Photography Gallery 2012 |
12_10589d SOL 80 Fairfield Aerials Truck Scales 12/18/12 |
12_10585d SON 101 Petaluma Aerials 116 Lakeville 12/18/12 Petaluma River |
12_10588d SON 128 Geyserville Russian River Bridge 12/18/12 after rock work on North West corner of west abutment |
12_10587d SON 101 Santa Rosa Aerials at Airport Road 12/18/12 pre construction |
12_10586d SON 101 Rohnert Park Aerials 12/18/12 at Wilfred Interchange |
12_10584d SF 80 YBI Long View 12/18/12 East Span Replacement Project |
12_10591d SON 101 Rohnert Park Wilfred Ave Completed 12/18/12 |
12_10583d ALA 880 Oakland HQ Rail 12/14/12 Martin, rail equipment process, interior of Amtrak railcars |
12_10582d SM 101 Widening Aux Lanes 12/13/12 University to Embarcadero Road, completed. |
12_10575d SM 101 Marsh Rd to Univ Ave 12/11/12 widening Aux lanes completed |
12_10571d ALA 580 Aerials Altamont Pass East Bound Truck Climbing 12/06/12 |
12_10578d YBI Toll Bridge Aerials 12/06/12 |
12_10573d ALA 84 Newark Dumbarton Retrofit 12/06/12 installation, seismic upgrade. |
12_10570d SM101 Palo Alto Navarro Ribbon Cutting 12/5/12 101 widening aux lanes, March Road to Embarcadero Road. |
12_10569d SCL 880 Fremont HOT Lane 12/4/12 with traffic and toll. |
12_10566d SM 101 Mountain View 101 Widening 12/03/12 rebar install for barrier wall at Matadero Creek. |
12_10561d CC4 Antioch 4 Widening Retaining Wall 11/27/12 footing pour for pedestrian undercrossing |
12_10560d CC4 Antioch G Street Overcrossing 11/27/12 and creek re-alignment completed hydroseed application. |
12_10559d CC4 Antioch Hwy 4 Widening 11/27/12 demo of EB Somersville bridge earthwork. |
12_10558d 4 Antioch Widening Falsework 11/27/12 Installation for S/B Loveridge Road Bridge Earthwork |
12_10556d New East Span Briefing re Completed Load Transfer SAS 11/20/12 |
12_10542d ALA 80 Oakland Aerials Toll Bridge 11/16/12 |
12_10553d ALA 80 Oakland Touchdown 11/15/12 Cellular Cncrete Suffit Pour |
12_10554d ALA 80 New East Span Cable Wrapping 11/15/12 Verticle Cable Steam cleaning and painting. |
12_10551d Caldecott Tunnel Concrete Pour 11/14/12 Cover electrical conduit below roadway |
12_10550d SCL 880 San Jose Ground Breaking 11/9/12 Steven Creek Blvd |
12_10547d ALA 880 Oakland 5th Ave Overcrossing 11/07/12 Concrete Form Installation |
12_10537d SOL 12 Fairfield Aerials 11/06/12 Jameson Canyon Red Top to HWY 29 |
12_10538d SOL 80 Fairfield Aerials 11/6/12 EB Truck Scales |
12_10510d SF 101 Doyle Drive Groundbreaking w/Nancy Pelosi 10/15/12 |
12_10535d SM 101 San Carlos Smart Corridor 11/06/12 San Mateo County |
12_10529d 880 Oakland Calmentor Meeting 10/25/12 Networking |
12_10524_27d San Mateo-Hayward Bridge Deck 10/19-21/12 Replacement weekend closing. |
12_10520d SCL 880 San Jose Widening 237-101 concrete retaining wall 10/17/12. |
12_10498d SF 101 San Francisco Aerials Doyle Drive 10/8/12 Project |
12_10523d 80 Integrated Corridor Groundbreaking 10/8/12 Mobility Project. |
12_10500d ALA 80 Oakland Aerials Touchdown 10/8/12 to Maze |
12_10501d Ala 80 Emeryville Aerials 10/8/12 Repaved Maze to 580 Split |
12_10497d SM 1 Pacifica Devil's Slide Tunnel 10/8/12 Aerials |
12_10493d CC 4 Antioch Groundbreaking 10/5/12 Lone Tree and BART |
12_10490d ALA 880 Oakland Flavors of World Lunch 10/4/12 Event |
12_10484d ALA 92 Hayward San Mateo Bridge Briefing 9/28/12 on upcoming full closure to be done. |
12_10487d SF 80 YBI Load Transfer 9/27/12 |
12_10486d ALA 80 Oakland Toll Bridge Touchdown II 9/27/12 |
12_10477d SM1 Pacifica Devil's Slide Tunnel 9/24/12 paving final layer in front of south portal overviews of OMC building. |
12_10476D SOL 680 Benicia 50th Anniversary Benicia-Martinez Bridge 9/24/12 |
12_10468D Shuttle Endeavor Over SF Bay 9/21/12 |
12_10471d SOL 12 Fairfield Widening 9/20/12 aerials Red Top Road to HWY 29 |
12_10473d SON 101 Petaluma Aerials Pre-Consruction San Antonio to north side of river |
12_10474d SON 128 Geyserville Aerials 9/20/12 at Russian River |
12_10472d MRN 101 Novato Aerials 37 Interchange 9/20/12 north to Petaluma |
12_10474d SON 101 Rohnert Park Aerials Wilfred Interchange 9/20/12 final traffic alignment |
12_10454D CC 4 Pittsburg Widening 9/12/12 |
12_10456D Caldecott Tunnel 4th Bore S Whipple 9/12/12 |
12_10455D SOL 80 Fairfield Truck Scales Replacement 9/12/12 |
12_10451d ALA 880 Oakland Material Yard 9/7/12 880 BART, 5th Street Overcrossing. |
12_10452D ALA 880 Oakland High Street 42nd Ave Overcrossing Replacement 9/7/12 |
12_10446d ALA 80 Oakland Aerials Touchdown Toll Plaza 9/7/12 |
12_10447d SM 1 Pacifica Aerials Devil's Slide Tunnel 9/7/12 |
12_10449d SF 80 YBI Aerials Transation and SAS 9/7/12 |
12_10448D SF 80 Aerials Fremont, 5th Street 9/7/12 8th Street, Rincon Hill and Bryant Dog Park |
12_10450D Sw Tooth Building off Berma Road |
12_10443d SCL 152 Gilroy 152 Widening 9/6/12 just prior to concrete WB pour. Concrete drain pipe pour. |
12_10445d SF 80 YBI SAS Load Transfer 9/6/12 |
12_10441d Dumbarton Bridge Retrofit 8/31 - 9/3/12 expansion joint replacement |
12_10435d SON 101 Rohnert Park 101 Widening Ribbon Cutting 8/31/12 |
12_10429d SF 80 Beale Street Dog Park 8/28/12. |
12_10430d YBI Transition Structure End 8/28/12 of east bound deck pour,
. |
12_10428d ALA 80 Oakland Touchdown Progress 8/28/12
. |
12_10426_27d SCL 101 Widening, University 8/27/12 demo of overcrossing at an unknown creek, vegetation removed. |
12_10425d SM92 92/280 Sandblastiing Overviews 8/27/12 Collumn footing. |
12_10420d SOL 12 Fairfield Improvements 8/21/12 I80 to HWY 29 |
12_10415d Marin Sonoma Ribbon Cutting 8/15/12 |
12_10396d ALA 580 Dublin Aerials Foothill to Greenville to Base of Altamont 8/8/12 |
12_10400d SM 1 Pacifica, Devil's Slide Project Aerials 8/8/12 |
12_10397d Sol 80 Davis Aerials 8/8/12 Yolo County Line to Leisure Town Road, Vacaville. |
12_10398d SOL 80 Fairfield EB Truck Replacement 8/8/12 |
12_10401d SF 101 Presidio Parkway Aerials 8/8/12 |
12_10399d SOL12 Fairfield Aerials 8/8/12 Jameson Canyon Safety Improvelents 80 to 29 |
12_10403 Alameda 80 Oakland (Toll Bridge) 08/08/2012 |
12_10402 San Francisco 80 Yerba Buena Island 08/08/2012 |
12_10395 San Francisco 101 San Bruno 100th Aniv. State Highway Contract 08/07/2012 |
12_10393d Innovation Fair 2012, Caltrans Oakland 8/7/12 |
12_10394 Alameda 880 San Leandro 8/7/12 |
12_10392d Ala 24 Oakland Caldecotte Tunnel 4th Bore 8/1/12 Bench cut completion. |
12_10387d ALA84 Livermore Widening Groundbreaking 7/26/12 |
12_10389d SF 80 Toll Bridge Regment Erection Removal 7/25/12 Cradle 14E & Scenic Views |
12_10377d Oakland New East Span Concrete Piile Driving Touchdown 7/16/12 |
12-10374d DF80 Oakland New East Span, Skyway Lighting test 7/12/12 |
12_10372-73d SF Doyle Drive Tunnel After SKyway Demo, deconstruction of building #203 future pumphouse, Toll Plaza to 19th Ave prior to Striping 7/10/12. |
12_10371d ALA 24 Oakland Caldecott Tunnel 4th bore OMC building 07/09/12 |
12_10369d SCL880 San Jose Widening overviews 101 to 237, soil nail wall drilling concrete barrier wall pour, Red Tail Hawk nest. 7/3/12 |
12_10367d SM 92/880 San Mateo Interchange Concrete Colum Pour foundation drilling 7/2/12 |
12_10366d ALA880 Oakland 5th Ave Overcrossing, new falsework over railroad 7/2/12 |
12_10364d Devil's Slide Tunnel Progress 7/2/12 |
12_10361d ALA80 Khachian Radio Road Construction 06/27/12 |
12_10359d SF101 Doyle Drive Cemetery Fence Progress 06/27/12 |
12-10355d CC4 Brentwood Widening Ribbon Cutting at Sand Creek 06/22/12 |
12_10354d SOL12 Earthwork Retaining Wall 06/21/12 |
12_10353d SOL80 EB Truck Scales Earthwork 06/21/12 |
CC4 Antioch Hwy 4 Widening, Loveridge Road demo |
12_10341d SON101 N Washington Street 06/19/12 |
12_10340d MRN101 Larkspur 06/19/12 |
12_10344d SON128 Russian River Bridge 06/19/12 |
12_10338d SF101 Presidio PKWY Aerials to Waldo Tunnel 06/19/12 |
12_10336d ALA80 Oakland Cable Paint Test Pier 7 06/18/12 |
12_10335d SF101 Presidio Cemetary 06/15/12 |
12_10334d Son101 Rohnert Park Ribbon Cutting 06/15/12 |
12_10332d SCL101 San Jose, Tully Rd Overcrossing Ribbon Cutting 06/15/12 |
12_10357d SF80 TBI Bidders Conference for East Span Demo 06/14/12 |
12_10337d SF101 Presidio Parkway Tunnel 06/14/12 |
12_10330d SOL12 Fairfield Aerials 12 Widening 06/13/12 |
12_10329d SOL80 Fairfield Aerials New EB 80 Truck Scales 06/13/12 |
12_10328d CC4 Pittsburgh 4 Widening Aerials 06/13/12 |
