posted in the Gallery Archives photo gallery


Click above player or HERE for RealPlayer Real Player

Photography Gallery 2012

_9873d021_small.jpg 12_10256d SF101 Aerials, Doyle Drive Detour 04/29/12
12_10256d SF101 Aerials, Doyle Drive Detour 04/29/12
_9873d021_small.jpg 12_10250_52d SF101 Doyle Drive Demo Compilation 04/27-29/12
12_10250_52d SF101 Doyle Drive Demo Compilation 04/27-29/12
_9873d021_small.jpg 12_10254d SF101 SF Demo of Doyle Drive 04/28/12
12_10254d SF101 SF Demo of Doyle Drive 04/28/12
_9873d021_small.jpg 12_102853d Doyle Drive Demo Aerials 0630Hours 04/28/12
12_10253d Doyle Drive Demo Aerials 0630Hours 04/28/12
_9873d021_small.jpg 12_10246d Sol101 Petaluma Aerials, 101 to 37 to Wilfred in Rohnert Park 04/24/12
12_10246d Sol101 Petaluma Aerials, 101 to 37 to Wilfred in Rohnert Park 04/24/12
_9873d021_small.jpg 12_10245d SF101 Aerials Pre Demo and Traffic Detour 04/24/12
12_10245d SF101 Aerials Pre Demo and Traffic Detour 04/24/12
_9873d021_small.jpg 12_10247d SON128 Geyserville, Russian River Bridge 04/24/12
12_10247d SON128 Geyserville, Russian River Bridge 04/24/12
_9873d021_small.jpg 12_10248d Napa12 Aerials, HWY 29 to 80 04/23/12
12_10248d Napa12 Aerials, HWY 29 to 80 04/23/12
_9873d021_small.jpg 12_10243d SF80 YBI Cable Compaction 04/23/12
12_10243d SF80 YBI Cable Compaction 04/23/12
_9873d021_small.jpg 12_10242d SF101 Equip-Delivery Staging for Demo 04/23/12
12_10242d SF101 Equip-Delivery Staging for Demo 04/23/12
_9873d021_small.jpg 12_10232_34d SF1 Devils Slide S_B Last Concrete Roadway Pour 04/20/12
12_10232_34d SF1 Devils Slide S_B Last Concrete Roadway Pour 04/20/12
_9873d021_small.jpg 12_10240d SOL80 Cordelia Groundbreaking Ceremony 04/20/12
12_10240d SOL80 Cordelia Groundbreaking Ceremony 04/20/12
_9873d021_small.jpg 12_10238d SF101 Fire System Testing Tunnel 04/19/12
12_10238d SF101 Fire System Testing Tunnel 04/19/12
_9873d021_small.jpg 12_10237d SF101 Doyle Drive Tunnel Demo 04/19/12
12_10237d SF101 Doyle Drive Tunnel Demo 04/19/12
_9873d021_small.jpg 12_10239d SF101 Asbestos Removal Prior to Demo Sidewalk 04/19/12
12_10239d SF101 Asbestos Removal Prior to Demo Sidewalk 04/19/12
_9873d021_small.jpg 12_10230d SF80 YBI Transition Structure 04/16/12
12_10230d SF80 YBI Transition Structure 04/16/12
_9873d021_small.jpg 12_10229d SF80 YBI Start Cable Compact SAS 04/16/12
12_10229d SF80 YBI Start Cable Compact SAS 04/16/12
_9873d021_small.jpg 12_10219d ALA24 Oakland Caldecott 4th Bore Waterproofing 04/09/12
12_10219d ALA24 Oakland Caldecott 4th Bore Waterproofing 04/09/12
_9873d021_small.jpg 12_10218d Antioch Bridge Last Bearing Pier 41 04/09/12
12_10218d Antioch Bridge Last Bearing Pier 41 04/09/12
_9873d021_small.jpg 12_10231d CC4 Antioch Bridge Retrofit Ceremony 04/09/12
12_10231d CC4 Antioch Bridge Retrofit Ceremony 04/09/12
_9873d021_small.jpg 12_10221d SF80 YBI Saddle Compl. All 137 Strands in Place 04/06/12
12_10221d SF80 YBI Saddle Compl. All 137 Strands in Place 04/06/12
_9873d021_small.jpg 12_10216_17d SF101 Erosion Control Barrier 04/06/12
12_10216_17d SF101 Erosion Control Barrier 04/06/12
_9873d021_small.jpg 12_10215d 80 YBI Last Strand 137 Pulled Wire Splicing 04/05/12
12_10215d 80 YBI Last Strand 137 Pulled Wire Splicing 04/05/12
_9873d021_small.jpg 12_10214d 80 YBI Cable Strand Install to 134 04/04/12
12_10214d 80 YBI Cable Strand Install to 134 04/04/12
_9873d021_small.jpg 12_10213d ALA80 Oakland Demo of WB 80 East Span 04/04/12
12_10213d ALA80 Oakland Demo of WB 80 East Span 04/04/12
_9873d021_small.jpg 12_10212d ALA880 Oakland Aerials 5th and High Street 04/04/12
12_10212d ALA880 Oakland Aerials 5th and High Street 04/04/12
_9873d021_small.jpg 12_10211d SF101 Aerials Doyle Drive 04/04/12
12_10211d SF101 Aerials Doyle Drive 04/04/12
_9873d021_small.jpg 12_10210d ALA80 Oakland Touchdown Aerials 04/04/12
12_10210d ALA80 Oakland Touchdown Aerials 04/04/12
_9873d021_small.jpg 12_10209d SF80 YBI Aerials YBITS and SAs 04/04/12
12_10209d SF80 YBI Aerials YBITS and SAs 04/04/12
_9873d021_small.jpg 12_10208d SM1 Pacifica Aerials Devils Slide Project 04/04/12
12_10208d SM1 Pacifica Aerials Devils Slide Project 04/04/12
_9873d021_small.jpg 12_10206d ALA880 Oakland High Street Rebar Cage 2nd Lift Install 04/04/12
12_10206d ALA880 Oakland High Street Rebar Cage 2nd Lift Install 04/04/12
_9873d021_small.jpg 12-10207d Napa12 Fairfield Jamison Canyon Groundbreaking 04/04/12
12-10207d Napa12 Fairfield Jamison Canyon Groundbreaking 04/04/12
_9873d021_small.jpg 12_10203d CC4 Antioch @ Loveridge Rd Overviews 04/02/12
12_10203d CC4 Antioch @ Loveridge Rd Overviews 04/02/12
_9873d021_small.jpg 12-10200d Ala580 Livermore Isabel Interchange Ribbon Cutting 03/30/12
12-10200d Ala580 Livermore Isabel Interchange Ribbon Cutting 03/30/12
_9873d021_small.jpg 12_10201d SF80 Yerba Buena Island, Storm Water Controls 03/29/12
12_10201d SF80 Yerba Buena Island, Storm Water Controls 03/29/12
_9873d021_small.jpg 12_10198d SF80 YBI SAS Cable 121 of 137 Catwalk 03/29/12
12_10198d SF80 YBI SAS Cable 121 of 137 Catwalk 03/29/12
_9873d021_small.jpg 12_10196d SF101 Doyle Drive Project 03/25/12
12_10196d SF101 Doyle Drive Project 03/28/12
_9873d021_small.jpg 12_10197d SF80 Yerba Buena Island Transition Structure EB Falsework 03/28/12
12_10197d SF80 Yerba Buena Island Transition Structure EB Falsework 03/28/12
_9873d021_small.jpg 12-10193d Ala84 Newark Dumbarton Bridge Retrofit, Styrofoam Block Pier 23 03/26/12
12-10193d Ala84 Newark Dumbarton Bridge Retrofit, Styrofoam Block Pier 23 03/26/12
_9873d021_small.jpg 12-10186d Ala880 Oakland 5th Ave Overcrossing Pile Welding 03/22/12
12-10186d Ala880 Oakland 5th Ave Overcrossing Pile Welding 03/22/12
_9873d021_small.jpg 12_10187d Ala880 Oakland High Street CIDH Rebar Cage Concrete Pour 03/22/12
12_10187d Ala880 Oakland High Street CIDH Rebar Cage Concrete Pour 03/22/12
_9873d021_small.jpg 12_10190d 80 YBI Transition Structure 03/22/12
12_10190d 80 YBI Transition Structure 03/22/12
_9873d021_small.jpg 12_10189d SF80 YBI SAS Cable Install 03/22/12
12_10189d SF80 YBI SAS Cable Install 03/22/12
_9873d021_small.jpg 12_10183d Ala880 Oakland High Street Overviews 03/20/12
12_10183d Ala880 Oakland High Street Overviews 03/20/12
_9873d021_small.jpg 12_10188d ALA80 Oakland Cable Wrapping Equip Test Pier 7 03/21/12
12_10188d ALA80 Oakland Cable Wrapping Equip Test Pier 7 03/21/12
_9873d021_small.jpg 12_10178d ALA880 Oakland D.O. Persian New Years Celebration 03/15/12
12_10178d ALA880 Oakland D.O. Persian New Years Celebration 03/15/12
_9873d021_small.jpg 12_10169d SCL101 Menlo Park Widening Retaining Wall Pour 03/12/12
12_10169d SCL101 Menlo Park Widening Retaining Wall Pour 03/12/12
_9873d021_small.jpg 12_10182d ALA80 Oakland New Admin Building Ribbon Cut 03/19/12
12_10182d ALA80 Oakland New Admin Building Ribbon Cut 03/19/12
_9873d021_small.jpg 12_10168d SCL101 San Jose Tully Rd. Overcrossing Painted Onramps 03/12/12
12_10168d SCL101 San Jose Tully Rd. Overcrossing Painted Onramps 03/12/12
_9873d021_small.jpg 12_10171d MRN101 Novato 101 Widening and HOV Addition 03/09/12
12_10171d MRN101 Novato 101 Widening and HOV Addition 03/09/12
_9873d021_small.jpg 12_10172d SON101 Petaluma Washington St., New North Bound Ramp 03/09/12
12_10172d SON101 Petaluma Washington St., New North Bound Ramp 03/09/12
_9873d021_small.jpg 12_10173d SON101 Petaluma Widening to Cotati 03/09/12
12_10173d SON101 Petaluma Widening to Cotati 03/09/12
_9873d021_small.jpg 12_10167d CC4 Antioch Widening, Contra Loma Groundbreaking 03/09/12
12_10167d CC4 Antioch Widening, Contra Loma Groundbreaking 03/09/12