12_10324d ALA880 Hight Street NB Concrete Pour Oakland 06/11/12 |
12_10325d SM92_280 Retrofit Concrete Pour Foundation Drilling 06/11/12 |
12_10326d SM101 101 Widening Landscaping Near Pedestrian Crossing 06/11/12 |
12_10333d SF80 YBI Suspener Cables 06/11/12 |
12_10321d SF80 YBI Suspender Cable Install 06/07/12 |
12_10320d SF101 Doyle Drive Aerials 06/06/12 |
12_10318d ALA80 Oakland Touchdown Aerials 06/06/12 |
12_10317d SN1 Pacifica Aerials Devils Slide Project 06/06/12 |
12_10315d 101 San Jose Aerials Tully Road Interchange 06/06/12 |
12_10331d ALA80 Oakland to San Leandro Aerials 06/06/12 |
12_10316d ALA880 Hayward Aerials 92 Interchange 06/06/12 |
12_10319d SF80 YBI Aerials 06/06/12 |
12_10313d SCL101 San Jose Tully Road Overcrossing, Concrete Median Pour 06/05/12 |
12_10314d SF1 Pacifica Devils Slide Shotcrete Pour SP 06/05/12 |
12_10309d SF80 YBI Construction 05/31/12 |
12_10308d 880 Oakland Asian Pacific Rim Event 05/31/12 |
12_10295, 296, 302, 304d Dumbarton Bridge Pier 16 Expansion Joit 05/29/12 |
12_10305d ALA84 Newark Retrofit Pier 16 Day 3 05/28/12 |
12_10297d ALA84 Newark Retrofit Seismic Joint Installation Pier 16 05/26/12 |
12_10298d ALA84 Newark Maintenance Activity During Closure 05/26/12 |
12_10299d ALA84 Newark 05/26/12 |
12_10294d ALA880 Oakland High Street Prior to Stem Concrete Pour 05/24/12 |
12_10290d SCL San Jose, Tully Road Overcrossing Prior t Striping 05/21/12 |
12_10288d SF80 YBI Cable Bands People at Work 05/17/12 |
12_10285d SF80 Bronze Plaques 5th Street Constructions 05/16/12 |
12_10280, 81, 82d CC4 Antioch Widening After Falsework Removal Loveridge Rd 05/12/14 |
12_10283d SOL80 Cordelia, EB Truck Scales 05/14/12 |
12_10284d SOL12 Cordelia Widening K-Rail and Earthwork 05/14/12 |
12_10274d SF101 Doyle Drive, Post Demo Old Structure 05/09/12 |
12_10275d ALA880 Oakland, Bike to Work Day Event 05/09/12 |
12_10271d ALA24 Oakland, Caldecott 4th BoreAfter Final Lining Outside 05/08/12 |
12_10272d SM92_880 San Mateo Rebar Installation, Column Casting 05/08/12 |
12_10270d SM101 Menlo Park, Widening, New Pedestrian Crossing (POC) Completed 05/08/12 |
12_10314d SF1 Pacifica Devils Slide Shotcrete Pour SP 06/05/12 |
12_10265d SF1 Pacifica, Devil's Slide Tunnel Shotcrete Pour SP 05/01/12 |
12_10269d SF101 Doyle Drive Ceremony 05/04/12 |
12_10262d SF101 Doyle Drive Detour 1st Day Traffic 04/30/12 |
12_10260d ALA80 Aerials Oakland Touchdown and Toll Plaza 04/29/12 |
12_10259d SF80 YBI Aerials Transition and SAS 04/29/12 |
12_10255d SF101 Doyle Drive Detour Work 04/29/12 |
12_10261d ALA80 Oakland Aerials, 5th to High Street 04/29/12 |
12_10256d SF101 Aerials, Doyle Drive Detour 04/29/12 |
12_10250_52d SF101 Doyle Drive Demo Compilation 04/27-29/12 |
12_10254d SF101 SF Demo of Doyle Drive 04/28/12 |
12_10253d Doyle Drive Demo Aerials 0630Hours 04/28/12 |
12_10257d SF101 Site Doc Thursday Prior to Demo 04/26/12 |
12_10241d ALA880 Oakland, Workers Memorial 4/24/12 |
12_10246d Sol101 Petaluma Aerials, 101 to 37 to Wilfred in Rohnert Park 04/24/12 |
12_10245d SF101 Aerials Pre Demo and Traffic Detour 04/24/12 |
12_10247d SON128 Geyserville, Russian River Bridge 04/24/12 |
12_10248d Napa12 Aerials, HWY 29 to 80 04/23/12 |
12_10243d SF80 YBI Cable Compaction 04/23/12 |
12_10242d SF101 Equip-Delivery Staging for Demo 04/23/12 |
12_10232_34d SF1 Devils Slide S_B Last Concrete Roadway Pour 04/20/12 |
12_10240d SOL80 Cordelia Groundbreaking Ceremony 04/20/12 |
12_10238d SF101 Fire System Testing Tunnel 04/19/12 |
12_10237d SF101 Doyle Drive Tunnel Demo 04/19/12 |
12_10239d SF101 Asbestos Removal Prior to Demo Sidewalk 04/19/12 |
12_10230d SF80 YBI Transition Structure 04/16/12 |
12_10229d SF80 YBI Start Cable Compact SAS 04/16/12 |
12_10219d ALA24 Oakland Caldecott 4th Bore Waterproofing 04/09/12 |
12_10218d Antioch Bridge Last Bearing Pier 41 04/09/12 |
12_10231d CC4 Antioch Bridge Retrofit Ceremony 04/09/12 |
12_10221d SF80 YBI Saddle Compl. All 137 Strands in Place 04/06/12 |
12_10216_17d SF101 Erosion Control Barrier 04/06/12 |
12_10215d 80 YBI Last Strand 137 Pulled Wire Splicing 04/05/12 |
12_10214d 80 YBI Cable Strand Install to 134 04/04/12 |
12_10213d ALA80 Oakland Demo of WB 80 East Span 04/04/12 |
12_10212d ALA880 Oakland Aerials 5th and High Street 04/04/12 |
12_10211d SF101 Aerials Doyle Drive 04/04/12 |
12_10210d ALA80 Oakland Touchdown Aerials 04/04/12 |
12_10209d SF80 YBI Aerials YBITS and SAs 04/04/12 |
12_10208d SM1 Pacifica Aerials Devils Slide Project 04/04/12 |
12_10206d ALA880 Oakland High Street Rebar Cage 2nd Lift Install 04/04/12 |
12-10207d Napa12 Fairfield Jamison Canyon Groundbreaking 04/04/12 |
12_10203d CC4 Antioch @ Loveridge Rd Overviews 04/02/12 |
12-10200d Ala580 Livermore Isabel Interchange Ribbon Cutting 03/30/12 |
12_10201d SF80 Yerba Buena Island, Storm Water Controls 03/29/12 |
12_10198d SF80 YBI SAS Cable 121 of 137 Catwalk 03/29/12 |
12_10196d SF101 Doyle Drive Project 03/28/12 |
12_10197d SF80 Yerba Buena Island Transition Structure EB Falsework 03/28/12 |
12-10193d Ala84 Newark Dumbarton Bridge Retrofit, Styrofoam Block Pier 23 03/26/12 |
12-10186d Ala880 Oakland 5th Ave Overcrossing Pile Welding 03/22/12 |
12_10187d Ala880 Oakland High Street CIDH Rebar Cage Concrete Pour 03/22/12 |
12_10190d 80 YBI Transition Structure 03/22/12 |
12_10189d SF80 YBI SAS Cable Install 03/22/12 |
12_10183d Ala880 Oakland High Street Overviews 03/20/12 |
12_10188d ALA80 Oakland Cable Wrapping Equip Test Pier 7 03/21/12 |
12_10178d ALA880 Oakland D.O. Persian New Years Celebration 03/15/12 |
12_10169d SCL101 Menlo Park Widening Retaining Wall Pour 03/12/12 |
12_10182d ALA80 Oakland New Admin Building Ribbon Cut 03/19/12 |
12_10168d SCL101 San Jose Tully Rd. Overcrossing Painted Onramps 03/12/12 |
12_10171d MRN101 Novato 101 Widening and HOV Addition 03/09/12 |
12_10172d SON101 Petaluma Washington St., New North Bound Ramp 03/09/12 |
12_10173d SON101 Petaluma Widening to Cotati 03/09/12 |
12_10167d CC4 Antioch Widening, Contra Loma Groundbreaking 03/09/12 |
12_10164d CC4 Pittsburgh Aerials S Whipple Loveridge to Bypass 03/07/12 |
12_10163d ALA24 Oakland Caldecott Aerials 03/07/12 |
12_10161d SM1 Pacifica Aerials, Devils Slide 03/07/12 |
12_10160d SON116 Safety Improvements 03/06/12 |
12_10159d Napa12 Completed Safety Improvements 03/06/12 |
12_10158d SOL80 Fairfield EB80 Truck Scales Signage 03/06/12 |
12_10155d SF80 YBI EB False Work 03/05/12 |
12_10157d CC4 Antioch Widening Soundwall Install 03/05/12 |
12_10154d SF80 YBI Main Cable 79 03/05/12 |
12_10156d CC4 Antioch Widening Deck Pour, Loveridge Rd 03/05/12 |
12_10150d ALA880 Oakland D.O. Activity 03/02/12 |
12_10151d SF101 Installation of VMS Sign 03/02/12 |
12_1044d SF80 YBI Cable Measuring 02/28/12 |
12_10145d ALA880 Oakland High Street Concrete Abutment Pour 02/28/12 |
12_10146d ALA24 Oakland Caldecott Tunnel Overviews 02/28/12 |
12_10143d SOL12 Fairfield Widening to Napa 02/27/12 |
12_10141_42d SF101 Doyle Drive New Lighting and Burlap 02/24/12 |
12_10140d SF80 YBI SAS Main Cable to 57 02/23/12 |
12_10136 ALA80 Oakland OTD II Detour Tuesday Morning 02/22/12 |
12_10130d Ala80 Oakland Aerials Touchdown Toll Plaza 02/20/12 |
12_10131d Ala880 Oakland Aerials 5th Ave and High Street 02/20/12 |
12_10133d ALA80 Oakland, Opening to Traffic 02/19/12 |
12_10127d ALA80 Oakland Aerials Toll Bridge Post Demo Steel Supports 02/19/12 |
12_10129d SF80 YBI East Span Views Upper Deck 02/19/12 |
12_10134d Ala80 Oakland Aerials OTDII Detour Before Opening with Striping 02/19/12 |
12_10114d ALA80 Oakland Touchdown Detour, K-Rail 02/19/12 |
12_10123d Ala80 Oakland Aerials Touchdown 02/18/12 |
12_10125d Ala80 Oakland OTD Work Evening Paving Demo BATA 02/18/12 |
12_10124d ALA80 Oakland Aerials Upper Deck Full Closure 02/18/12 |
12_10128d ALA80 Oakland Aerials 2700ft OTD to Marina Grand 02/18/12 |
12_10112 12_10113 ALA80 Oakland Touchdown Detour, Methacrylate Paving Press 02/18/12 |
12_10120d Ala80 Oakland OTD Detour Work Friday Night 02/17/12 |
12_10117d ALA80 YBI SAS Transition Aerials 02/17/12 |
12_10107d ALA80 Oakland Touchdown Detour Work 02/14/12 |
12_10108d ALA80 Oakland Cable Compaction Pier 7 02/14/12 |
12_10101d CC4 Brentwood Hwy4 Bypass Transfer Relinquishment Ceremony 02/13/12 |
12_10103d SF80 Rincon Hill Dog Park Opening 02/11/12 |
12_10102d ALA80 Oakland Touchdown Concrete Barrier Form Install 02/10/12 |
12_10122_26d ALA80 Oakland Maintenance wBridge Closure 02/09-18/12 |
12_10100d SF80 YBI SAS Cable Install 02/09/12 |
12_10097d ALA880 Newark, Dumbarton Retrofit Prior to Footing Pour 02/08/12 |
11_10099d SCL101 San Jose Tully Rd WB Overcrossing 02/06/12 |
12_10091d SF101 Doyle Drive VA Cemetery Fence at Michael Bondi's Studio 02/03/12 |
12_10093d ALA880 Oakland Aerials, 880 @ 5th Ave 02/02/12 |
12_10089d ALA80 Oakland Touchdown Aerials 02/02/12 |
12_10088d SF80 YBI Aerials SAS Transition Structure 02/02/12 |
12_10087d SF80 Aerials Westbay Terminal 02/02/12 |
12_10083d SF101 Aerials, Doyle Drive Traffic @ 0900 Hrs 02/02/12 |
12-10082d SM1 Pacifica, Devils Slide Tunnel Aerials 02/02/12 |
12_10084d MRN1 Bolinas Bay Aerials, Shoreline Maintenance Improvements 02/02/12 |
12_10079d CC4 Widening Concrete Form and Retaining Walls Pour, Earthwork 02/01/12 |
12_10078d SF1 Pacifica, Devils Slide Concrete Roadway Pour w/Media 01/30/12 |
12_10075d ALA880 Oakland, 880 High Street, CIDH Pile Cage Concrete Pour 01/30/12 |
12_10076d SCL101 Menlo Park, 101 Widening Overviews 01/30/12 |
12-10071b SF80 YBI Main Cable SAS Strands 8-9and10 01/28/12 |
12_10072d SF101 San Francisco, Doyle Drive Project 01/27/12 |
12_10066d ALA24 Oakland, Caldecott Tunnel Cross Path Concrete Shotcrete pour 01/25/12 |
12_10058d SF80, San Francisco, Ricon Hill Dog Park Completion 01/17/12 |
12_10057d SF101 Doyle Drive Tunnel Prior to Outside Concrete Pour 01/17/12 |
12_10060d SF80 Cable Fab 1,2 placed adj 3,5 pulled 01/19/12 |
12_10049d ALA880 High Street Replacement, Demo Old NB Structure 01/09/12 |
12_10046d SF80 YBI 2nd Strand Install @ W2 01/16/12 |
12_10053d SF80 YBI SAS Cable Work 1st 2nd Strands 01/05/12 |
12_10045d ALA880 Aerials 5th and High Streets 01/04/12 |
10041d ALA80 Oakland Aerials, Touchdown 01/04/12 |
10044d SF80 YBI Aerials, SAS YBI Transition, OTD 01/04/12 |
10039d SF101 Doyle Drive Project Aerials, 01/04/12 |
10038d SM1 Devils Slide Tunnel Aerials, Pacifica 01/04/12 |
10037d Sol80 Dixon Site Doc, Traffic Controls, Loops 01/13/12 |
10036d Sol80 Cordelia Site Doc, Truck Scale Location 01/03/12 |
Photography Gallery 2011 |
10031d SAS YBI 1st Pull East Line 12/22/11 |
10030d SF80 YBI SAS Strand Pull Main Cable 12/21/11 |
10029d ALA80 Emeryville Site Art Sculpture @ Powell 12/20/11 |
10027d CC580 Richmond, Scofield Ave 12/20/11 |
10028d MRN101 Sausalito, Golden Gate to Lucky Drive 12/20/11 |
10026d SF80 YBI Main Cable Pull and Set Up 12/19/11 |
10021d ALA80 Oakland Touchdown 12/15/11 |
10022 SF80 YBI Pulling Frame and Related Test 12/15/11 |
10013d Oakland Touchdown Bidders Conference 12/13/11 |
10015d16 CC4 Antioch, Hwy 4 Widening, Rebar Install Loveridge Rd 12/12/11 |
10009d ALA880 Newark, Dumbarton Bridge Retrofit, Horiz Bar Install 12/06/11 |
SF80 Aerials SAS, YBI Transition 12/02/11 |
10006d ALA80 Oakland Aerials Touchdown, Towing Service Building 12/02/11 |
10003d MRN1 Bolinas Bay Shoreline Aerials 12/02/11 |
10002d SF101 Doyle Drive Aerials 12/02/11 |
9997d ALA880 Oakland, High Street Overviews Before Traffic Switch 12/02/11 |
9998d SJ280 San Jose Aerials 280/880/17 and Stevens Creek 12/02/11 |
10000d SM1 Pacific Aerials, Devil's Slide 12/02/11 |
9999d SM280 San Mateo Aerials @80 92 Crystal Springs 12/02/11 |
10001d SF1 San Francisco Aerials, Mountain Lake 12/02/11 |
9994d SF101 Falsework Removed From Pet Cemetary, Tunnel Guardrail Lighting Instalation 12/01/11 |
9993d ALA80 Oakland Key Ceremony, New Tow Service Bldg 12/01/11 |
9987d ALA880 Oakland High Street, Demo of NB Roadway 11/29/11 |
9988d ALA24 Oakland, Caldecott 4th Bore Break Through 11/29/11 |
9986d ALA880 Oakland, 5th Ave Overcrossing, Pile Welding 11/29/11 |
10008d SCL101 San Jose Tully Road Overcrossing 11/23/11 |
9985d ALA24, Caldecott Tunnell Invert Shotcrete Bench 11/23/11 |
9981d SCL101 San Jose, Tully Overcrossing Post Tension 11/23/11 |
9984d YBI New East Span YBITS Overviews from YBI 11/22/11 |
9982d SF80 Ricon Hill, Dog Park overviews 11/22/11 |
9983d SF80 YBI New East Span, PWS Anchor Rod Installation 11/22/11 |
9973d CC160 Antioch Bridge Aerials 11/16/11 |
9976d ALA680 San Ramon Aerials, S Whipple Rehab San Ramon-Walnut Creek 11/16/11 |
9975d CC580 Livermore Aerials Altamont to Vasco 11/16/11 |
9978d ALA880 Oakland Aerials 5th to High Street 11/16/11 |
9977d CC24 Orinda Aerials, Caldecott Tunnel 11/16/11 |
9972d CC4 Pittsburg Aerials Widening Project 11/16/11 |
9970d SF101 Ruckman Bridgepost demo of old bridge, pre falsework girders removed from Pet Cemetary, Waterproofing Tunnel 11/16/11 |
9969d ALA80 Oakland Construction Update, SAS setup for main cable 11/15/11 |
9966d CC4 Antioch, HWY 4 Widening, Falsework Installation @ Loveridge Road, Earthwork 11/15/11 |
9965d ALA880 Newark, Dumbarton Bridge Retrofit from a boat drilling holes for rebar and grinding pier footing, 11/14/11 |
9964d ALA880 Oakland, 880 High Street Replacement, After Traffic Switch of S/B 880 11/14/11 |
9959d SF80 Treasure Island Ceremony SAS Interpretive Sign Unveiling 11/10/11 |
9958d SF80 Treasure Island Ceremoney 75th Anniversery SFOBB 11/10/11 |
9961d ALA880 Oakland, 5th Ave Overcrossing, Demo of Old S/B 880 Roadway 11/09/11 |
9960d ALA580 Livermore, I/C Completed with out Traffic 11/09/11 |
9955d SF80 YBI Toll Bridge, Concrete Pour YBI Transition 11/08/11 |
9954d SF80 YBI Cable Installation Equipment W2 11/08/11 |
9950d ALA880 Oakland, High Street Replacement, After Parial Paving Of Approaches 11/04/11 |
9951d SF1 Pacifica, Devils Slide Tunnel OMC Building, Shotcrete Wall Pour North Side Of HWY 1 11/04/11 |
9950d ALA880 Oakland, High Street Replacement, After Parial Paving Of Approaches 11/04/11 |
9941d SM1 Pacifica Aerials, Devil's Slide Tunnel 11/02/11 |
9945d SF80 YBI Aerials, New East Span, 11/02/11 |
9242d SF101 San Francisco Aerials, Doyle Drive Project 11/02/11 |
9944d SF101 San Francisco Aerials, Dog Park 2d Street 11/02/11 |
9943d MRN1 Bolinas Aerials, Maint C. Morton Bolinas Bay Alt 750' 45 Degrees 11/02/11 |
9946d ALA24 Oakland Aerials, Caldecott Tunnel 11/02/11 |
9940d SM92 Foster City Aerials, San Mateo Bridge, East End Of H.R. 11/02/11 |
9937d SF101 Doyle Drive, Falsework Removed, Seismic Joint Assembly Installation 10/31/11 |
9947d SCL 101 SanJose, Tuly Road Overcrossing, Storm Drain Pipe Installation 10/28/11 |
9931d ALA880 Newark Dumbarton Bridge Retrofit, Rebar Installation Core Drilling 10/26/11 |
9930d SF80 YBI SAS & Install Last Cross Beam 10/25/11 |
9928d ALA880 Oakland, Media Event with Senator Barbara Boxer 10/25/11 |
9920d SF80 YBI Aerials, Install 14W, Views From Port Of Oakland 10/19/11 |
9927d CC4 Antioch Bridge Retrofit, Jacking Up Bridge at Pier 11 10/11/24 |
9925d ALA61 Oakland, San Leandro, Alameda 11/10/20 |
9919d ALA880 Oakland D.O. Activity Diversity Day - Employees 10/18/11 |
9916d SM1 Pacifica Aerials, Devil's Slide Project 10/14/11 |
9917d SM92 Aerials, Foster City, End Of High Rise 10/14/11 |
9912d ALA80 Oakland Aerials, Touch Down and Toll Plaza 10/14/11 |
9818d ALA880 Hayward Aerials 880/92 Interchange 10/14/11 |
9915d SF101 Aerials, Doyle Drive Project 10/14/11 |
9914d SF80 San Francisco Aerials, Dog Park and Old Transbay 10/14/11 |
9913d SF80 YBI Aerials and Toll Bridge 10/14/11 |
9909d CC4 Antioch, HWY 4 Widening before Somersville Road Overcrossing, Concrete Deck Pour 10/13/11 |
9908d Overviews Earthwork @ Loveridge RD 10/13/11 |
9895d ALA 92 880 Hayward Ribbon Cutting 10/07/11 |
9890d SF80 YBI New East Span, SAS Segment 13E Lift 09/27/11 |
9876d SF80 YBI Aerials, New SAS and Lift 13W 09/22/11 |
9883d SF80 YBI Construction, Cross Beam Place 13W-13E 09/22/11 |
9886d ALA9887d ALA880 Oakland, 880 High Street Replacement Project 09/22/11 |
9886d ALA 92/880 Hayward Reconstruction Overviews 09/22/11 |
9882d MRN1 Bolinas Ceremony Improvement 5.5 to 17.0 09/21/11 |
9899d Son101 Rohnert Park Aerials, Wilfred Exchange 09/20/11 |
9901d MRN101 Novato Aerials, 101-37 Interchange and Widening 09/20/11 |
9881d SF101 Aerials Doyle Drive Tunnel 09/20/11 |
9879d Son128 Geyserville Aerials, 128 Russian River Bridge 09/20/11 |
9878d Son1 Bodega Bay Aerials to Point Aera 09/20/11 |
9874d ALA880 Hayward Aerials 880/92 Interchange 09/20/11 |
9877d MRN1 Bolinas Bay Aerials 09/20/11 |
9873d ALA 92/880 Hayward Reconstruction Overviews 09/14/11 |
9904d SF80 YBI Aerials, Last Cable Saddle Install 13E 09/13/11 |
9870d ALA24 Oakland, Caldecott Tunnel, Shotcrete Tunnel Wall, Air Monitoring 09/13/11 |