_9873d021_small.jpg 12_10164d CC4 Pittsburgh Aerials S Whipple Loveridge to Bypass 03/07/12
12_10164d CC4 Pittsburgh Aerials S Whipple Loveridge to Bypass 03/07/12
_9873d021_small.jpg 12_10163d ALA24 Oakland Caldecott Aerials 03/07/12
12_10163d ALA24 Oakland Caldecott Aerials 03/07/12
_9873d021_small.jpg 12_10161d SM1 Pacifica Aerials, Devils Slide 03/07/12
12_10161d SM1 Pacifica Aerials, Devils Slide 03/07/12
_9873d021_small.jpg 12_10160d SON116 Safety Improvements 03/06/12
12_10160d SON116 Safety Improvements 03/06/12
_9873d021_small.jpg 12_10159d Napa12 Completed Safety Improvements 03/06/12
12_10159d Napa12 Completed Safety Improvements 03/06/12
_9873d021_small.jpg 12_10158d SOL80 Fairfield EB80 Truck Scales Signage 03/06/12
12_10158d SOL80 Fairfield EB80 Truck Scales Signage 03/06/12
_9873d021_small.jpg 12_10155d SF80 YBI EB False Work 03/05/1212_10157d CC4 Antioch Widening Soundwall Install 03/05/12
12_10155d SF80 YBI EB False Work 03/05/12
_9873d021_small.jpg 12_10157d CC4 Antioch Widening Soundwall Install 03/05/12
12_10157d CC4 Antioch Widening Soundwall Install 03/05/12
_9873d021_small.jpg 12_10154d SF80 YBI Main Cable 79 03/05/12
12_10154d SF80 YBI Main Cable 79 03/05/12
_9873d021_small.jpg 12_10156d CC4 Antioch Widening Deck Pour, Loveridge Rd 03/05/12
12_10156d CC4 Antioch Widening Deck Pour, Loveridge Rd 03/05/12
_9873d021_small.jpg 12_10150d ALA880 Oakland D.O. Activity 03/02/12
12_10150d ALA880 Oakland D.O. Activity 03/02/12
_9873d021_small.jpg 12_10151d SF101 Installation of VMS Sign 03/02/12
12_10151d SF101 Installation of VMS Sign 03/02/12
_9873d021_small.jpg 12_1044d SF80 YBI Cable Measuring 02/28/12
12_1044d SF80 YBI Cable Measuring 02/28/12
_9873d021_small.jpg 12_10145d ALA880 Oakland High Street Concrete Abutment Pour 02/28/12
12_10145d ALA880 Oakland High Street Concrete Abutment Pour 02/28/12
_9873d021_small.jpg 12_10146d ALA24 Oakland Caldecott Tunnel Overviews 02/28/12
12_10146d ALA24 Oakland Caldecott Tunnel Overviews 02/28/12
_9873d021_small.jpg 12_10143d SOL12 Fairfield Widening to Napa 02/27/12
12_10143d SOL12 Fairfield Widening to Napa 02/27/12
_9873d021_small.jpg 12_10141_42d SF101 Doyle Drive New Lighting and Burlap 02/24/12
12_10141_42d SF101 Doyle Drive New Lighting and Burlap 02/24/12
_9873d021_small.jpg 12_10140d SF80 YBI SAS Main Cable to 57 02/23/12
12_10140d SF80 YBI SAS Main Cable to 57 02/23/12
_9873d021_small.jpg 12_10136 ALA80 Oakland OTD II Detour Tuesday Morning 02/22/12
12_10136 ALA80 Oakland OTD II Detour Tuesday Morning 02/22/12
_9873d021_small.jpg 12_10130d Ala80 Oakland Aerials Touchdown Toll Plaza 02/20/12
12_10130d Ala80 Oakland Aerials Touchdown Toll Plaza 02/20/12
_9873d021_small.jpg 12_10131d Ala880 Oakland Aerials 5th Ave and High Street 02/20/12
12_10131d Ala880 Oakland Aerials 5th Ave and High Street 02/20/12
_9873d021_small.jpg 12_10133d ALA80 Oakland, Opening to Traffic 02/19/12
12_10133d ALA80 Oakland, Opening to Traffic 02/19/12
_9873d021_small.jpg 12_10127d ALA80 Oakland Aerials Toll Bridge Post Demo Steel Supports 02/19/12
12_10127d ALA80 Oakland Aerials Toll Bridge Post Demo Steel Supports 02/19/12
_9873d021_small.jpg 12_10129d SF80 YBI East Span Views Upper Deck 02/19/12
12_10129d SF80 YBI East Span Views Upper Deck 02/19/12
_9873d021_small.jpg 12_10134d Ala80 Oakland Aerials OTDII Detour Before Opening with Striping 02/19/12
12_10134d Ala80 Oakland Aerials OTDII Detour Before Opening with Striping 02/19/12
_9873d021_small.jpg 12_10114d ALA80 Oakland Touchdown Detour, K-Rail 02/19/12
12_10114d ALA80 Oakland Touchdown Detour, K-Rail 02/19/12
_9873d021_small.jpg 12_10123d Ala80 Oakland Aerials Touchdown 02/18/12
12_10123d Ala80 Oakland Aerials Touchdown 02/18/12
_9873d021_small.jpg 12_10125d Ala80 Oakland OTD Work Evening Paving Demo BATA 02/18/12
12_10125d Ala80 Oakland OTD Work Evening Paving Demo BATA 02/18/12
_9873d021_small.jpg 12_10124d ALA80 Oakland Aerials Upper Deck Full Closure 02/18/12
12_10124d ALA80 Oakland Aerials Upper Deck Full Closure 02/18/12
_9873d021_small.jpg 12_10128d ALA80 Oakland Aerials 2700ft OTD to Marina Grand 02/18/12
12_10128d ALA80 Oakland Aerials 2700ft OTD to Marina Grand 02/18/12
_9873d021_small.jpg 12_10112 12_10113 ALA80 Oakland Touchdown Detour, Methacrylate Paving Press 02/18/12
12_10112 12_10113 ALA80 Oakland Touchdown Detour, Methacrylate Paving Press 02/18/12
_9873d021_small.jpg 12_10120d Ala80 Oakland OTD Detour Work Friday Night 02/17/12
12_10120d Ala80 Oakland OTD Detour Work Friday Night 02/17/12
_9873d021_small.jpg 12_10117d ALA80 YBI SAS Transition Aerials 02/17/12
12_10117d ALA80 YBI SAS Transition Aerials 02/17/12
_9873d021_small.jpg 12_10107d ALA80 Oakland Touchdown Detour Work 02/14/12
12_10107d ALA80 Oakland Touchdown Detour Work 02/14/12
_9873d021_small.jpg 12_10108d ALA80 Oakland Cable Compaction Pier 7 02/14/12
12_10108d ALA80 Oakland Cable Compaction Pier 7 02/14/12
_9873d021_small.jpg 12_10101d CC4 Brentwood Hwy4 Bypass Transfer Relinquishment Ceremony 02/13/12
12_10101d CC4 Brentwood Hwy4 Bypass Transfer Relinquishment Ceremony 02/13/12
_9873d021_small.jpg 12_10103d SF80 Rincon Hill Dog Park Opening 02/11/12
12_10103d SF80 Rincon Hill Dog Park Opening 02/11/12
_9873d021_small.jpg 12_10102d ALA80 Oakland Touchdown Concrete Barrier Form Install 02/10/12
12_10102d ALA80 Oakland Touchdown Concrete Barrier Form Install 02/10/12
_9873d021_small.jpg 12_10122_26d ALA80 Oakland Maintenance wBridge Closure 02/09-18/12
12_10122_26d ALA80 Oakland Maintenance wBridge Closure 02/09-18/12
_9873d021_small.jpg 12_10100d SF80 YBI SAS Cable Install 02/09/12
12_10100d SF80 YBI SAS Cable Install 02/09/12
_9873d021_small.jpg 12_10097d ALA880 Newark, Dumbarton Retrofit Prior to Footing Pour 02/08/12
12_10097d ALA880 Newark, Dumbarton Retrofit Prior to Footing Pour 02/08/12
_9873d021_small.jpg 11_10099d SCL101 San Jose Tully Rd WB Overcrossing 02/06/12
11_10099d SCL101 San Jose Tully Rd WB Overcrossing 02/06/12
_9873d021_small.jpg 12_10091d SF101 Doyle Drive VA Cemetery Fence at Michael Bondi's Studio 02/03/12
12_10091d SF101 Doyle Drive VA Cemetery Fence at Michael Bondi's Studio 02/03/12
_9873d021_small.jpg 12_10093d ALA880 Oakland Aerials, 880 @ 5th Ave 02/02/12
12_10093d ALA880 Oakland Aerials, 880 @ 5th Ave 02/02/12
_9873d021_small.jpg 12_10089d ALA80 Oakland Touchdown Aerials 02/02/12
12_10089d ALA80 Oakland Touchdown Aerials 02/02/12
_9873d021_small.jpg 12_10088d SF80 YBI Aerials SAS Transition Structure 02/02/12
12_10088d SF80 YBI Aerials SAS Transition Structure 02/02/12
_9873d021_small.jpg 12_10087d SF80 Aerials Westbay Terminal 02/02/12
12_10087d SF80 Aerials Westbay Terminal 02/02/12
_9873d021_small.jpg 12_10083d SF101 Aerials, Doyle Drive Traffic @ 0900 Hrs 02/02/12
12_10083d SF101 Aerials, Doyle Drive Traffic @ 0900 Hrs 02/02/12
_9873d021_small.jpg 12-10082d SM1 Pacifica, Devils Slide Tunnel Aerials 02/02/12
12-10082d SM1 Pacifica, Devils Slide Tunnel Aerials 02/02/12
_9873d021_small.jpg 12_10084d MRN1 Bolinas Pay Aerials, Shoreline Maintenance Improvements 02/02/12
12_10084d MRN1 Bolinas Bay Aerials, Shoreline Maintenance Improvements 02/02/12
_9873d021_small.jpg 12_10079d CC4 Widening Concrete Form and Retaining Walls Pour, Earthwork 02/01/12
12_10079d CC4 Widening Concrete Form and Retaining Walls Pour, Earthwork 02/01/12
_9873d021_small.jpg 12_10078d SF1 Pacifica, Devils Slide Concrete Roadway Pour w/Media 01/30/12
12_10078d SF1 Pacifica, Devils Slide Concrete Roadway Pour w/Media 01/30/12
_9873d021_small.jpg 12_10075d ALA880 Oakland, 880 High Street, CIDH Pile Cage Concrete Pour 01/30/12