9869d SF101 San Francisco, Doyle Drive Project Update 09/12/11 |
9862d SF1 Pacifica, Devils Slide, Painting North Portal SB Tunnel, Overviews 09/08/11 |
9868d SF80 YBI Tensioning Tower Pull Back 09/08/11 |
9859d SF80 YBI Aerials Toll Plaza to YBI New East Span 09/07/11 |
9860d SF80 San Francisco Aerials, Touch Down to Central Fwy 09/07/11 |
9867d ALA880 Oakland Aerials 5th Street Overcrossing 09/07/11 |
9858d ALA80 Oakland Aerials, Maze Approaches to Bay Bridge 09/07/11 |
9861d SF101 Doyle Drive Aerials 09/07/11 |
9853d ALA880 Oakland, 880 High Street Replacement Prior to SB 880 Pour 08/30/11 |
9854d ALA880 Oakland, 5th Ave Overcrossing Removal SB 880 Girders 08/30/11 |
9851d SF80 Treasure Island, 1st Lighting Catwalks SAS 08/29/11 |
9849d ALA80 Oakland, Unloading Zen Hoa 19 Pier 7 08/29/11 |
9848d SM101 Menlo Park Storm Drain Demo 08/29/11 |
9845d MRN101 Novato HOV 37 North 08/26/11 |
9846d SON101 Rohnert Park, 101 Widening, Wilfred Interchange 08/26/11 |
9840d SM1 Pacifica Aerials Devil's Slide Tunnel Project 08/23/11 |
9838_39d SF101 Doyle Drive, San Francisco, Hands Working with Tools, Concrete Pour 08/22/11 |
9837d Ala880 Oakland High Street after 1st Deck Pour 08/19/11 |
9836d ALA880 Oakland, 5th Ave After SB Traffic Switch 08/19/11 |
9834d ALA Oakland, Health, Safety and Transportation Awareness Fair 08/17/11 |
9831d SL101 San Jose, Tully Road Overcrossing after Traffic Switch, Pile Driving 08/16/11 |
9827d SF80 New East Span, Shearky and Bearing Intalled @ E2 08/12/11 |
9828d ALA880 Oakland, High Street Replacement Just Before Deck Pour 08/12/11 |
9775d SF80 Ricon Hill Dog Park Overviews 08/12/11 |
9889d SF80 Oakland, Touchdown Detour Overviews 08/09/11 |
9825d ALA92/880 Hayward, wb92 to sb880 Connector Ramp Opened 08/09/11 |
9821d ALA880 Oakland Aerials, High Street 5th Ave Replacement 08/04/11 |
9822d ALA80 Oakland Aerials Toll Plaza to New East Span 08/04/11 |
9819 ALA92_880 Hayward wb92 to sb 880 Connector Ramp Just Priod to Opening 08/04/11 |
9817d ALA880 Oakland, High Street, Concrete Replacement Stem and Soffit Pour 08/04/11 |
9823d SF101 Aerials, Doyle Drive Replacement 08/04/11 |
9829d SF80 YBI SAS, Pull Back Sys and Cat Walks 08/03/11 |
9809d MRN101 Widening Novato Aerials @ HWY37 Repaving 08/02/11 |
9807d SF80 YBI Aerials Transition Concrete Pour 08/02/11 |
9811d SON101 Rohnert aprk Aerials, Wilfred Interchange 08/02/11 |
9809d MRN101 Novato Aerials, HWY 37 Widening Repaving 08/02/11 |
9814d 9815d CC4 Antioch, Earthwork, Rebar and Soundwall at Loveridge Rd 08/02/11 |
9810d Son101 Petaluma Aerials, Rohnert Park 08/02/11 |
9813 MRN 1 Bolinas Aerials, Maintenance Activities 08/02/11 |
9812d Son128 Geyserville Aerials, Russian River Bridge 08/02/11 |
9806d Sol37 Vallejo Aerials, Napa River to 101 Novato 08/02/11 |
9804d SF80 YBI SAS Catwalks and Pull Back Sys. 08/01/11 |
9805d SF80 Dog Park amp; 5th Street 08/01/11 |
9802 9801d SF101 Doyle Drive Falsework Installation, Concrete Wall Pour 07/29/11 |
9794d Ala880 Oakland High Street 07/27/11 |
9793d Ala880 Oakland Overcrosssig 5th Ave, After SB Ramp Traffic Switch 07/27/11 |
9799d Son101 Widening Petaluma to Rohnert Park 07/26/11 |
9797d Hwy 37, MRN Novato 07/26/11 |
9792d ALA580 Livermore, Isabel Interchange over HWY, 580 Post Falsework Removal, Paving 07/25/11 |
9790d SF80 YBI SAS Update 07/22/11 |
9789d SF80 YBI YBITS 1st Concrete Pour Transition 07/22/11 |
9787d ALA880 Hayward 92_880 Reconstruction Project 07/20/11 |
9786d SM101 Menlo Park, HOV 101 Widening Groundbreaking Ceremony 07/20/11 |
9779d SJ4 Stockton, Calmetor Protege Appreciation Ceremony 07/15/11 |
9780d SON 128 Healdsburg, Maacama and Redwood Bridges 07/13/11 |
9778d MRN101 Novato, Marin Sonoma Narrows Widening Groundbreaking 07/14/11 |
9772d SF80 New East Span Touchdown, Pile Driving 07/12/11 |
9776d Move Over Law Press Conf 07/11/11 |
9764, 9765d SON 128 Healdsburg Redwood Creek Bridge Replacement, Protection of Creek Water 07/01/11 |
9761d Ala80 Oakland Aerials, Touchdown 06/29/11 |
9762d ALA880 Oakland Aerials 5th & 42nd Ave 06/29/11 |
9759d SF101 Aerials, Doyle Drive Project 06/29/11 |
9758 SM1 Pacifica Aerials, Devil's Slide Tunnel 06/29/11 |
9763d SF 80 Dog Park Aerials, 5th Ave 06/29/11 |
9760d SF 80 YBI Aerials, SAS Trasition Structure and C.G. 06/29/11 |
9745d NAPA Vallejo, Skaggs Island Transfer Ceremony to the Fish & Wildlife Service 06/28/11 |
9768d ALA880 Oakland, 5th Ave Overcrossing, AC Paving SB Approach 06/24/11 |
9766 Ala880 Oakland, 80d High Street Replacement Project, Rebar Installation 06/24/11 |
9767 Ala880 Oakland, 5th Ave Overcrossing, after cellular concrete pours 06/24/11 |
9739d CC4 Antioch Bridge Retrofit, Friction Pendulum Bearing Install 06/21/11 |
9736d Devil's Slide Tunnel, Pacifica, Discovery Channel Filming 06/20/11 |
9741d SF80 YBI, Wet Catwalks in Place 06/24/11 |
9735d SF80 YBI Transition Structure 06/16/11 |
9734d SF80 Dog Park and 5th Street Update 06/16/11 |
9728 Ala880 E. Palo Alto, Dumbarton Bridge Retrofit, Substation Concrete Pour 06/15/11 |
9728 Ala880 E. Palo Alto, Dumbarton Bridge Retrofit, Substation Concrete Pour 06/15/11 |
9769d SF80 New East Span, SAS Tower Welding, Bike Panel Lift 06/14/11 |
9722_23 Doyle Drive, Roadway Slab Pour in Tunnel, Hookramp Overviews 06/09/11 |
9724 CC80 Richmond, Doyle Drive Fence Restoration @ Michael Bondi's Studio 06/09/11 |
9721 SF80 San Francisco, Rincon Hill Dog Park 06/09/11 |
9731d SOL80 Vallejo Aerials, Hunterhill Safety Rest Stop 06/07/11 |
9714d ALA80 Oakland Touchdown Aerials 06/07/11 |
9717d 11 Son 128 Geyserille, Russian River Bridge Aerials 06/07/11 |
9776d Move Over Law Press Conf 07/11/11 |
9716d Son 101, Rohnert Park Aerials, Wilfred Exhange 06/07/11 |
9715d Song 101 Petaluma Aerials, Novato to Rohnert Park 06/07/11 |
9712d Ala880 Oakland, 5th Ave Overcrossing after Cellular Concrete Pour 06/03/11 |
9713d Ala880 Oakland High Street Replacement Falsework Installation 06/03/11 |
9710d 92/880 Reconstruction, Storm Drain Tunneling Under 880 06/02/11 |
9709 Son1 Bodega Bay Slide Repair 06/02/11 |
9707_08 Ala80 Oakland EB 80 Touchdown Detour 05/28/11 |
SM280 Hillsborough, Crystal Springs Ribbon Cutting 05/27/11 |
9705d SM1 Pacifica Aerials Devils Slide Tunnel 05/26/11 |
9702d SF80 Aerials SAS Saddle In Place 06/26/11 |
9701 ALA80 Oakland Aerials, Toll Plaza Touchdown 05/26/11 |
9703 SF80 YBI Transition Structure 05/26/11 |
9704 SF101 Aerials, Doyle Drive Project 05/26/11 |
9698 CC80 Hercules, 80 HOV Lane Ribbon Cutting 05/24/11 |
9694_95d SF101 Doyle Drive Overviews Rebar Install on Tunnel Wall 05/23/11 |
9690 ALA580 Livermore, Isabel Exchange Concrete Deck Pour 05/19/11 |
9692 ALA880 Oakland, Concrete Deck Pour 5th Ave Overcrossing 05/19/11 |
9689 SF80 YBI Saddle Installation SAS 05/19/11 |
9688 Ala 92_880 Reconstruction EB 92 to NB 880 Ramp wTraffic, Earthwork 05/18/11 |
9685 Ala880 Oakland Overcrossing Concrete Pour 05/12/11 |
9686 Ala880 High Street Replacement, New Falsework 05/12/11 |
9683 Hwy 4 Widening, Earthwork near San Jose 05/11/11 |
9675 SF80 YBI Transition Structure 05/11/11 |
9676 SF80 YBI SAS Aerials 05/10/11 |
9673 680 Rehabilitation, Roadway Concrete Slab Spour 05/10/11 |
9674 SC101 Menlo Park Aerials, 101 University to Marsh 05/09/11 |
101 San Jose, Tully Road Overcrossing Overviews 05/05/11 |
9666 SF80 YBI Grillage Drilling 05/04/11 |
9667 SF101 Concrete Deck Overviews 05/02/11 |
Ala80 Oakland, New Tow Service Building at SFOBB Toll Plaza 05/03/11 |
9657 Ala880 Oakland Aerials, High Street and 42nd Ave 04/28/11 |
Rincon Hill Dog Park, Earthwork 04/28/11 |
9655 SCL101 San Jose, Tully Road Interchange 04/28/11 |
9659 Ala80 Oakland, New East Span 04/28/11 |
101SF Doyle Drive Rebar & Ruckman Bridge 04/27/11 |
9647 CC160 Antioch Construction, Bridge Concrete Cutting Prep 04/26/11 |
9648 Sol84 Ryder Island Repaving Levy Road 04/26/11 |
9644 Ala80 Oakland, SAS Tower Bike Path on Skyway 04/26/11 |
9645 Ala880, Workers Memorial 2011 04/26/11 |
9646 CC24 Orinda, Caldecott Tunnel Project 04/25/11 |
9642 Ala880 5th Ave Overcrossing, Stem and SOFFIT Concrete Pour 04/22/11 |
9636 Ala880 High Street Replacement, Concrete Column Form Removal 04/22/11 |
Son128 Geyserville, Russian River Aerials 4/21/11 |
9641 Ala880 Hayward 92 880 and EDB92 NB880 Connector Ramps 04/18/11 |
9633 CC680 San Ramon, Rehabilitation Project, 1st Slab Installation 04/18/11 |
9634 SF80 YBI Aerials, Transition Structure 04/15/11 |
9630 YBI Construction Update, Tower Grillage Lift, Placement 04/15/11 |
9626 SF80 San Francisco Aerials, Old Transbay Terminal Area 04/11/11 |
9625 SM1 Pacifica, Devils Slide Tunnel 04/11/11 |
9627 CC24 Oakland Aerials, Caldecott Tunnel 4th Bore 04/11/11 |
9602 9621 CC4 Antioch Hw 4 Widening, Soundwall Install, Pile Driving at New Century Blvd 04/08/11 |
9622 CC4 Antioch Retrofit, Bearings Installed, Swallow Birds Nesting 04/08/11 |
9619 ALA80 Oakland, Saddle to Grillage Test Fit Pier 7 04/06/11 |
9615 SF101, Doyle Drive Tunnel Earthwork 04/06/11 |
9611 ALA880 Oakland Aerials 5th Ave Project 04/05/11 |
9612 ALA880 Oakland Aerials High Street 42nd Ave 04/05/11 |
9613 ALA880 Hayward Aerials 880 92 Interchange 04/05/11 |
9610 SF101 San Francisco, Doyle Drive Aerials 04/05/11 |
9609 SF80 YBI, New East Span Aerials 04/05/11 |
9606 ALA24 Oakland Construction Caldecott Tunnel 4th Bore 04/04/11 |
9743d SCL 101 San Jose, Tully Road Overcrossing Paving 03/30/11 |
9604 ALA880 Garrett Morgan Sustainable Trans 03/30/11 |
9600 101 San Jose, Tully Road Overcrossing Pile Driving 03/30/11 |
9599 Dumbarton Bridge Retrofit Overviews 03/30/11 |
9592 SF80 YBI Netherlands Infrastructure Tour 03/23/11 |
9639 Son101 Petaluma Aerials, HOV Petaluma to Rohnert Park 03/21/11 |
9638 Son101 Rohnert park Aerials, Wilfred Interchange 03/21/11 |
9591 SF80 YBI 4th Tower Lift Sheer Link Work 03/21/11 |
9585 92/880 Reconstruction, New Falsework Overview 880 03/17/11 |
9588 Ala24 Caldecott 4th Bore Media Event 03/17/11 |
9581 SF80 YBI Cross Beam Curtain Install Lift 4 03/15/11 |
ALA24 Oakland Construction Update, Portal Begin Tunneling 03/15/11 |
9578 SF Doyle Drive Tunnel Excavated to Lowest Point, Overviews 03/11/11 |
101 Gap Closure Ribbon Cutting 03/11/11 |
9572 SF80 YBI Bolting 11W to 10W 03/09/11 |
Isabel Interchange Over 580, Concrete Srtem & SOFFIT Concrete Pour 03/08/11 |
9565 SF80 Abutment to Vermont & Terminal 03/07/11 |
9564 ALA80 Oakland Aerials Touchdown Berma Rd. Shoreline 03/07/11 |
ALA880 Hayward Aerials, 880/92 Interchange 03/07/11 |
ALA880 Oakland Aerials AV_M Mehta 42nd Street to 5th Ave 03/07/11 |
SM1 Pacifica Aerials, Devils Slide Tunnel Project Construction 03/07/11 |
SF80 YBI Aerials Toll Bridge, New SAS and Transition Work 03/07/11 |
880 High Street Replacement Project Overviews, Homeless Camp Removed 03/07/11 |
Caldecott Tunnel 4th Bore Demo of Concrete Face, Oakland Side 03/07/11 |
Devils Slide Water Flows into Temp non-Storm Water Treatment System, BMPs 03/02/11 |
YBI Tower Lift Leg 2 & 3 Views from T1 03/02/11 |
SOL80 Vallejo Ceremony Reopening Hunter Hill Rest Stop 03/01/11 |
SF80 YBI Update Tower #4 1st Leg Lift 02/28/11 |
92/880 Reconstruction Overviews 02/28/11 |
Black History Month Celebration 2011 02/24/11 |
Antioch Bridge Retrofit, Bearings Cross Beam Installation 02/23/11 |
Hwy 4 Widening, New Bridge at Century 02/23/11 |
ALA880 Oakland Aerials, 42nd Ave Replacement, High Street 02/22/11 |
ALA80 Oakland Aerials, 5th Street Crossing 02/22/11 |
SON101 Rohnert Park Aerials, Wilfred Interchange 02/22/11 |
Son Petaluma Aerials Construction How Widening Cotati 02/22/11 |
ALA880 Oakland Touchdown to Mze Aerials 02/22/11 |
SF80 YBI Aerials YBITs & SAS Projects 02/22/11 |
Son128 Geyserville Aerials, Russian Rier Bridge 02/22/11 |
West Dublin BART Station Ribbon Cutting 02/18/10 |
I680 Rehab Project 02/16/11 |
Devil's Slide Tunnel Invert Rebar Install, Final Tunnel Wall Sample 02/09/11 |
SF80 YBI Trans Structure Falsework 02/10/11 |
SF80 Treasure Island Views of SAS 02/10/11 |
SF80 Aerials SAS and YBI Transition 02/28/11 |
ALA80 Oakland Touchdown Aerials 02/08/11 |
SF101 Doyle Drive Aerials 02/08/11 |
880 High Street 42nd Ave Detour 02/07/11 |
580 HOV Widening, from Fallon-El Charro Overcrossing 02/04/11 |
101 Tully Groundbreaking 02/04/11 |
Isabel Interchange, Stem & Soffit Form Install, Earthwork 02/04/11 |
SF80 Treasure Island Sand Spill Cleanup 02/03/11 |
5th Ave Oversrossing, Post Tensioning, Falsework Over Railroad 02/03/11 |
SF80 Dog Park & Beale Ceremony 02/03/11 |
ALA880 Oakland WTS Transbay Terminal 02/02/11 |
SF101 Doyle Drive Tunnel Work 01/20/11 |
Caldecott Tunnel 4th Bore Canope Pipe Drilling 01/19/11 |
SF101 Concrete pour Soffit 01/19/11 |
Isabel Interchange, Rebar Installation 01/19/11 |
Wilfred interchange, Concrete Deck Pour 01/14/11 |
Doyle Drive Traffic Switch on Ruckman Overcrossing, Overiews of Tunnel 01/10/11 |
128 Russian River Bridge @1300hrs 01/09/11 |
Son 101 Rohnert Park Aerials Construction, Wilfred inter & 101 So to Petaluma 01/09/11 |
CC4 Pittsburgh Aerials, Widening Loveridge to Antioch Br 01/09/11 |
SF80 TBI Aerials, New East Span, Oakland 01/05/11 |
SF101 Doyle Drive Aerials 1/5/11 |
SM1 Pacifica Aerials, Devils Slide Tunnel, 01/05/11 |
Photography Gallery 2010 |
New East Span 4th Tower Leg, 3rd Lift 101218 |
New East Span 2nd Tower Leg of 3rd Lift 12/16/10 |
SF 80 YBI Construction, 1st Leg, 3rd Left Tower on SAS 12/15/10 |
SON 128 Geyserville Construction Update, River Alignment Monitoring 12/13/10 |
SF80 YBI Aerials Toll Bridge, SAS and YBITS11 12/07/10 |
ALA 80 Oakland Touchdown Aerials 12/07/10 |
SF 101 Doyle Drive Aerials 12/07/10 |
SM1 Pacifica, Devils Slide Aerials 12/07/10 |
SOL12 Fairfield Construction, Safety Imp Lambie to Currie Roads 12/03/10 |
MRN580 San Rafael 580/101 Ribbon Cutting 12/01/10 |
SON101 Rohnert Park Construction Aerials, Wilfred Interchange 11/16/10 |
SON128 Geyserville Aerials, 128 Russian River Bridge at 1230HRS 11/16/10 |
SON101 Novato Aerials, 101 Existing, HWY 37 to Petaluma 11/16/10l |
SON101 Geyserville to Mendocino County Line Aerials 11/16/10 |
SON101 Cotati Aerials, 101 HOV Widening Petaluma to Rohnert Park 11/16/10 |
Emergency Response Tour with Chinese Delegation 11/16/10 |
Doyle Drive, SF, Concrete Deck Pour, Ruckman St. Bridge, Over Cemetary 11/16/10 |
Antioch Bridge Retrofit Falsework Overviews 11/12/10 |
4 Widening, Drain Pipe Install Near Los Medanos Creek 11/12/10 |
580 HOV Lane Widening 11/10/10 |
SF80 TBI SAS Tower Views, Left Coast Lifter 11/04/10 |
ALA24 Oakland Aerials, Caldecott 4th Bore 11/03/10 |
SF101 Doyle Drive Aerials 11/03/10 |
SM1 Pacifica Aerials, Devils Slide Tunnel Project 11/03/10 |
ALA80 Oakland Touchdown Aerials 11/2/10 |
SF80 YBI Aerials SAS, YBITS Progress 11/02/10 |
Son 101 Windsor, HOV Ribbon Cutting 11/02/10 |
580 Bellum Blvd Near Completion 11/01/10 |
SF80 TBI 4th Leg of 2nd Tower Lift 10/29/10 |
District 4 Diversity Day 2010 |
SF80 YBI SAS 2nd Leg, 2nd Lift 10/26/10 |
SAS 1st Leg of 2nd Tower Lift 10/25/10 |
SF80 YBI, 1st, 2nd Tower Lift 10/25/10 |
Son 128 Geyserville Aerials, Russian River 10/25/10 |
SF80 TBI Crane Move 10/20/10 |
SF80 YBI SAS Progress 10/20/10 |
Caldecott Tunnel 4th Bore Tieback Drilling 10/20/10 |
880 High Street, Foundation Drilling 10/20/10 |
Sol 12 Cordelia Aerials, Jameson Canyon 29 to 80 10/13/10 |
Son 128 Geyserville Aerials, Erosion Control Russian River 10/13/10 |
9412s Son 101 Wilfred Aerials, Airport Road & 101 Interchange 10/13/10 |
Son 101 Rohnert Park B Bundensen 101 Wilfred Interchange Aerials 10/13/10 |
Devil's Slide S/B Breakthrough 10/12/10 |
Crystal Springs Construction 10/12/10 |
101 SF Repaved @ Candlestick Park 10/07/10 |
Bellum Crossing Overviews 10/07/10 |
580/101 Widening Bike Path Completed 10/07/10 |
101 SF Repaved @ Candlestick Park 10/07/10 |
SF101 Doyle Drive Aerials 10/05/10 |
SF80 Segment Lift 9W 10/06/10 |
ALA 880 92 Hayward Aerials 10/05/10 |
SM1 Devil's Slide, Pacifica Aerials 10/05/10 |
Son128 Geyserville, Enviro Repair Russian River Bridge 10/02/10 |
Son128 Geyserville, Erosion Control Russian River Bridge 10/01/10 |
Devils Slide Punch Tunnel Through 10/01/10 |
Russian River Bridge Erosion Control. Silk Screen Removal, Rock Placement, Tree Planting 09/30/10 10/10/07 |
101 Widening, Petaluma Concrete Deck Pour @ State Farm Drive 09/30/10 |
Son101 Central A Widening in Cotati Aerials 09/28/10 |
Son101 Widening & Wilfred, Petaluma Aerials 09/25/10 |
9380 Doyle Drive Girder Lift Over Cemetary 09/23/10 |
"680 HOT Lane Completed 09/22/10 |
Redwood Road IC Improvement Ribbon Cutting 09/20/10 |
680 HOT Lane Ribbon Cutting 09/15/10 |
ALA80 Shanghai Construction Update, SAS Fabrication @ ZPMC 09/14/10 |
Innovation Fair II, SFOBB Boat Tour 09/14/10 |
Caldecott Tunnel 4th Bore Tieback Drilling 09/13/10 |
New East Span Overviews 09/08/10 |
Wilfred Ave Overviews 09/03/10 |