12_10075d ALA880 Oakland, 880 High Street, CIDH Pile Cage Concrete Pour 01/30/12
_9873d021_small.jpg 12_10076d SCL101 Menlo Park, 101 Widening Overviews 01/30/12
12_10076d SCL101 Menlo Park, 101 Widening Overviews 01/30/12
_9873d021_small.jpg 12-10071b SF80 YBI Main Cable SAS Strands 8-9and10 01/28/12
12-10071b SF80 YBI Main Cable SAS Strands 8-9and10 01/28/12
_9873d021_small.jpg 12_10072d SF101 San Francisco, Doyle Drive Project 01/27/12
12_10072d SF101 San Francisco, Doyle Drive Project 01/27/12
_9873d021_small.jpg 12_10066d ALA24 Oakland, Caldecott Tunnel Cross Path Concrete Shotcrete pour 01/25/12
12_10066d ALA24 Oakland, Caldecott Tunnel Cross Path Concrete Shotcrete pour 01/25/12
_9873d021_small.jpg 12_10058d SF80, San Francisco, Ricon Hill Dog Park Completion 01/17/12
12_10058d SF80, San Francisco, Ricon Hill Dog Park Completion 01/17/12
_9873d021_small.jpg 12_10057d SF101 Doyle Drive Tunnel Prior to Outside Concrete Pour 01/17/12
12_10057d SF101 Doyle Drive Tunnel Prior to Outside Concrete Pour 01/17/12
_9873d021_small.jpg 12_10060d SF80 Cable Fab 1,2 placed adj 3,5 pulled 01/19/12
12_10060d SF80 Cable Fab 1,2 placed adj 3,5 pulled 01/19/12
_9873d021_small.jpg 12_10049d ALA880 High Street Replacement, Demo Old NB Structure 01/09/12
12_10049d ALA880 High Street Replacement, Demo Old NB Structure 01/09/12
_9873d021_small.jpg 12_10046d SF80 YBI 2nd Strand Install @ W2 01/16/12
12_10046d SF80 YBI 2nd Strand Install @ W2 01/16/12
_9873d021_small.jpg 12_10053d SF80 YBI SAS Cable Work 1st 2nd Strands 01/05/12
12_10053d SF80 YBI SAS Cable Work 1st 2nd Strands 01/05/12
_9873d021_small.jpg 12_10045d ALA880 Aerials 5th and High Streets 01/04/12
12_10045d ALA880 Aerials 5th and High Streets 01/04/12
_9873d021_small.jpg 10041d ALA80 Oakland Aerials, Touchdown 01/04/12
10041d ALA80 Oakland Aerials, Touchdown 01/04/12
_9873d021_small.jpg 10044d SF80 YBI Aerials, SAS YBI Transition, OTD 01/04/12
10044d SF80 YBI Aerials, SAS YBI Transition, OTD 01/04/12
_9873d021_small.jpg 10039d SF101 Doyle Drive Project Aerials, 01/04/12
10039d SF101 Doyle Drive Project Aerials, 01/04/12
_9873d021_small.jpg 10038d SM1 Devils Slide Tunnel Aerials, Pacifica 01/04/12
10038d SM1 Devils Slide Tunnel Aerials, Pacifica 01/04/12
_9873d021_small.jpg 10037d Sol80 Dixon Site Doc, Traffic Controls, Loops 01/13/12
10037d Sol80 Dixon Site Doc, Traffic Controls, Loops 01/13/12
_9873d021_small.jpg 10036d Sol80 Cordelia Site Doc, Truck Scale Location 01/03/12
10036d Sol80 Cordelia Site Doc, Truck Scale Location 01/03/12

Photography Gallery 2011

_9873d021_small.jpg 10031d SAS YBI 1st Pull East Line 12/22/11
10031d SAS YBI 1st Pull East Line 12/22/11
_9873d021_small.jpg 10030d SF80 YBI SAS Strand Pull Main Cable 12/21/11
10030d SF80 YBI SAS Strand Pull Main Cable 12/21/11
_9873d021_small.jpg 10029d ALA80 Emeryville Site Art Sculpture @ Powell 12/20/11
10029d ALA80 Emeryville Site Art Sculpture @ Powell 12/20/11
_9873d021_small.jpg 10027d CC580 Richmond, Scofield Ave 12/20/11
10027d CC580 Richmond, Scofield Ave 12/20/11
_9873d021_small.jpg 10028d MRN101 Sausalito, Golden Gate to Lucky Drive 12/20/11
10028d MRN101 Sausalito, Golden Gate to Lucky Drive 12/20/11
_9873d021_small.jpg 10026d SF80 YBI Main Cable Pull and Set Up 12/19/11
10026d SF80 YBI Main Cable Pull and Set Up 12/19/11
_9873d021_small.jpg 10021d ALA80 Oakland Touchdown 12/15/11
10021d ALA80 Oakland Touchdown 12/15/11
_9873d021_small.jpg 10022 SF80 YBI Pulling Frame and Related Test 12/15/11
10022 SF80 YBI Pulling Frame and Related Test 12/15/11
_9873d021_small.jpg 10013d Oakland Touchdown Bidders Conference 12/13/11
10013d Oakland Touchdown Bidders Conference 12/13/11
_9873d021_small.jpg 10015d16 CC4 Antioch, Hwy 4 Widening, Rebar Install Loveridge Rd 12/12/11
10015d16 CC4 Antioch, Hwy 4 Widening, Rebar Install Loveridge Rd 12/12/11
_9873d021_small.jpg 10009d ALA880 Newark, Dumbarton Bridge Retrofit, Horiz Bar Install 12/06/11
10009d ALA880 Newark, Dumbarton Bridge Retrofit, Horiz Bar Install 12/06/11
_9873d021_small.jpg SF80 Aerials SAS, YBI Transition 12/02/11
SF80 Aerials SAS, YBI Transition 12/02/11
_9873d021_small.jpg 10006d ALA80 Oakland Aerials Touchdown, Towing Service Building 12/02/11
10006d ALA80 Oakland Aerials Touchdown, Towing Service Building 12/02/11
_9873d021_small.jpg 10003d MRN1 Bolinas Bay Shoreline Aerials 12/02/11
10003d MRN1 Bolinas Bay Shoreline Aerials 12/02/11
_9873d021_small.jpg 10002d SF101 Doyle Drive Aerials 12/02/11
10002d SF101 Doyle Drive Aerials 12/02/11
_9873d021_small.jpg 9997d ALA880 Oakland, High Street Overviews Before Traffic Twitch 12/02/11
9997d ALA880 Oakland, High Street Overviews Before Traffic Switch 12/02/11
_9873d021_small.jpg 9998d SJ280 San Jose Aerials 280/880/17 and Stevens Creek 12/02/11
9998d SJ280 San Jose Aerials 280/880/17 and Stevens Creek 12/02/11
_9873d021_small.jpg 10000d SM1 Pacific Aerials, Devil's Slide 12/02/11
10000d SM1 Pacific Aerials, Devil's Slide 12/02/11
_9873d021_small.jpg 9999d SM280 San Mateo Aerials @80 92 Crystal Springs 12/02/11
9999d SM280 San Mateo Aerials @80 92 Crystal Springs 12/02/11
_9873d021_small.jpg 10001d SF1 San Francisco Aerials, Mountain Lake 12/02/11
10001d SF1 San Francisco Aerials, Mountain Lake 12/02/11
_9873d021_small.jpg 9994d SF101 Falsework Removed From Pet Cemetary, Tunnel Guardrail Lighting Instalation 12/01/11
9994d SF101 Falsework Removed From Pet Cemetary, Tunnel Guardrail Lighting Instalation 12/01/11
_9873d021_small.jpg 9993d ALA80 Oakland Key Ceremony, New Tow Service Bldg 12/01/11
9993d ALA80 Oakland Key Ceremony, New Tow Service Bldg 12/01/11
_9873d021_small.jpg 9987d ALA880 Oakland High Street, Demo of NB Roadway 11/29/11
9987d ALA880 Oakland High Street, Demo of NB Roadway 11/29/11
_9873d021_small.jpg 9988d ALA24 Oakland, Caldecott 4th Bore Break Through 11/29/11
9988d ALA24 Oakland, Caldecott 4th Bore Break Through 11/29/11
_9873d021_small.jpg 9986d ALA880 Oakland, 5th Ave Overcrossing, Pile Welding 11/29/11
9986d ALA880 Oakland, 5th Ave Overcrossing, Pile Welding 11/29/11
_9873d021_small.jpg 10008d SCL101 San Jose Tully Road Overcrossing 11/23/11
10008d SCL101 San Jose Tully Road Overcrossing 11/23/11
_9873d021_small.jpg 9985d ALA24, Caldecott Tunnell Invert Shotcrete Bench 11/29/11
9985d ALA24, Caldecott Tunnell Invert Shotcrete Bench 11/23/11
_9873d021_small.jpg 9981d SCL101 San Jose, Tully Overcrossing Post Tension 11/23/11
9981d SCL101 San Jose, Tully Overcrossing Post Tension 11/23/11
_9873d021_small.jpg 9984d YBI New East Span YBITS Overviews from YBI 11/22/11
9984d YBI New East Span YBITS Overviews from YBI 11/22/11
_9873d021_small.jpg 9982d SF80 Ricon Hill, Dog Park overviews 11/22/11
9982d SF80 Ricon Hill, Dog Park overviews 11/22/11
_9873d021_small.jpg 9983d SF80 YBI New East Span, PWS Anchor Rod Installation 11/22/11
9983d SF80 YBI New East Span, PWS Anchor Rod Installation 11/22/11
_9873d021_small.jpg 9973d CC160 Antioch Bridge Aerials 11/16/11
9973d CC160 Antioch Bridge Aerials 11/16/11
_9873d021_small.jpg 9976d ALA680 San Ramone Aerials, S Whipple Rehab San Ramon-Walnut Creek 11/16/11
9976d ALA680 San Ramon Aerials, S Whipple Rehab San Ramon-Walnut Creek 11/16/11
_9873d021_small.jpg 9975d CC580 Livermore Aerials Altamont to Vasco 11/16/11
9975d CC580 Livermore Aerials Altamont to Vasco 11/16/11
_9873d021_small.jpg 9978d ALA880 Oakland Aerials 5th to High Street 11/16/11
9978d ALA880 Oakland Aerials 5th to High Street 11/16/11
_9873d021_small.jpg 9977d CC24 Orinda Aerials, Caldecott Tunnel 11/16/11
9977d CC24 Orinda Aerials, Caldecott Tunnel 11/16/11
_9873d021_small.jpg 9972d CC4 Pittsburg Aerials Widening Project 11/16/11