Doyle Drive Falsework, SF 09/02/10 |
Ala 580 Aerials, Oakland Maze Looking West 08/31/10 |
Doyle Drive Aerials, SF 08/31/10 |
SF80 YBI Aerials, New East Span 08/31/10 |
9356 I-Fair, District 4 Oakland 08/26/10 |
SF101 Construction D Pang Va Fence Stripping@Superior 08/25/10 |
Ala 880 Oakland, Heartwalk Talent Event 08/24/10 |
Doyle Drive Project Construction 08/23/10 |
ALA80 Oakland, APMC #19 Unloading Pier 7 08/19/10 |
ALA880 Oakland, PIO Leg Affairs D. Nelson Chinese Del., Quingdao City Tour 08/18/10 |
SM101 Burlingame Aerials 08/17/10 |
ALA880/92 Hayward Aerials 08/17/10 |
ALA80 Oakalnd, ZPMC #19 Pier 7 Aerials 08/17/10 |
ALA80 Oakland ZPMC #19, Pier 7 with Decks 08/16/10 |
SF80 YBI, SAS & Ybitts Overviews 08/12/10 |
Transbay Terminal Ground Breaking, SF 08/11/10 |
CC24 Orinda, Commencement of Tunneling 08/09/10 |
SF80 YBI 4th Tower Leg Lift 08/05/10 |
SF80 YBI Three Tower Legs, 1st Lift 08/05/10 |
CC80 Hercules Construction Update A atef EB 80 HOV & Widening 08/04/10 |
SF80 YBI SAS Aerials 08/02/10 |
ALA80 Oakland Touchdown Aerials, Burma Road ES to E9 08/02/10 |
SF101 Doyle Drive Aerials 08/02/10 |
SM1 Pacifica, Devils Slide Tunnel Aerials 08/01/10 |
80 New Bay Bridge 1st Tower Leg in Place 07/29/10 |
New East Span SAS Tower Leg Lift 07/28/10 |
80 YBI Toll Bridge Tower Leg Lift SAS 07/28/10 |
Devils Slide Tunnel Scanning 07/27/10 |
SF80 YBI Shear Plate Installations SAS 07/27/10 |
ALA580 Livermore, Portola Ave Deck Pour 07/27/10 |
Doyle Drive Re-Alignment of Main Line 07/26/10 |
80 SAS Construction Tower Base 07/23/10 |
SF80 YBI Transition Structure 07/22/10 |
101 Widening Ribbon Cutting 07/22/10 |
SF101 Presidio Tunnel Ground Breaking 07/21/10 |
Manuel Campos Pkwy Ribbon Cutting 07/21/10 |
High Street Replacement Wall Pour 07/19/10 |
Isabel IC over 580 07/15/10 |
580 Bellum Blvd Deck Pour 07/15/10 |
5th Ave Overcrossing, Pile Welding 07/15/10 |
80 Oakland, Unloading Tower Segments 07/12/10 |
880 High Street Offramp 07/10/10 |
Caldecott Tunnel Earthwork Roadheader 07/09/10 |
Son116 Schellville Aerials, Stage Gulch 07/08/10 |
Son 101 Widening Petaluma Aerials 07/08/10 |
12 Napa Aerials, Safety Improvements 07/08/10 |
Isabel I/C Over 580 07/07/10 |
SM1 Pacifica Aerials Devils SLide Tunnel 07/06/10 |
CC24 Orinda, Caldecott Tunnel 4th Bore Aerials 07/06/10 |
80 YBI Aerials New East Span 07/06/10 |
SF101 Doyle Drive Aerials 07/06/10 |
80 YBI Aerials New East Span 07/06/10 |
92/880 Reconstruction Overviews 07/01/10 |
SF80 YBI Favco Crane 07/01/10 |
880 5th Ave Test Pile 07/01/10 |
SF101 Doyle Drive Replacement 06/30/10 |
Doyle Drive Ruckman Ave Overcrossing 06/25/10 |
New East Span 80 Oakland Aerials 06/24/10 |
District 4, Philippine Indepence Day 06/16/10 |
MRN 580 Girder Placement @ Bellam, San Rafael 06-15-10 |
80 YBI New East Span Update 06-14-10 |
Devil's Slide Tunnel Chamber Concrete Pour 06/10/10 |
Caldecott Tunnel Soil Nail Wall 06/03/10 |
80 YBI SAS and Falcons 06-03-10 |
Barbara Boxer's Visit Caldecott Tunnell ARRA Funding 06/03/10 |
CC80 EB Widening Construction, Hercules 06-02-10 |
New East Span 80 Oakland Aerials 06/02/10 |
New East Span Transition Structure 06/01/10 |
880 Oakland 5th Ave Overcrossing 06/01/10 |
80 SAS Consruction 5-28-10 |
New East Span Cross Beam Lift for SAS 05-26-10 |
Devils Slide Tunnel Aerials, SM1 Pacifica 05-05-10 |
SF80 YBI Aerials New East Span 05-05-10 |
CC80 Hercules Upate Hatefi to 4 Crockett 05-03-10 |
Doyle Drive SF 101 Historic Fence Removal 04/28/10 |
101 Cotati Ceremony Ground Breaking, Petaluma 04/27/10 |
Doyle Drive CIDH Concrete Pile Cage Pour 04-26-10 |
880 Oakland 5th Ave 04-23-10 |
680 HOT Lane Concrete Median Pour 04/19/10 |
80 Oakland Unloading Zhen Hoa 17 ZPMC 04-19-10 |
Doyle Drive Pile Welding, Concrete Pour 04-15-10 |
80 Oakland Construction Off Loading Cable Saddles/Japan 04-15-10 |
Napa 29 Yountville Bicycle Path Ground Breaking 04-14-10 |
Caltrans Worker's Memorial 04/13/10 |
Son 101 Aerials Wilfred Int Traffic Switch 04-13-10 |
Son 12 Santa Rosa Aerials 04/13/10 |
Doyle Drive After Concrete Deck Pour, 19th Ave 04/07/10 |
880 Hayward Aerials 880/92 Interchange 04/07/10 |
580 Hayward Aerials Construction 580/238 Interchange 04/07/10 |
Devils Slide Tunnel Aerials, 101 Pacifica 04-07-10 |
New East Span SF80 YBI Aerials 04-07-10 |
SF101 Doyle Drive Project Aerials 04-07-10 |
Doyle Drive 19th Ave Connector Deck Pour 03/26/10 |
Devils Slide Tunnel Blasting 03-25-10 |
Son 101 Aerials Petaluma to Winsor 03-24-10 |
SF80 YBI Construction W2 Section Lift and Push 03-19-10 |
Stimulus Highway Funding Luncheon 03-18-10 |
Caltrans District 4 Iranian New Year 3-17-10 |
152 Widening, Soil Nail Wall 3-16-10 |
New East Span Crossbeam Transition on Falsework 03-24-10 |
Doyle Drive Palm Tree Planting 03-11-10 |
Doyle Drive Falsework Installation 03-10-10 |
880 Hayward Aerials 880 92 Interchange 03/05/10 |
Devil's Slide Aerials, Pacifica 03/05/10 |
80 TBI Aerials Pier 7 03/05/10 |
101 Doyle Drive, San Francisco Aerials 03/05/10 |
J-MAC Ferry Towed Back To Service, 03/03/10 |
SF 80 Pohang Korea Construction 02/27/10 |
SF 80 Ulsan Korea Toll Bridge Bearing Test 02/26/10 |
SF 80 Korea Bearing @ National Oilwell Varco 02/25/09 |
SF 80 Korea Bearing @ National Oilwell Varco 02/25/09 |
SBE DBE DVBE Workshop 02/25/10 |
High Street Replacement Project Test Pile 02/22/10 |
5th Ave Overcrossing Bearing Pour 02/22/10 |
Isabel IC Over 580 Pile Driving @ Portola Ave Overviews, 02/17/10 |
Son 101 Santa Rosa Construction 02/17/10 |
580 Widening, Concrete Median Pour, 02/17/10 |
SF80 YBI Toll Bridge Segment Lifts 02/11/10 |
New East Span SAS Segment Near W2, 02/10/10 |
Devil's Slide Final Linking Concrete Pour, Pacifica 02/10/10 |
SFOBB Eyebar Repairs September 7 - December 28, 2009 (Black & White) |
New East Span 1st Steel Segment Lift 02-04-10 |
New East Span 1st Steel Segment Lift 2-3-10 |
680 HOT Lane Construction 02/01/10 |
5th Ave Overcrossing Falsework Install 02/01/10 |
Doyle Drive Concrete Cage Lift 01/29/10 |
Santa Rosa Meeting 01/28/10 |
SAS Segments Unloading Pier 7, Oakland 01/27/010 |
Doyle Drive Transplanting Manzanita Bush 01-23-10 |
Doyle Drive, Rare Manzanita Bush, SF 01-14-10 |
Doyle Drive Pre-bid Meeting Small Business, SF 01-13-10 |
580 Marlow Onramp Tree Planting 1-11-10 |
CC24 Orinda, Caldecott 4th Bore Ground Breaking Ceremony 1/10/10 |
Segment Move, YPMC Yard, Shanghai China 01/05/10 |
New East Span Falsework Removal, Oakland 01-04-10 |
Photography Gallery 2009 |
SAS Fabrication, Shanghai China 12/30/09 |
Doyle Drive Foundation Excavation, SF 12-30-09 |
5th Ave Overcrossing, Column Concrete Pour 12-23-09 |
92 880 Reconstruction, Gabion Wall @ Industrial Bl, 12-22-09 |
SFOBB Eyebar Repair 12-20-09 |
El Camino Real Bell Dedication, SF 12-16-09 |
SFOBB Eye Bar Repair 12-15-09 |
Devil's Slide Tunnel After Blasting, SM1 Pacifica, 12-10-09 |
Devil's Slide Tunnel Aerials, SM1 Pacifica 12-09-09 |
SFOBB 80 Oakland East Span Aerials 12-09-09 |
Doyle Drive Aerials, SF 12-09-09 |
5th Ave Overcrossing, Foundation Drilling 12-07-09 |
92 880 Reconstruction Overcrossing 12-07-09 |
101 Widening New Pavement 12-03-09 |
5th Ave Overcrossing Pile Driving 11-30-09 |
Isabel I/C Over 580 Earthwork & 580 Widening Overviews 11-30-09 |
New East Span, Old Span Demo, "S" Curve Overview 11-24-09 |
680 HOT Lane Concrete Form Panel Instalation 11-23-09 |
SFOBB Eyebar, First Repair Removal 11-22, 27, 28-09 |
Hilltop Overcrossing Completed 11-17-09 |
5th Ave Overcrossing Concrete Pour 11-16-09 |
92 880 Overcrossing Prior to Retrofit 11-16-09 |
SFOBB Eyebar Soundwave Testing 11-14-09 |
SFOBB Daily Eyebar Inspection 11-12-09 |
Sol 80 Fairfield Ribbon Cutting Ceremony 11-05-09 |
Marin 101 Tiburon and San Rafael Aerials 11-02-09 |
101/580 Interchange Aerials, San Rafael 11-02-09 |
Devil's Slide Tunnel Aerials, SM1 Pacifica 11-02-09 |
Doyle Drive Tree Removal Aerials 11-02-09 |
New East Span (Eyebar) Aerials YBI 11-02-09 |
SFOBB East Span (Eyebar) Aerials 11-02-09 |
SFOBB Eyebar Completion Press Conference 11-02-09 |
SFOBB Eyebar repair for Sunday 11-1
and Monday 11-2 Completion |
SFOBB 80 YBI 2nd Eyebar Repair 10-31-09 |
SFOBB 2nd Eyebar Repair 10-30-09 |
Eyebar Repair SFOBB 10-29-09 |
SFOBB Eyebar 2nd Repair, Wednesday P.M. 10-28-09 |
Eyebar Repair SFOBB 10-28-09 |
880 Mission Blvd. Completed 10-27-09 |
Eyebar Repair SFOBB 10-27-09 |
680 HOT Lanes Stem & Soffit Pour over Caleveras Rd 10-23-09 |