9972d CC4 Pittsburg Aerials Widening Project 11/16/11
_9873d021_small.jpg 9970d SF101 Ruckman Bridgepost demo of old bridge, pre falsework girders removed from Pet Cemetary, Waterproofing Tunnel 11/16/11
9970d SF101 Ruckman Bridgepost demo of old bridge, pre falsework girders removed from Pet Cemetary, Waterproofing Tunnel 11/16/11
_9873d021_small.jpg 9969d ALA80 Oakland Construction Update, SAS setup for main cable 11/15/11
9969d ALA80 Oakland Construction Update, SAS setup for main cable 11/15/11
_9873d021_small.jpg 9966d CC4 Antioch, HWY 4 Widening, Falsework Installation @ Loveridge Road, Earthwork 11/15/11
9966d CC4 Antioch, HWY 4 Widening, Falsework Installation @ Loveridge Road, Earthwork 11/15/11
_9873d021_small.jpg 9965d ALA880 Newark, Dumbarton Bridge Retrofit from a boat drilling holes for rebar and grinding pier footing, 11/14/11
9965d ALA880 Newark, Dumbarton Bridge Retrofit from a boat drilling holes for rebar and grinding pier footing, 11/14/11
_9873d021_small.jpg 9964d ALA880 Oakland, 880 High Street Replacement, After Traffic Switch of S/B 880 11/14/11
9964d ALA880 Oakland, 880 High Street Replacement, After Traffic Switch of S/B 880 11/14/11
_9873d021_small.jpg 9959d SF80 Treasure Island Ceremony SAS Interpretive Sign Unveiling 11/10/11
9959d SF80 Treasure Island Ceremony SAS Interpretive Sign Unveiling 11/10/11
_9873d021_small.jpg 9958d SF80 Treasure Island Ceremoney 75th Anniversery SFOBB 11/10/11
9958d SF80 Treasure Island Ceremoney 75th Anniversery SFOBB 11/10/11
_9873d021_small.jpg 9961d ALA880 Oakland, 5th Ave Overcrossing, Demo of Old S/B 880 Roadway 11/09/11
9961d ALA880 Oakland, 5th Ave Overcrossing, Demo of Old S/B 880 Roadway 11/09/11
_9873d021_small.jpg 9960d ALA580 Livermore, I/C Completed with out Traffic 11/09/11
9960d ALA580 Livermore, I/C Completed with out Traffic 11/09/11
_9873d021_small.jpg 9955d SF80 YBI Toll Bridge, Concrete Pour YBI Transition 11/08/11
9955d SF80 YBI Toll Bridge, Concrete Pour YBI Transition 11/08/11
_9873d021_small.jpg 9954d SF80 YBI Cable Installation Equipment W2 11/08/11
9954d SF80 YBI Cable Installation Equipment W2 11/08/11
_9873d021_small.jpg 9950d ALA880 Oakland, High Street Replacement, After Parial Paving Of Approaches 11/04/11
9950d ALA880 Oakland, High Street Replacement, After Parial Paving Of Approaches 11/04/11
_9873d021_small.jpg 9951d SF1 Pacifica, Devils Slide Tunnel OMC Building, Shotcrete Wall Pour North Side Of HWY 1 11/04/11
9951d SF1 Pacifica, Devils Slide Tunnel OMC Building, Shotcrete Wall Pour North Side Of HWY 1 11/04/11
_9873d021_small.jpg 9950d ALA880 Oakland, High Street Replacement, After Parial Paving Of Approaches 11/04/11
9950d ALA880 Oakland, High Street Replacement, After Parial Paving Of Approaches 11/04/11
_9873d021_small.jpg 9941d SM1 Pacifica Aerials, Devil's Slide Tunnel 11/02/11
9941d SM1 Pacifica Aerials, Devil's Slide Tunnel 11/02/11
_9873d021_small.jpg 9945d SF80 YBI Aerials, New East Span, 11/02/11
9945d SF80 YBI Aerials, New East Span, 11/02/11
_9873d021_small.jpg 9242d SF101 San Francisco Aerials, Doyle Drive Project 11/02/11
9242d SF101 San Francisco Aerials, Doyle Drive Project 11/02/11
_9873d021_small.jpg 9944d SF101 San Francisco Aerials, Dog Park 2d Street 11/02/11
9944d SF101 San Francisco Aerials, Dog Park 2d Street 11/02/11
_9873d021_small.jpg 9943d MRN1 Bolinas Aerials, Maint C. Morton Bolinas Bay Alt 750' 45 Degrees 11/02/11
9943d MRN1 Bolinas Aerials, Maint C. Morton Bolinas Bay Alt 750' 45 Degrees 11/02/11
_9873d021_small.jpg 9946d ALA24 Oakland Aerials, Caldecott Tunnel 11/02/11
9946d ALA24 Oakland Aerials, Caldecott Tunnel 11/02/11
_9873d021_small.jpg 9940d SM92 Foster City Aerials, San Mateo Bridge, East End Of H.R. 11/02/11
9940d SM92 Foster City Aerials, San Mateo Bridge, East End Of H.R. 11/02/11
_9873d021_small.jpg 9937d SF101 Doyle Drive, Falsework Removed, Seismic Joint Assembly Installation 10/31/11
9937d SF101 Doyle Drive, Falsework Removed, Seismic Joint Assembly Installation 10/31/11
_9873d021_small.jpg 9947d SCL 101 SanJose, Tuly Road Overcrossing, Storm Drain Pipe Installation 10/28/11
9947d SCL 101 SanJose, Tuly Road Overcrossing, Storm Drain Pipe Installation 10/28/11
_9873d021_small.jpg 9931d ALA880 Newark Dumbarton Bridge Retrofit, Rebar Installation Core Drilling 10/26/11
9931d ALA880 Newark Dumbarton Bridge Retrofit, Rebar Installation Core Drilling 10/26/11
_9873d021_small.jpg 9930d SF80 YBI SAS & Install Last Cross Beam 10/25/11
9930d SF80 YBI SAS & Install Last Cross Beam 10/25/11
_9873d021_small.jpg 9928d ALA880 Oakland, Media Event with Senator Barbara Boxer 10/25/11
9928d ALA880 Oakland, Media Event with Senator Barbara Boxer 10/25/11
_9873d021_small.jpg 9920d SF80 YBI Aerials, Install 14W, Views From Port Of Oakland 10/19/11
9920d SF80 YBI Aerials, Install 14W, Views From Port Of Oakland 10/19/11
_9873d021_small.jpg 9927d CC4 Antioch Bridge Retrofit, Jacking Up Bridge at Pier 11 10/11/24
9927d CC4 Antioch Bridge Retrofit, Jacking Up Bridge at Pier 11 10/11/24
_9873d021_small.jpg 9925d ALA61 Aerials Oakland, San Leandro, Alameda 11/10/20
9925d ALA61 Oakland, San Leandro, Alameda 11/10/20
_9873d021_small.jpg 9919d ALA880 Oakland D.O. Activity Diversity Day - Employees 10/18/11
9919d ALA880 Oakland D.O. Activity Diversity Day - Employees 10/18/11
_9873d021_small.jpg 9916d SM1 Pacifica Aerials, Devils Slide Project 10/14/11
9916d SM1 Pacifica Aerials, Devil's Slide Project 10/14/11
_9873d021_small.jpg 9917d SM92 Aerials, Foster City, End Of High Rise 10/14/11
9917d SM92 Aerials, Foster City, End Of High Rise 10/14/11
_9873d021_small.jpg 9912d ALA80 Oakland Aerials, Touch Down and Toll Plaza 10/14/11
9912d ALA80 Oakland Aerials, Touch Down and Toll Plaza 10/14/11
_9873d021_small.jpg 9818d ALA880 Hayward Aerials 880/92 Interchange 10/14/11
9818d ALA880 Hayward Aerials 880/92 Interchange 10/14/11
_9873d021_small.jpg 9915d SF101 Aerials, Doyle Drive Project 10/14/11
9915d SF101 Aerials, Doyle Drive Project 10/14/11
_9873d021_small.jpg 9914d SF80 San Francisco Aerials, Dog Park and Old Transbay 10/14/11
9914d SF80 San Francisco Aerials, Dog Park and Old Transbay 10/14/11
_9873d021_small.jpg 9913d SF80 YBI Aerials and Toll Bridge 10/14/11
9913d SF80 YBI Aerials and Toll Bridge 10/14/11
_9873d021_small.jpg 9909d CC4 Antioch, HWY 4 Widening before Somersville Road Overcrossing, Concrete Deck Pour 10/13/11
9909d CC4 Antioch, HWY 4 Widening before Somersville Road Overcrossing, Concrete Deck Pour 10/13/11
_9873d021_small.jpg 9908d Overviews Earthwork @ Loveridge RD 10/13/11
9908d Overviews Earthwork @ Loveridge RD 10/13/11
_9873d021_small.jpg 9895d ALA 92 880 Hayward Ribbon Cutting 10/07/11
9895d ALA 92 880 Hayward Ribbon Cutting 10/07/11
_9873d021_small.jpg 9890d SF80 YBI New East Span, SAS Segment 13E Lift 09/27/11
9890d SF80 YBI New East Span, SAS Segment 13E Lift 09/27/11
_9873d021_small.jpg 9876d SF80 YBI Aerials, New SAS and Lift 13W 09/22/11
9876d SF80 YBI Aerials, New SAS and Lift 13W 09/22/11
_9873d021_small.jpg 9883d SF80 YBI Construction, Cross Beam Place 13W-13E 09/22/11
9883d SF80 YBI Construction, Cross Beam Place 13W-13E 09/22/11
_9873d021_small.jpg 9887d ALA880 Oakland, 880 High Street Replacement Project 09/22/11
9886d ALA9887d ALA880 Oakland, 880 High Street Replacement Project 09/22/11
_9873d021_small.jpg 9886d ALA 92/880 Hayward Reconstruction Overviews 09/22/11
9886d ALA 92/880 Hayward Reconstruction Overviews 09/22/11
_9873d021_small.jpg 9882d MRN1 Bolinas Ceremony Improvement 5.5 to 17.0 09/21/11
9882d MRN1 Bolinas Ceremony Improvement 5.5 to 17.0 09/21/11
_9873d021_small.jpg 9899d Son101 Rohnert Park Aerials, Wilfred Exchange 09/20/11
9899d Son101 Rohnert Park Aerials, Wilfred Exchange 09/20/11
_9873d021_small.jpg 9901d MRN101 Novato Aerials, 101-37 Interchange and Widening 09/20/11
9901d MRN101 Novato Aerials, 101-37 Interchange and Widening 09/20/11
_9873d021_small.jpg 9881d SF101 Aerials Doyle Drive Tunnel 09/20/11
9881d SF101 Aerials Doyle Drive Tunnel 09/20/11
_9873d021_small.jpg 9879d Son128 Geyserville Aerials, 128 Russian River Bridge 09/20/11
9879d Son128 Geyserville Aerials, 128 Russian River Bridge 09/20/11
_9873d021_small.jpg 9878d Son1 Bodega Bay Aerials to Point Aera 09/20/11
9878d Son1 Bodega Bay Aerials to Point Aera 09/20/11
_9873d021_small.jpg 9874d ALA880 Hayward Aerials 880/92 Interchange 09/20/11
9874d ALA880 Hayward Aerials 880/92 Interchange 09/20/11
_9873d021_small.jpg 9877d MRN1 Bolinas Bay Aerials 09/20/11
9877d MRN1 Bolinas Bay Aerials 09/20/11
_9873d021_small.jpg 9873d ALA 92/880 Hayward Reconstruction Overviews 09/14/11
9873d ALA 92/880 Hayward Reconstruction Overviews 09/14/11
_9870d048_small.jpg 9904d SF80 YBI Aerials, Last Cable Saddle Install 13E 09/13/11
9904d SF80 YBI Aerials, Last Cable Saddle Install 13E 09/13/11
_9870d048_small.jpg 9870d ALA24 Oakland, Caldecott Tunnel, Shotcrete Tunnel Wall, Air Monitoring 09/13/11
9870d ALA24 Oakland, Caldecott Tunnel, Shotcrete Tunnel Wall, Air Monitoring 09/13/11
d_0002_small.jpg 9869d SF101 San Francisco, Doyle Drive Project Update 09/12/11
9869d SF101 San Francisco, Doyle Drive Project Update 09/12/11
_9862d033_small.jpg 9862d SF1 Pacifica, Devils Slide, Painting North Portal SB Tunnel, Overviews 09/08/11
9862d SF1 Pacifica, Devils Slide, Painting North Portal SB Tunnel, Overviews 09/08/11
d_0002_small.jpg 9868d SF80 YBI Tensioning Tower Pull Back 09/08/11
9868d SF80 YBI Tensioning Tower Pull Back 09/08/11
d_0002_small.jpg 9859d SF80 YBI Aerials Toll Plaza to YBI New East Span 09/07/11
9859d SF80 YBI Aerials Toll Plaza to YBI New East Span 09/07/11
d_0002_small.jpg 9860d SF80 San Francisco Aerials, Touch Down to Central Fwy 09/07/11
9860d SF80 San Francisco Aerials, Touch Down to Central Fwy 09/07/11
d_0002_small.jpg 9867d ALA880 Oakland Aerials 5th Street Overcrossing 09/07/11
9867d ALA880 Oakland Aerials 5th Street Overcrossing 09/07/11
d_0002_small.jpg 9858d ALA80 Oakland Aerials, Maze Approaches to Bay Bridge 09/07/11
9858d ALA80 Oakland Aerials, Maze Approaches to Bay Bridge 09/07/11
d_0002_small.jpg 9861d SF101 Doyle Drive Aerials 09/07/11
9861d SF101 Doyle Drive Aerials 09/07/11
_9853003_small.jpg 9853d ALA880 Oakland, 880 High Street Replacement Prior to SB 880 Pour 08/30/11
9853d ALA880 Oakland, 880 High Street Replacement Prior to SB 880 Pour 08/30/11
_9854d009_small.jpg 9854d ALA880 Oakland, 5th Ave Overcrossing Removal SB 880 Girders 08/30/11
9854d ALA880 Oakland, 5th Ave Overcrossing Removal SB 880 Girders 08/30/11
d_0032_small.jpg 9851d SF80 Treasure Island, 1st Lighting Catwalks SAS 08/29/11
9851d SF80 Treasure Island, 1st Lighting Catwalks SAS 08/29/11
_9848d006_small.jpg 9849d ALA80 Oakland, Unloading Zen Hoa 19 Pier 7 08/29/11
9849d ALA80 Oakland, Unloading Zen Hoa 19 Pier 7 08/29/11
_9848d006_small.jpg 9848d SM101 Menlo Park Storm Drain Demo 08/29/11
9848d SM101 Menlo Park Storm Drain Demo 08/29/11
d_0009_small.jpg 9845d MRN101 Novato HOV 37 North 08/26/11
9845d MRN101 Novato HOV 37 North 08/26/11
d_0001_small.jpg 9846d SON101 Rohnert Park, 101 Widening, Wilfred Interchange 08/26/11
9846d SON101 Rohnert Park, 101 Widening, Wilfred Interchange 08/26/11
d_0022_small.jpg 9840d SM1 Pacifica Aerials Devil's Slide Tunnel Project 08/23/11
9840d SM1 Pacifica Aerials Devil's Slide Tunnel Project 08/23/11
_9838d003_small.jpg 9838_39d SF101 Doyle Drive, San Francisco, Hands Working with Tools, Concrete Pour 08/22/11
9838_39d SF101 Doyle Drive, San Francisco, Hands Working with Tools, Concrete Pour 08/22/11
d_0012_small.jpg 9837d Ala880 Oakland High Street after 1st Deck Pour 08/19/11
9837d Ala880 Oakland High Street after 1st Deck Pour 08/19/11
d_0009_small.jpg 9836d ALA880 Oakland, 5th Ave After SB Traffic Switch 08/19/11
9836d ALA880 Oakland, 5th Ave After SB Traffic Switch 08/19/11
_9834d003_small.jpg 9834d ALA Oakland, Health, Safety and Transportation Awareness Fair 08/17/11
9834d ALA Oakland, Health, Safety and Transportation Awareness Fair 08/17/11
_9831d005_small.jpg 9831d SL101 San Jose, Tully Road Overcrossing after Traffic Switch, Pile Driving 08/16/11
9831d SL101 San Jose, Tully Road Overcrossing after Traffic Switch, Pile Driving 08/16/11
_9827d002_small.jpg 9827d SF80 New East Span, Shearky and Bearing Intalled @ E2 08/12/11
9827d SF80 New East Span, Shearky and Bearing Intalled @ E2 08/12/11
_9828d001_small.jpg 9828d ALA880 Oakland, High Street Replacement Just Before Deck Pour 08/12/19836d ALA880 Oakland, 5th Ave After SB Traffic Switch 08/19/11
9828d ALA880 Oakland, High Street Replacement Just Before Deck Pour 08/12/11
d001_small.jpg 9775d SF80 Ricon Hill Dog Park Overviews 08/12/11
9775d SF80 Ricon Hill Dog Park Overviews 08/12/11
d007_small.jpg 9889d SF80 Oakland, Touchdown Detour Overviews 08/09/11
9889d SF80 Oakland, Touchdown Detour Overviews 08/09/11
d007_small.jpg 9825d ALA92/880 Hayward, wb92 to sb880 Connector Ramp Opened 08/09/11
9825d ALA92/880 Hayward, wb92 to sb880 Connector Ramp Opened 08/09/11
d_0002_small.jpg 9821d ALA880 Oakland Aerials, High Street 5th Ave Replacement 08/04/11
9821d ALA880 Oakland Aerials, High Street 5th Ave Replacement 08/04/11
d_0001_small.jpg 9822d ALA80 Oakland Aerials Toll Plaza to New Easst Span 0/04/11
9822d ALA80 Oakland Aerials Toll Plaza to New East Span 08/04/11
d001_small.jpg 9819 ALA92_880 Hayward wb92 to sb 880 Connector Ramp Just Priod to Opening 08/04/11
9819 ALA92_880 Hayward wb92 to sb 880 Connector Ramp Just Priod to Opening 08/04/11
d001_small.jpg 9817d ALA880 Oakland, High Street, Concrete Replacement Stem and Soffit Pour 08/04/11
9817d ALA880 Oakland, High Street, Concrete Replacement Stem and Soffit Pour 08/04/11
d_0001_small.jpg 9823d SF101 Aerials, Doyle Drive Replacement 08/04/11
9823d SF101 Aerials, Doyle Drive Replacement 08/04/11
d_0005_small.jpg 9829d SF80 YBI SAS, Pull Back Sys and Cat Walks 08/03/11
9829d SF80 YBI SAS, Pull Back Sys and Cat Walks 08/03/11
d_0014_small.jpg 9809d MRN101 Widening Novato Aerials @ HWY37 Repaving 08/02/11
9809d MRN101 Widening Novato Aerials @ HWY37 Repaving 08/02/11
d_0001_small.jpg 9807d SF80 YBI Aerials Transition Concrete Pour 08/02/11
9807d SF80 YBI Aerials Transition Concrete Pour 08/02/11
d_0009_small.jpg 9811d SON101 Rohnert aprk Aerials, Wilfred Interchange 08/02/11
9811d SON101 Rohnert aprk Aerials, Wilfred Interchange 08/02/11
d_0016_small.jpg 9809d MRN101 Novato Aerials, HWY 37 Widening Repaving 08/02/11
9809d MRN101 Novato Aerials, HWY 37 Widening Repaving 08/02/11
d010_small.jpg 9814d 9815d CC4 Antioch, Earthwork, Rebar and Soundwall at Loveridge Rd 08/02/11
9814d 9815d CC4 Antioch, Earthwork, Rebar and Soundwall at Loveridge Rd 08/02/11
d_0009_small.jpg 9810d Son101 Petaluma Aerials, Rohnert Park 08/02/11
9810d Son101 Petaluma Aerials, Rohnert Park 08/02/11
d_0001_small.jpg 9813 MRN 1 Bolinas Aerials, Maintenance Activities 08/02/11
9813 MRN 1 Bolinas Aerials, Maintenance Activities 08/02/11
d_0011_small.jpg 9812d Son128 Geyserville Aerials, Russian River Bridge 08/02/11
9812d Son128 Geyserville Aerials, Russian River Bridge 08/02/11
d_0002_small.jpg 9806d Sol37 Vallejo Aerials, Napa River to 101 Novato 08/02/11
9806d Sol37 Vallejo Aerials, Napa River to 101 Novato 08/02/11