Rohnert Park Wilfred Interchange 10-22-09 |
580 Completed 10-21-09 |
Sol80 Fairfield Construction 10-20-09 |
Hunter Hill Rest Stop, Sol 80 Construction, 10-19-09 |
Doyle Drive Groundbreaking, Speaker Pelosi, Golden Gate Bridge 10/17/09 |
238 Ribbon Cutting, Castro Valley 10-09-09 |
Hilltop Road Overcrossing Ribbon Cutting 10-09-09 |
Devils Slide Tunnel, Highway 1 Pacifica 10-07-09 |
101 Doyle Drive Aerials, Tree Removal, San Francisco 10-07-09 |
80 SFOBB Touchdown and Sky Way Aerials, Oakland 10-07-09 |
238/880 Widening Completion Overviews 10-07-09 |
I-80 YBI Labor Day Weekend Aerials 10-05-09 |
New East Span, South Detour Overviews 09-29-09 |
Devil's Slide Tunnel Electrical & Rebar, Pacifica 09-22-09 |
Hwy. 580 HOV opening, 580/84 congestion relief groundbreaking |
Doyle Drive Briefing, San Francisco 09-09-09 |
SF80 Labor Day Weekend 2009 YBI |
SFOBB Closure, Labor Day Weekend 9-6-09 |
New East Span, Oakland Touchdown, Last Deck Pour 09-02-09 |
Devil's Slide Tunnel Project, Pacifica 09-01-09 |
Public Infrastructure Advisory Commission (PIAC) Meeting 09-01-09 |
Martinez Bridge Bike Path Ribbon Cutting 8-29-09 |
880 Aerials and 880/92 Interchange 08-27-09 |
SFOBB Pre Labor Day Detour 08-27-09 |
680 HOT Lane, Rebar Install,
Backfilling, Retaining Wall 8-24-09 |
New East Span Aerials, Oakland 8-20-09 |
Bay Area Aerials Overview 24 980 580 80 08-19-09 |
San Rafael 101 to Windsor Aerials 8-17-09 |
New East Span, OTD Overviews 8-17-09 |
BART Strike Press Conference 8-16-09 |
92/880 Pile Driving for Separators 8/12/09 |
Doyle Drive Tree Removal, SF 8-13-09 |
238/880 Post Paving, 8-12-09 |
680 Benicia Martinez Bridge Aerials Lane Configuration 8/11/09 |
Devil's Slide Aerials, Pacifica 8-5-09 |
New East Span Aerials, Oakland 8-05-09 |
SF80 YBI, Tressel Install 8-4-09 |
Benicia Martinez Bridge Lane Configuration, 8-03-09 |
Will Kemptons Farewell, District 4, Oakland 7-29-09 |
New East Span, Oakland Touchdownm Stem & Soffit Pour, 7-23-09 |
Solano 80, Fairfield 7-23-09 |
SOL 80 Fairfield 08-18-09 |
New East Span Touchdown Paving , Oakland 7-15-09 |
Devil's Slide Tunnel North Portal, Pacifica 7-14-09 |
SFOBB Korea Hochang Machinery 7-14-09 |
101 Rohnert Park, Wilfred Groundbreaking 6-22-09 |
880 Oakland 5th Street Pile Driving 6-22-09 |
Wilfred Ground Breaking, Sonoma 6-22-09 |
80 Oakland Touchdown 6-18-09 |
680 HOT Lane AC Paving Near Mission Blvd, 6-18-09 |
SF 80 at YBI So-So Detour, 06-15-09 |
92 880 EB Connector Ramp 6-15-09 |
SFOBB YBI 2nd Lift Sheer Crane, 6-4-09 |
Oakland Touch Down Aerials 6-3-09 |
880 92 Interchange Construction Aerials, Hayward 6-3-09 |
Devils Slide Tunnel Aerials, Pacifica 6-3-09 |
SF 80 SAS and So-So Detour 6-3-09 |
New East Span Transition Structure 6-2-09 |
YBI 1st Project Lift, Sheer Leg 5-29-09 |
Devils Slide Tunnel, Pacifica 5-28-09 |
Calmentor Protege Program 5-22-09 |
80 Repaving & Widening, Fairfield 5-21-09 |
Benicia Bridge Construction 680, Martinez 5-21-09 |
580 Widening Overviews, Livermore, 5-19-09 |
SFOBB Oakland Touchdown 5-18-09 |
Antioch Bridge Hwy 160 5-13-09 |
12 Solano Safety Improvements 5-14-09 |
Bike To Work Day, District 4 Offices, Oakland 5-14-09 |
New East Span Construction, YBI 5-13-09 |
New East Span
South Detour Construction Update 5-13-09 |
New East Span Truss, Oakland 5-08-09 |
680 Lake Herman Road Overlook, Benicia 5-6-09 |
84 Solano, Rio Vista, Don't Trash California Litter Pick Up Event 05-06-09 |
9 Soft Median Striping, Saratoga Completed 5-5-09 |
80 Event 1st Stimulus Project 4-30-09 |
People Making It Happen, SFOBB 4-29-09 |
SFOBB South Detour, SF80 4-29-09 |
37 & 121 Scenics, SAS Leg Crane Lift 4-22 & 27-09 |
9 Soft Median Barrier, Saratoga 4-21-09 |
680 Benicia Bridge Modification, Martinez 4-18-09 |
West Aproach Completed Rooftop Views, SF 4-14-09 |
92/880 Paving, Hesperian, Hayward 4-13-09 |
101 Widening Peninsula Ave, Burlingame 4-8-09 |
880 Mission Rooftop Overview, Fremont 4-6-09 |
680 HOT Lanes Earthwork, Fremont 4-6-09 |
Safe on 17 10-Year Anniversary, 4-6-09 |
Devils Slide Vent Sysytem Change, Pacifica 4-2-09 |
New East Span T1, E2 So. Detour, Oakland 4-1-09 |
Highway 12 Groundbreaking, Rio Vista 3-30-09 |
New East Span Leg Crane Pier 7, Oakland 3-18-09 |
New East Span, Oakland Touchdown Deck Pour 3-18-09 |
New East Span Leg Crane Arrival, Oakland 3-12-09 |
Arbor Day Tree Planting Ceremony, SF 3-11-09 |
Devils Slide Tunnel Ventalation Reconfig, Pacifica 3-5-09 |
101 Doyle Drive Press Conference, SF 2-28-09 |
101-580 Widening Completed Marin 2-27-09 |
80 Hilltop Overviews Richmond 2-25-09 |
680 HOT Widening, Shotcrete Pour, Fremont 2-19-09 |
SFOBB Fabrication, Shanghai, China 2-16-09 |
New East Span Beam Lift, Oakland 2-11-09 |
New East Span W2 Prepour, Oakland 2-11-09 |
80 West Approach @ Harrison 2-10-09 |
Real McCoy Ferry @ Dry Dock San Francisco 2-10-09 |
Devils Slide Tunnel Ventilation System Dismantle, Pacifica 2-4-09 |
80 Oakland Aerials Pier 7 2-3-09 |
Devils Slide Tunnel Aerials Pacifica 2-3-09 |
80 YBI, San Francisco Aerials 2-03-09 |
West Approach Abutment to 5th Aerials
San Francisco 2-3-09 |
80 YBI, San Francisco Aerials 2-03-09 |
101 Widening New SB Lane San Rafael 2-2-09 |
101 Widening Opening Press Conference for HOV, San Rafael 1-30-09 |
80 Hiltop Cage Installation, Richmond 090129 |
880 92 Interchange Concret Pour Hayward 1-28-09 |
101 MRN Widening San Rafael 1-27-09 |
Benicia Martinez Bridge Aerials, Benicia 1-26-09 |
12, 80 & 113 Truck Climbing Lane & Wind Generators, Solano 1-26-09 |
160 Antioch Bridge Aerials with Touch Downs 1-26-09 |
80 Demo of Hilltop Overcrossing, Richmond 1-24-09 |
West Approach Sidewalk Pour 1st Street, SF 1-20-09 |
CC 280 Real McCoy in Drydock, San Francisco 1-15, 23-09 |
84 Dumbarton Bridge, Palo Alto 1-15-09 |
92/880 Construction Aerials, Hayward 1-15-09 |
101 SFO to 92 Widening Aerials, Burnlingame 1-15-09 |
80 So. Detour, SAS Coast Guard Lighthouse, YBI 1-14-09 |
Devil's Slide Tunnel Aerials, Pacifica 1-14-09 |
92/880 Concrete Deck Pour, Hayward 1-14-09 |
80 Touchdown, Oakland 090113 |
Devil's Slide Tunnel Shotcrete, Pacifica 1-13-09 |
84 Rio Vista Ferry Towed 1-12-09 |
80 San Francisco South Detour 1-12-09 |
101 Widening Soundwall, San Rafael 1-8-09 |
80 YBI South Detour 1-6-09 |
92/880 Reconstruction, Soundwall Pour, Hayward 1-6-09 |
|
Photography Gallery 2008
|
Double Fine Zone Press Conference, Van Nes Ave, San Francisco 12-23-08 |
580 Scenic, Altamont Pass, Livermore 12-17-08 |
West Approach Rooftop Overviews, San Francisco 12-16-08 |
West Approach Aerials - Abutment to 5th St., SF 12-9-08 |
680 HOT Lane Construction @ Mission, Fremont 12-9-08 |
New East Span, Oakland Aerials 12-9-08 |
Oakland Touchdown Aerials 12-9-08 |
New East Span Touchdown Pour, Oakland 12-4-08 |
Benicia (1962) Bridge Deck Demo, Martinez 12-3-08 |
Devil's Slide Bridges Completed, Pacifica 12-1-08 |
238/880 Widening Traffic Alignment, Hayward 11-25-08 |
92/880 Reconstruction E/B Split, Hayward 11-25-08 |
880 Mission Ribbon Cutting, Fremont 11/20/08 |
Devil's Slide Overviews, Pacifica 11-15-08 |
880 Mission HOV Lanes Fremont 11-20-08 |
West Approach Demo Fremont Offramp 11-8-08 |
101 Ribbon Cutting, Santa Rosa 11-7-08 |
84 Widening Access Tunnels Complete, Livermore 11-6-08 |
80 West Approach Aerials, San Francisco 11-05-08 |
80 Oakland Touchdown Aerials 11-05-08 |
New East Span Aerials 11/05/08 |
New East Span, Oakland Touchdown & Skyway 11-04-08 |
West Approach Demo of UTF Onramp 11/2/08 |
680 Hot Lane Ground Breaking, Fremont 10-31-08 |
12 Solano Construction Near Red Top, Fairfield 10-28-08 |
80 Solano Construction, Fairfield 10-28-08 |
84 Widening Ribbon Cutting, Livermore 10-24-08 |
101 Repaving, Santa Rosa 10-23-08 |
Tanker Truck Fire S/B 880, Post Repair, Oakland 10-22-08 |
MTC Excellence in Motion Awards, Oakland 10-22-08 |
I880 Crash Site & Press Conference, Oakland 10-22-08  |
84 Widening, Sign Installation, Livermore 10-21-08 |
580/Redwood Rd Interchange Ground Breaking 10-16-08 |
880/92 Interchange, Hayward 10-14-08 |
Solano 12 Construction , Fairfield 10-09-08 |
New East Span W2 Overviews, Oakland 10-09-08 |
Solano 80 Construction, Fairfield 10-09-08 |
New East Span Touchdown, Oakland 10-09-08 |
Caltrans Diversity Day, Oakland 10-7-08 |
238/880 Widening Construction, Hayward 10-1-08 |
New East Span & West Approach Aerials 9-29-08 |
Devils Slide Ceremony, Pacifica 9-26-08 |
Devils Slide Aerials, Pacifica 9-25-08 |