d_0003_small.jpg 9804d SF80 YBI SAS Catwalks and Pull Back Sys. 08/01/11
9804d SF80 YBI SAS Catwalks and Pull Back Sys. 08/01/11
d_0001_small.jpg 9805d SF80 Dog Park & 5th Street 08/01/11
9805d SF80 Dog Park amp; 5th Street 08/01/11
d004_small.jpg 9802 9801d SF101 Doyle Drive Falsework Installation, Concrete Wall Pour 07/29/11
9802 9801d SF101 Doyle Drive Falsework Installation, Concrete Wall Pour 07/29/11
d001_small.jpg 9794d Ala880 Oakland High Street 07/27/11
9794d Ala880 Oakland High Street 07/27/11
d009_small.jpg 9793d Ala880 Oakland Overcrosssig 5th Ave, After SB Ramp Traffic Switch 07/27/11
9793d Ala880 Oakland Overcrosssig 5th Ave, After SB Ramp Traffic Switch 07/27/11
d_0012_small.jpg 9799d Son101 Widening Petaluma to Rohnert Park 07/26/11
9799d Son101 Widening Petaluma to Rohnert Park 07/26/11
d_0001_small.jpg 9797d Hwy 37, MRN Novato 07/26/11
9797d Hwy 37, MRN Novato 07/26/11
d005_small.jpg 9792d ALA580 Livermore, Isabel Interchange over HWY, 580 Post Falsework Removal, Paving 07/25/11
9792d ALA580 Livermore, Isabel Interchange over HWY, 580 Post Falsework Removal, Paving 07/25/11
d_0007_small.jpg 99790d SF80 YBI SAS Update 07/22/11
9790d SF80 YBI SAS Update 07/22/11
d_0002_small.jpg 9789d SF80 YBI YBITS 1st Concrete Pour Transition 07/22/11
9789d SF80 YBI YBITS 1st Concrete Pour Transition 07/22/11
d002_small.jpg 9787d ALA880 Hayward 92_880 Reconstruction Project 07/20/11
9787d ALA880 Hayward 92_880 Reconstruction Project 07/20/11
d095_small.jpg 9786d SM101 Menlo Park, HOV 101 Widening Groundbreaking Ceremony 07/20/11
9786d SM101 Menlo Park, HOV 101 Widening Groundbreaking Ceremony 07/20/11
d001_small.jpg 9779d SJ4 Stockton, Calmetor Protege Appreciation Ceremony 07/15/11
9779d SJ4 Stockton, Calmetor Protege Appreciation Ceremony 07/15/11
d027_small.jpg 9780d SON 128 Healdsburg, Maacama and Redwood Bridges 07/13/11
9780d SON 128 Healdsburg, Maacama and Redwood Bridges 07/13/11
d008_small.jpg 9778d MRN101 Novato, Marin Sonoma Narrows Widening Groundbreaking 07/14/11
9778d MRN101 Novato, Marin Sonoma Narrows Widening Groundbreaking 07/14/11
d186_small.jpg 9772d SF80 New East Span Touchdown, Pile Driving 07/12/11
9772d SF80 New East Span Touchdown, Pile Driving 07/12/11
d189_small.jpg 9776d Move Over Law Press Conf 07/11/11
9776d Move Over Law Press Conf 07/11/11
d017_small.jpg 9764, 9765d SON 128 Healdsburg Redwood Creek Bridge Replacement, Protection of Creek Water 07/01/11
9764, 9765d SON 128 Healdsburg Redwood Creek Bridge Replacement, Protection of Creek Water 07/01/11
d_0011_small.jpg 9761d Ala80 Oakland Aerials, Touchdown 06/29/11
9761d Ala80 Oakland Aerials, Touchdown 06/29/11
d_0001_small.jpg 9762d ALA880 Oakland Aerials 5th & 42nd Ave 06/29/11
9762d ALA880 Oakland Aerials 5th & 42nd Ave 06/29/11
d_0001_small.jpg 9759d SF101 Aerials, Doyle Drive Project 06/29/11
9759d SF101 Aerials, Doyle Drive Project 06/29/11
d _0001_small.jpg 9758 SM1 Pacifica Aerials, Devil's Slide Tunnel 06/29/11
9758 SM1 Pacifica Aerials, Devil's Slide Tunnel 06/29/11
d_0031_small.jpg 9763d SF 80 Dog Park Aerials, 5th Ave 06/29/11
9763d SF 80 Dog Park Aerials, 5th Ave 06/29/11
d 0058_small.jpg 9760d SF 80 YBI Aerials, SAS Trasition Structure and C.G. 06/29/11
9760d SF 80 YBI Aerials, SAS Trasition Structure and C.G. 06/29/11
d019_small.jpg 9745d NAPA Vallejo, Skaggs Island Transfer Ceremony to the Fish & Wildlife Service 06/28/11
9745d NAPA Vallejo, Skaggs Island Transfer Ceremony to the Fish & Wildlife Service 06/28/11
d007_small.jpg 9768d ALA880 Oakland, 5th Ave Overcrossing, AC Paving SB Approach 06/24/11
9768d ALA880 Oakland, 5th Ave Overcrossing, AC Paving SB Approach 06/24/11
d002_small.jpg 9766 Ala880 Oakland, 80d High Street Replacement Project, Rebar Installation 06/24/11
9766 Ala880 Oakland, 80d High Street Replacement Project, Rebar Installation 06/24/11
d007_small.jpg 9767 Ala880 Oakland, 5th Ave Overcrossing, after cellular concrete pours 06/24/11
9767 Ala880 Oakland, 5th Ave Overcrossing, after cellular concrete pours 06/24/11
d001_small.jpg 9739d CC4 Antioch Bridge Retrofit, Friction Pendulum Bearing Install 06/21/11
9739d CC4 Antioch Bridge Retrofit, Friction Pendulum Bearing Install 06/21/11
d116_small.jpg 9736d Devil's Slide Tunnel, Pacifica, Discovery Channel Filming 06/20/11
9736d Devil's Slide Tunnel, Pacifica, Discovery Channel Filming 06/20/11
d_0015_small.jpg 9741d SF80 YBI, Wet Catwalks in Place 06/24/11
9741d SF80 YBI, Wet Catwalks in Place 06/24/11
d_0004_small.jpg 9735d SF80 YBI Transition Structure 06/16/11
9735d SF80 YBI Transition Structure 06/16/11
d_0009_small.jpg 9734d SF80 Dog Park and 5th Street Update 06/15/11
9734d SF80 Dog Park and 5th Street Update 06/16/11
d003_small.jpg 9728 Ala880 E. Palo Alto, Dumbarton Bridge Retrofit, Substation Concrete Pour 06/15/11
9728 Ala880 E. Palo Alto, Dumbarton Bridge Retrofit, Substation Concrete Pour 06/15/11
d003_small.jpg 9728 Ala880 E. Palo Alto, Dumbarton Bridge Retrofit, Substation Concrete Pour 06/15/11
9728 Ala880 E. Palo Alto, Dumbarton Bridge Retrofit, Substation Concrete Pour 06/15/11
d013_small.jpg 9769d SF80 New East Span, SAS Tower Welding, Bike Panel Lift 06/14/11
9769d SF80 New East Span, SAS Tower Welding, Bike Panel Lift 06/14/11
d003_small.jpg 9722_23 Doyle Drive, Roadway Slab Pour in Tunnel, Hookramp Overviews 06/09/11
9722_23 Doyle Drive, Roadway Slab Pour in Tunnel, Hookramp Overviews 06/09/11
d011_small.jpg 9724 CC80 Richmond, Doyle Drive Fence Restoration @ Michael Bondi's Studio 06/09/11
9724 CC80 Richmond, Doyle Drive Fence Restoration @ Michael Bondi's Studio 06/09/11
d001_small.jpg 9721 SF80 San Francisco, Rincon Hill Dog Park 06/09/11
9721 SF80 San Francisco, Rincon Hill Dog Park 06/09/11
d_0001_small.jpg 9731d SOL80 Vallejo Aerials, Hunterhill Safety Rest Stop 06/07/11
9731d SOL80 Vallejo Aerials, Hunterhill Safety Rest Stop 06/07/11
d_0004_small.jpg 9714d ALA80 Oakland Touchdown Aerials 06/07/11
9714d ALA80 Oakland Touchdown Aerials 06/07/11
d_0004_small.jpg 9717d 11 Son 128 Geyserille, Russian River Bridge Aerials 06/07/11
9717d 11 Son 128 Geyserille, Russian River Bridge Aerials 06/07/11
d189_small.jpg 9776d Move Over Law Press Conf 07/11/11
9776d Move Over Law Press Conf 07/11/11
d_0007_small.jpg 9716d Son 101, Rohnert Park Aerials, Wilfred Exhange 06/07/11
9716d Son 101, Rohnert Park Aerials, Wilfred Exhange 06/07/11
d_0011_small.jpg 9715d Song 101 Petaluma Aerials, Novato to Rohnert Park 06/07/11
9715d Song 101 Petaluma Aerials, Novato to Rohnert Park 06/07/11
d002_small.jpg 9712d Ala880 Oakland, 5th Ave Overcrossing after Celular Concrete Pour 06/03/11
9712d Ala880 Oakland, 5th Ave Overcrossing after Cellular Concrete Pour 06/03/11
d002_small.jpg 9713d Ala880 Oakland High Street Replacement Falsework Installation 06/03/11
9713d Ala880 Oakland High Street Replacement Falsework Installation 06/03/11
d030_small.jpg 9710d 92/880 Reconstruction, Storm Drain Tunneling Under 880 06/02/11
9710d 92/880 Reconstruction, Storm Drain Tunneling Under 880 06/02/11
d_0003_small.jpg 9709 Son1 Bodega Bay Slide Repair 06/02/11
9709 Son1 Bodega Bay Slide Repair 06/02/11
d003_small.jpg 9707_08 Ala80 Oakland EB 80 Touchdown Detour 05/28/11
9707_08 Ala80 Oakland EB 80 Touchdown Detour 05/28/11
d197_small.jpg SM280 Hillsborough, Crystal Springs Ribbon Cutting 05/27/11
SM280 Hillsborough, Crystal Springs Ribbon Cutting 05/27/11
d_0009_small.jpg 9705d SM1 Pacifica Aerials Devils Slide Tunnel 05/26/11
9705d SM1 Pacifica Aerials Devils Slide Tunnel 05/26/11
d_0008_small.jpg 9702d SF80 Aerials SAS Saddle In Place 06/26/11
9702d SF80 Aerials SAS Saddle In Place 06/26/11
d_0007_small.jpg 9701 ALA80 Oakland Aerials, Toll Plaza Touchdown 05/26/11
9701 ALA80 Oakland Aerials, Toll Plaza Touchdown 05/26/11
d_0001_small.jpg 9703 SF80 YBI Transition Structure 05/26/11
9703 SF80 YBI Transition Structure 05/26/11
d_0001_small.jpg 9704 SF101 Aerials, Doyle Drive Project 05/26/11
9704 SF101 Aerials, Doyle Drive Project 05/26/11
d014_small.jpg 9698 CC80 Hercules, 80 HOV Lane Ribbon Cutting 05/24/11
9698 CC80 Hercules, 80 HOV Lane Ribbon Cutting 05/24/11
d013_small.jpg 9694_95d SF101 Doyle Drive Overviews Rebar Install on Tunnel Wall 05/23/11
9694_95d SF101 Doyle Drive Overviews Rebar Install on Tunnel Wall 05/23/11
d013_small.jpg 9690 ALA580 Livermore, Isabel Exchange Concrete Deck Pour 05/19/11
9690 ALA580 Livermore, Isabel Exchange Concrete Deck Pour 05/19/11
d018_small.jpg 9692 ALA880 Oakland, Concrete Deck Pour 5th Ave Overcrossing 05/19/11
9692 ALA880 Oakland, Concrete Deck Pour 5th Ave Overcrossing 05/19/11
d_0014_small.jpg 9689 SF80 YBI Saddle Installation SAS 05/19/11
9689 SF80 YBI Saddle Installation SAS 05/19/11
d002_small.jpg 9688 Ala 92_880 Reconstruction EB 92 to NB 880 Ramp wTraffic, Earthwork 05/18/11
9688 Ala 92_880 Reconstruction EB 92 to NB 880 Ramp wTraffic, Earthwork 05/18/11
d019_small.jpg 9685 Ala880 Oakland Overcrossing Concrete Pour 05/02/11
9685 Ala880 Oakland Overcrossing Concrete Pour 05/12/11
d001_small.jpg 9686 Ala880 High Street Replacement, New Falsework 05/02/11
9686 Ala880 High Street Replacement, New Falsework 05/12/11
d014_small.jpg 9683 Hwy 4 Widening, Earthwork near San Jose 05/11/11
9683 Hwy 4 Widening, Earthwork near San Jose 05/11/11
d_0001_small.jpg 9675 SF80 YBI Transition Structure 05/11/11
9675 SF80 YBI Transition Structure 05/11/11
d_0001_small.jpg 9676 SF80 YBI SAS Aerials 05/10/11
9676 SF80 YBI SAS Aerials 05/10/11
d010_small.jpg 9673 680 Rehabilitation, Roadway Concrete Slab Spour 05/10/11
9673 680 Rehabilitation, Roadway Concrete Slab Spour 05/10/11
d_0002_small.jpg 9674 SC101 Menlo Park Aerials, 101 University to Marsh 05/09/11
9674 SC101 Menlo Park Aerials, 101 University to Marsh 05/09/11
d016_small.jpg 101 San Jose, Tully Road Overcrossing Overviews 05/05/11
101 San Jose, Tully Road Overcrossing Overviews 05/05/11
d_0011_small.jpg 9666 SF80 YBI Grillage Drilling 05/04/11
9666 SF80 YBI Grillage Drilling 05/04/11
d_0001_small.jpg 9667 SF101 Concrete Deck Overviews 05/02/11
9667 SF101 Concrete Deck Overviews 05/02/11
d008_small.jpg Ala80 Oakland, New Tow Service Building at SFOBB Toll Plaza 05/03/11
Ala80 Oakland, New Tow Service Building at SFOBB Toll Plaza 05/03/11
d_0001_small.jpg 9657 Ala880 Oakland Aerials, High Street and 42nd Ave 04/28/11
9657 Ala880 Oakland Aerials, High Street and 42nd Ave 04/28/11
d015_small.jpg Rincon Hill Dog Park, Earthwork 04/28/11
Rincon Hill Dog Park, Earthwork 04/28/11
d_0001_small.jpg 9655 SCL101 San Jose, Tully Road Interchange 04/28/11
9655 SCL101 San Jose, Tully Road Interchange 04/28/11
d_0001_small.jpg 9659 Ala80 Oakland, New East Span 04/28/11
9659 Ala80 Oakland, New East Span 04/28/11
d004_small.jpg 101SF Doyle Drive Rebar & Ruckman Bridge 04/27/11
101SF Doyle Drive Rebar & Ruckman Bridge 04/27/11
d_005_small.jpg 9647 CC160 Antioch Construction, Bridge Concrete Cutting Prep 04/26/11
9647 CC160 Antioch Construction, Bridge Concrete Cutting Prep 04/26/11
d_001_small.jpg 9648 Sol84 Ryder Island Repaving Levy Road 04/26/11
9648 Sol84 Ryder Island Repaving Levy Road 04/26/11
d006_small.jpg 9644 Ala80 Oakland, SAS Tower Bike Path on Skyway 04/26/11
9644 Ala80 Oakland, SAS Tower Bike Path on Skyway 04/26/11
d114_small.jpg 9645 Ala880, Workers Memorial 2011 04/26/11
9645 Ala880, Workers Memorial 2011 04/26/11
d_001_small.jpg 9646 CC24 Orinda, Caldecott Tunnel Project 04/25/11
9646 CC24 Orinda, Caldecott Tunnel Project 04/25/11
d013_small.jpg 9642 Ala880 5th Ave Overcrossing, Stem and SOFFIT Concrete Pour 04/22/11
9642 Ala880 5th Ave Overcrossing, Stem and SOFFIT Concrete Pour 04/22/11
d003_small.jpg 9636 Ala880 High Street Replacement, Concrete Column Form Removal 04/22/11
9636 Ala880 High Street Replacement, Concrete Column Form Removal 04/22/11
d_001_small.jpg Son128 Geyserville, Russian River Aerials 4/21/11
Son128 Geyserville, Russian River Aerials 4/21/11
d015_small.jpg 9641 Ala880 Hayward 92 880 and EDB92 NB880 Connector Ramps 04/18/11
9641 Ala880 Hayward 92 880 and EDB92 NB880 Connector Ramps 04/18/11
d029_small.jpg 9633 CC680 San Ramon, Rehabilitation Project, 1st Slab Installation 04/18/11
9633 CC680 San Ramon, Rehabilitation Project, 1st Slab Installation 04/18/11
d009_small.jpg 9634 SF80 YBI Aerials, Transition Structure 04/15/11
9634 SF80 YBI Aerials, Transition Structure 04/15/11
d_145_small.jpg 9630 YBI Construction Update, Tower Grillage Lift, Placement 04/15/11
9630 YBI Construction Update, Tower Grillage Lift, Placement 04/15/11
d001_small.jpg 9626 SF80 San Francisco Aerials, Old Transbay Terminal Area 04/11/119626 SF80 San Francisco Aerials, Old Transbay Terminal Area 04/11/11
d001_small.jpg 9625 SM1 Pacifica, Devils Slide Tunnel 04/11/119625 SM1 Pacifica, Devils Slide Tunnel 04/11/11
d007_small.jpg 9627 CC24 Oakland Aerials, Caldecott Tunnel 4th Bore 04/11/119627 CC24 Oakland Aerials, Caldecott Tunnel 4th Bore 04/11/11
d015_small.jpg 9602 9621 CC4 Antioch Hw 4 Widening, Soundwall Install, Pile Driving at New Century Blvd 04/08/119602 9621 CC4 Antioch Hw 4 Widening, Soundwall Install, Pile Driving at New Century Blvd 04/08/11
d004_small.jpg 9622 CC4 Antioch Retrofit, Bearings Installed, Swallow Birds Nesting 04/08/119622 CC4 Antioch Retrofit, Bearings Installed, Swallow Birds Nesting 04/08/11
d007_small.jpg 9619 ALA80 Oakland, Saddle to Grillage Test Fit Pier 7 04/06/119619 ALA80 Oakland, Saddle to Grillage Test Fit Pier 7 04/06/11
d004_small.jpg 9615 SF101, Doyle Drive Tunnel Earthwork 04/06/119615 SF101, Doyle Drive Tunnel Earthwork 04/06/11
d001_small.jpg 9611 ALA880 Oakland Aerials 5th Ave Project 04/05/119611 ALA880 Oakland Aerials 5th Ave Project 04/05/11
d001_small.jpg 9612 ALA880 Oakland Aerials Hight Street 42nd Ave 04/05/119612 ALA880 Oakland Aerials High Street 42nd Ave 04/05/11
d003_small.jpg 9613 ALA880 Hayward Aerials 880 92 Interchange 04/05/119613 ALA880 Hayward Aerials 880 92 Interchange 04/05/11
d001_small.jpg 9610 SF101 San Francisco, Doyle Drive Aerials 04/05/119610 SF101 San Francisco, Doyle Drive Aerials 04/05/11
d011_small.jpg 9609 SF80 YBI, New East Span Aerials 04/05/11
9609 SF80 YBI, New East Span Aerials 04/05/11
d004_small.jpg 9606 ALA24 Oakland Construction Caldecott Tunnel 4th Bore 04/04/11
9606 ALA24 Oakland Construction Caldecott Tunnel 4th Bore 04/04/11
d012_small.jpg 9743d SCL 101 San Jose, Tully Road Overcrossing Paving 03/30/11
9743d SCL 101 San Jose, Tully Road Overcrossing Paving 03/30/11
d011_small.jpg 9604 ALA880 Garrett Morgan Sustainable Trans 03/30/11
9604 ALA880 Garrett Morgan Sustainable Trans 03/30/11
d005_small.jpg 9600 101 San Jose, Tully Road Overcrossing Pile Driving 03/30/11
9600 101 San Jose, Tully Road Overcrossing Pile Driving 03/30/11
d003_small.jpg 9599 Dumbarton Bridge Retrofit Overviews 03/30/11
9599 Dumbarton Bridge Retrofit Overviews 03/30/11
d007_small.jpg 9592 SF80 YBI Netherlands Infrastructure Tour 03/23/11
9592 SF80 YBI Netherlands Infrastructure Tour 03/23/11
d_003_small.jpg 9639 Son101 Petaluma Aerials, HOV Petaluma to Rohnert Park 03/21/11
9639 Son101 Petaluma Aerials, HOV Petaluma to Rohnert Park 03/21/11
d_001_small.jpg 9638 Son101 Rohnert park Aerials, Wilfred Interchange 03/21/11
9638 Son101 Rohnert park Aerials, Wilfred Interchange 03/21/11
d003_small.jpg 9591 SF80 YBI 4th Tower Lift Sheer Link Work 03/21/11
9591 SF80 YBI 4th Tower Lift Sheer Link Work 03/21/11
d003_small.jpg 9585 92/880 Reconstruction, New Falsework Overview 880 03/17/11
9585 92/880 Reconstruction, New Falsework Overview 880 03/17/11
d003_small.jpg 9588 Ala24 Caldecott 4th Bore Media Event 03/17/11
9588 Ala24 Caldecott 4th Bore Media Event 03/17/11
d003_small.jpg 9581 SF80 YBI Cross Beam Curtain Install Lift 4 03/15/11
9581 SF80 YBI Cross Beam Curtain Install Lift 4 03/15/11
d015_small.jpg ALA24 Oakland Construction Update, Portal Begin Tunneling 03/15/11
ALA24 Oakland Construction Update, Portal Begin Tunneling 03/15/11
d002_small.jpg 9578 SF Doyle Drive Tunnel Excavated to Lowest Point, Overviews 03/11/11
9578 SF Doyle Drive Tunnel Excavated to Lowest Point, Overviews 03/11/11
d098_small.jpg 101 Gap Closure Ribbon Cutting 03/11/11
101 Gap Closure Ribbon Cutting 03/11/11
d004_small.jpg 9572 SF80 YBI Bolting 11W to 10W 03/09/11
9572 SF80 YBI Bolting 11W to 10W 03/09/11
d019_small.jpg Isabel Interchange Over 580, Concrete Srtem & SOFFIT Concrete Pour 03/08/11
Isabel Interchange Over 580, Concrete Srtem & SOFFIT Concrete Pour 03/08/11
d001_small.jpg 9565 SF80 Abutment to Vermont & Terminal 03/07/11
9565 SF80 Abutment to Vermont & Terminal 03/07/11
d002_small.jpg 9564 ALA80 Oakland Aerials Touchdown Berma Rd. Shoreline 03/07/11
9564 ALA80 Oakland Aerials Touchdown Berma Rd. Shoreline 03/07/11
d002_small.jpg ALA880 Hayward Aerials, 880/92 Interchange 03/07/11
ALA880 Hayward Aerials, 880/92 Interchange 03/07/11
d002_small.jpg ALA880 Oakland Aerials AV_M Mehta 42nd Street to 5th Ave 03/07/11
ALA880 Oakland Aerials AV_M Mehta 42nd Street to 5th Ave 03/07/11
d002_small.jpg SM1 Pacifica Aerials, Devils Slide Tunnel Project Construction 03/07/11
SM1 Pacifica Aerials, Devils Slide Tunnel Project Construction 03/07/11
d002_small.jpg SF80 YBI Aerials Toll Bridge, New SAS and Transition Work 03/07/11
SF80 YBI Aerials Toll Bridge, New SAS and Transition Work 03/07/11
d002_small.jpg 880 High Street Replacement Project Overviews, Homeless Camp Removed 03/07/11
880 High Street Replacement Project Overviews, Homeless Camp Removed 03/07/11
d003_small.jpg Caldecott Tunnel 4th Bore Demo of Concrete Face, Oakland Side 03/07/11
Caldecott Tunnel 4th Bore Demo of Concrete Face, Oakland Side 03/07/11
d048_small.jpg Devils Slide Water Flows into Temp non-Storm Water Treatment System, BMPs 03/02/11
Devils Slide Water Flows into Temp non-Storm Water Treatment System, BMPs 03/02/11
d001_small.jpg YBI Tower Lift Leg 2 & 3 Views from T1 03/02/11
YBI Tower Lift Leg 2 & 3 Views from T1 03/02/11
d011_small.jpg SOL80 Vallejo Ceremony Reopening Hunter Hill Rest Stop 03/01/11
SOL80 Vallejo Ceremony Reopening Hunter Hill Rest Stop 03/01/11
d_006_small.jpg SF80 YBI Update Tower #4 1st Leg Lift 02/28/11
SF80 YBI Update Tower #4 1st Leg Lift 02/28/11
d014_small.jpg 92/880 Reconstruction Overviews 02/28/11
92/880 Reconstruction Overviews 02/28/11
d021_small.jpg Black History Month Celebration 2011 02/24/11
Black History Month Celebration 2011 02/24/11
d014_small.jpg Antioch Bridge Retrofit, Bearings Cross Beam Installation 02/23/11
Antioch Bridge Retrofit, Bearings Cross Beam Installation 02/23/11
d001_small.jpg Hwy 4 Widening, New Bridge at Century 02/23/11
Hwy 4 Widening, New Bridge at Century 02/23/11
d005_small.jpg ALA880 Oakland Aerials, 42nd Ave Replacement, High Street 02/22/11
ALA880 Oakland Aerials, 42nd Ave Replacement, High Street 02/22/11
d005_small.jpg ALA80 Oakland Aerials, 5th Street Crossing 02/22/11
ALA80 Oakland Aerials, 5th Street Crossing 02/22/11
d007_small.jpg SON101 Rohnert Park Aerials, Wilfred Interchange 02/22/11
SON101 Rohnert Park Aerials, Wilfred Interchange 02/22/11
d005_small.jpg Son Petaluma Aerials Construction How Widening Cotati 02/22/11
Son Petaluma Aerials Construction How Widening Cotati 02/22/11
d001_small.jpg ALA880 Oakalnd Touchdown to Mze Aerials 02/22/11
ALA880 Oakland Touchdown to Mze Aerials 02/22/11
d001_small.jpg SF80 YBI Aerials YBITs & SAS Projects 02/22/11
SF80 YBI Aerials YBITs & SAS Projects 02/22/11
d009_small.jpg 9537 Son128 Geyserville Aerials, Russian Rier Bridge 02/22/11
Son128 Geyserville Aerials, Russian Rier Bridge 02/22/11
d021_small.jpg West Dublin BART Station Ribbon Cutting 02/18/10
West Dublin BART Station Ribbon Cutting 02/18/10
d001_small.jpg I680 Rehab Project 02/16/11
I680 Rehab Project 02/16/11
d003_small.jpg Devil's Slide Tunnel Invert Rebar Install, Final Tunnel Wall Sample 02/09/11
Devil's Slide Tunnel Invert Rebar Install, Final Tunnel Wall Sample 02/09/11
d_001_small.jpg SF80 YBI Trans Structure Falsework 02/10/11
SF80 YBI Trans Structure Falsework 02/10/11
d_001_small.jpg SF80 Treasure Island Views of SAS 02/10/11
SF80 Treasure Island Views of SAS 02/10/11
d_010_small.jpg SF80 Aerials SAS and YBI Transition 02/28/11
SF80 Aerials SAS and YBI Transition 02/28/11
d_006_small.jpg ALA80 Oakland Touchdown Aerials 02/08/11
ALA80 Oakland Touchdown Aerials 02/08/11
d_001_small.jpg SF101 Doyle Drive Aerials 02/08/11
SF101 Doyle Drive Aerials 02/08/11
d166_small.jpg 880 High Street 42nd Ave Detour 02/07/11
880 High Street 42nd Ave Detour 02/07/11
d008_small.jpg 580 HOV Widening, from Fallon-El Charro Overcrossing 02/04/11
580 HOV Widening, from Fallon-El Charro Overcrossing 02/04/11
d076_small.jpg 101 Tully Groundbreaking 02/04/11
101 Tully Groundbreaking 02/04/11
d005_small.jpg Isabel Interchange, Stem & Soffit Form Install, Earthwork 02/04/11
Isabel Interchange, Stem & Soffit Form Install, Earthwork 02/04/11
d_001_small.jpg SF80 Treasure Island Sand Spill Cleanup 02/03/11
SF80 Treasure Island Sand Spill Cleanup 02/03/11
d001_small.jpg 5th Ave Oversrossing, Post Tensioning, Falsework Over Railroad 02/03/11
5th Ave Oversrossing, Post Tensioning, Falsework Over Railroad 02/03/11
d_063_small.jpg SF80 Dog Park & Beale Ceremony 02/03/11
SF80 Dog Park & Beale Ceremony 02/03/11
d_005_small.jpg ALA880 Oakland WTS Transbay Terminal 02/02/11
ALA880 Oakland WTS Transbay Terminal 02/02/11
d_019_small.jpg SF101 Doyle Drive Tunnel Work 01/20/11
SF101 Doyle Drive Tunnel Work 01/20/11
d001_small.jpg Caldecott Tunnel 4th Bore Canope Pipe Drilling 01/19/11
Caldecott Tunnel 4th Bore Canope Pipe Drilling 01/19/11
d_007_small.jpg SF101 Concrete pour Soffit 01/19/11
SF101 Concrete pour Soffit 01/19/11
d009_small.jpg Isabel Interchange, Rebar Installation 01/19/11
Isabel Interchange, Rebar Installation 01/19/11
d023_small.jpg Wilfred interchange, Concrete Deck Pour 01/14/11
Wilfred interchange, Concrete Deck Pour 01/14/11
d015_small.jpg Doyle Drive Traffic Switch on Ruckman Overcrossing, Overiews of Tunnel 01/10/11
Doyle Drive Traffic Switch on Ruckman Overcrossing, Overiews of Tunnel 01/10/11
d_003_small.jpg 128 Russian River Bridge @1300hrs 01/09/11
128 Russian River Bridge @1300hrs 01/09/11
d_005_small.jpg Son 101 Rohnert Park Aerials Construction, Wilfred inter & 101 So to Petaluma 01/09/11
Son 101 Rohnert Park Aerials Construction, Wilfred inter & 101 So to Petaluma 01/09/11
d_010_small.jpg CC4 Pittsburgh Aerials, Widening Loveridge to Antioch Br 01/09/11
CC4 Pittsburgh Aerials, Widening Loveridge to Antioch Br 01/09/11
d_069_small.jpg SF80 TBI Aerials, New East Span, Oakland 01/05/11
SF80 TBI Aerials, New East Span, Oakland 01/05/11
d_004_small.jpg SF101 Doyle Drive Aerials 1/5/11
SF101 Doyle Drive Aerials 1/5/11
d_005_small.jpg SM1 Pacifica Aerials, Devils Slide Tunnel, 01/05/11
SM1 Pacifica Aerials, Devils Slide Tunnel, 01/05/11