Heart Walk, Oakland 9-25-08 |
84 Widening After Traffic Switch, Livermore 9-17-08 |
85 Dedication Norman Mineta, Mountainview 9-15-08 |
Devils Slide Overview of Bridges, Pacifica 9-15-08 |
Devil's Slide Rock Bolting & Shotcrete Spraying, Pacifica 9-10-08 |
West Approach Overviews 3L & 3U 9-3-08 |
92 EB to 880 Flyover Reconstruction, Hayward 9-2-08 |
152/156 Ribbon Cutting , Gilroy 8-27-08 |
80 Tour Bay 2 Border 8-26-08 |
Benicia Bridge Modification Overviews, Martinez 8-14-08 |
84 Widening Vegetation, Newark 8-13-05 |
New East Span W2 Rebar Install, Oakland 8-13-08 |
New East Span Rebar W2, Oakland 8-1-08 |
New East Span Touchdown Pour, Oakland 7-30-08 |
Clear The Way Press Conference, Oakland 7-30-08 |
101 Sonoma Windsor Aerials 7-28-08 |
Solano 80 Repaving, Vacaville 7-25-08 |
New East Span Overviews, Oakland 7-24-08 |
84 Widening Before Traffic Switch, Livermore 7-22-08 |
MRN 101 Mill Valley 7-22-08 |
880 Mission WS Crossing Demo, Fremont 7-23-08 |
84 Widening, AC Paving, Newark 7-23-08 |
PAOA Sequeria, 101 Widening, Santa Rosa, 12 to Bicentenial Lane 7-22-08 |
Devil's Slide Rock Bolting and Guardrails, Pacifica 7-17-08 |
92/880 Hayward Construction 7-15-08 |
West Approach Rooftop Overviews 7-7-08 |
New East Span Oakland Touchdown 7-7-08 |
New East Span W2 Rebar 7-2-08 |
Summer Engineering Institute 2008 |
Safe Trip 21 Press Conference, Oakland 6-25-08 |
New East Span So. Detours 6-24-08 |
New East Span Pile Driving T1 6-24-08 |
Devil's Slide Road Header SB Tunnel, Pacifica 6-10-08 |
101/580 Widening Overviews, San Rafael 6-6-08 |
238/880 Overviews, Hayward 5-22-08 |
Devil's Slide Overviews, Pacifica 5-22-08 |
Benicia Bridge Modifications 5-22-08 |
Carquinez 1927 Bridge Demo, Crockett 5-22-08 |
Golden Gate Bridge Lone Sailor Aerials 5-15-08 |
Devil's Slide Tunnel, Pacifica 5-15-08 |
2007 Bay Area Hwy Congestion 5-14-08 |
880 Mission Warren Tunnel Fremont 5-13-08 |
Devil's Slide Overviews, Pacifica 5-7-08 |
SFOBB Toll Plaza & Horseshoe Ramp 5-6-08 |
East Span Touchdown Aerials 5-6-08 |
680 to Livermore 238, 580-880 Aerials 5-6-08 |
New East Span, Oakland Touchdown 5-5-08 |
101 Widening 12 to 101 Connector Overviews 4-28-08 |
101-580 Widening New Connector San Rafael 4-28-08 |
101 Widening POC Traffic Congestion Burlingame 4-25-08 |
Devil's Slide Tunnel Interiors, Pacifica CA 4-24-08 |
101 Offramp Widening E Blithdale San Rafael 4-23-08 |
I80 San Francisco Aerials 4-15-08 |
Oakland Aerials YBI 4-15-08 |
Devil's Slide Tunnel Aerials Pacifica 4-15-08 |
West Approach Demo Lower Deck 4-15-08 |
West Approach Chain Cutting, San Francisco 4-11-08 |
West Approach Lower Deck Views, San Francisco 4-10-08 |
West Approach Rooftop Overviews 4-7-08 |
238 Widening Deck Pour, Hayward 3-27-08 |
New East Span Small Crane Lift, Oakland 3-27-08 |
92/880 Earthwork & Pile Driving Overviews, Hayward CA 3-27-08 |
I92-880 Pile Driving, Hayward 3-26-08 |
I880 Mission Overviews, Fremont 3-26-08 |
Devil's Slide Concrete Pour, Pacifica CA 3-25-08 |
Devil's Slide Shotcrete & Rockbolting 3-18-08 |
West Approach Clocktower Overviews 3-17-08 |
101/580 Widening Deck Pour, E. Blithedale, San Rafael 3-13-08 |
101/580 Widening Overviews San Rafael 3-13-08 |
84 Widening Earthwork 3-12-08 |
Highway 4 Bypass Ribbon Cutting 3-13-08 |
New East Span Oakland Aerials 3-5-08 |
Adopt A Highway Litter Pickup, Antioch CA 3-4-08 |
Devil's Slide Tunnel Aerials 3-5-08 |
Lewis E Platt 87 Memorial, San Jose CA 2-28-08 |
238/880 Widening First Girders 2-15-08 |
880 Fremont GPS Traffic Monitoring 2-8-08 |
New East Span Cap Pour W2 2-5-08 |
New East Span Cable Friction Test 2-4-08 |
New East Span Cable Test 1-22-08 |
Devil's Slide SB Brg Pour 1-18-08 |
Richmond San Rafael Overviews 1-17-08 |
80 Oakland Overviews 1-16-08 |
New East Span Touchdown Welding Piles 1-9-08 |
New East Span Rebar Installation W2 1-9-08 |
101 Widening Deck Pour @ 6th 1-7-08 8327 |
New East Span Footing Pour T1 1-3-08 |
|
Photography Gallery 2007
|
Devil's Slide Aerials 12-27-07 8322 |
West Approach Aerials - Abutment to 5th St. 12-27-07 8323 |
New East Span Aerials 12-27-07 8324 |
Announcement of Funding for Ygnacio Valley Road Repairs 12-21-07 |
The Toy Drive to Deliver 12-19-07 |
New East Span Rebar Install 12-18-07 |
101 Widening Falsework 12-12-07 |
238-880 Widening Wall Footing Pour 12-5-07 8308 |
New Benicia Bridge Toll Plaza Traffic 11-7 & 12-7-07 |
West Approach Abutment to 5th 11-5-07 8285 |
New East Span South Detour 11-3-07 8284 |
Devil's Slide Aerials 11-3-07 8286 |
New East Span E2 Prepour 11-17-07 |
New East Span Footing Pour 11-12-07 |
Hwy 101_580 Ramp Overviews 11-14-07 |
New East Span Cable Tie at W2 11-15-07 |
New East Span South Detour Column 11-13-07 |
Devil's Slide Tunneling 11-27-07 8299d 8300d |
West Approach Fremont Offramp 11-5-07 |
West Approach Rebar Install 11-5-07 |
New East Span Overlay 11-6-07 |
New East Span 11-17-07 |
101 Widening Overviews 10-23-07 |
New East Span So Detour 10-15-07 |
New East Span Overviews @ Pier 6 9-2-07 |
Devil's Slide OMC Building 10-16-07 |
Devil's Slide Concrete Pour OMC 8-10-07 |
101 Widening Santa Rosa Concrete Falsework 10-22-07 |
Hwy 12 Press Conference 10-7-07 |
101 Widening San Rafael Phase 3 & 4 9-25-07 |
Devil's Slide So. Canopies 9-16-07 |
West Approach Rooftop 9-19-07 |
East Span Detour 9-13-07 |
East Span Deck Aerials 8-30-07 |
Devil's Slide Groundbreaking 9-17-07 |
101-580 Widening Groundbreaking Phase 4 9-12-07 |
New East Span Overviews 8-7-07 |
SFOBB Construction Aerials 9-3-07 |
New East Span Deck Replacement 9-1 & 2-07 |
Benicia-Martinez Bridge Opening 8-25-07  |
Carquinez Bridge Demo & Bell Removal 8-1-07 |
New East Span Construction 7-7-09 |
Devil's Slide Concrete Pour OMC Building 8-10-07 |
New East Span S Detour Pour 8-15-07 |
New East Span Cell Pour 8-15-07 |
Devil's Slide Concrete Pour 8-15-07 |
Rio Vista Rumble Stripe & Construction 8-03-07 |
New East Span Construction 7-7-09 |
Hwy 87 HOV Ribbon Cutting 8-15-07 |
New East Span Pour for Tie-In 7-11-07 |
Benicia Martinez Bridge Overviews 7-19-07 |
Construction Aerials 7-12-07 |
101 Widening Santa Rosa 6-20-07 |
New East Span Detour 6-22-07 |
Devil's Slide Deck Pour 6-25-07 |
Devil's Slide Roadway Construction 6-6-07 |
New East Span So. Detour 6-13-07 |
Highway 12 Improvements 5-14-07 |
Carquinez Bridge Demo 5-23-07 |
West Approach 4th Street 5-15-07 |
580 East Maze Aerials 5-21-07 |
Devil's Slide Aerials 5-21-07 |
New East Span 6-6-07 |
Maze Press Conference with Gov. Scwartzenegger 5-25-07 |
Maze Striping & Opening 5-24-07 |
Adopt A Highway Tour 5-8-07 |
Benicia Aerials 5-15-07 |
580 Maze Collapse Deck Pour 5-20-07 |
Maze Collapse Girder Installation 5-19-07 |
New East Span Detour 5-9-07 |
Carquinez Aerial of Demo 5-15-07 |
District 4 Diversity Day 2007 5-7-07  |
New East Span 5-3-07 |
Maze Bent Cap 5-15-07 |
Maze Girders Installation 5-16-07 |
New East Span 4-17-07 |
580 Maze Aerial Photographs 5-14-07 |
Maze Collapse & Repair 5-4-07 |
Maze Collapse Contractor Walk Through 5-5-07 |
Maze Collapse 880 Ramp Reopened 5-7-07 |
Federal delegation visits Maze, May 3, 2007 |
West Approach Demo after Traffic Switch 4-12-07 |
Maze Damage & Repair 5-1-07 |
Maze Collapse Damage Day 2 4-30-07 |
Maze Collapse Damage 4-29-07 |
New East Span Aerials 4-12-07 |
Carquinez Bridge Demo 4-13-07 |
Workers Memorial 4-18-07 |
West Approach Demo 4-12-07 |
Devil's Slide Concrete Strut Pour 4-4-07 |
New East Span T1 Footing 3-16 & 17-07 |
238 Widening Concrete Pour 4-5-07 |
Marin 1 Stinson Contract Ribbon Cutting 3-28-07 |
Wolk Highway 12 Press Conference 3-26-07 |
101 Widening Groundbreaking 3-27-07 |
West Approach 3-31-07 |
101/580 Widening 3-28-07 |
West Approach 3-27-07> |
Benicia Bridge 2-16-07 |
West Approach 3-6-07 |
101/580 Widening |
24 Rehab 2-16-07 |
New East Span T1 Footing 3-7-07 |
New East Span Slurry Backfill 2-21-07 |
880 Mission Construction Photographs 2-2-07 |
Hwy 101/580 Widening 2-15-07 |
Marin 1 Stinson Beach 2-15-07 |
Benicia Bridge Toll Plaza 1-25-07 |
Devil's Slide Tower Crane 1-27-07 |
East Span Rebar Cage 1-23-07 |
Devil's Slide Cage Lift 1-10-07 |
87 Widening 280 Connector Photos 1-8-07 |
880 Mission Overviews 1-8-07 |
Hwy 1 Stinson Beach Construction 1-9-07 |
| Photography Gallery 2006 |
Cultural Diversity Day 10-24-06 |
East Span Beam Lift 12-13 & 14-06 |
Rio Vista Bridge Photographs 11-17-06 |
East Span Last Segment Lift 12-6-07 |
Devil's Slide Column Cage Lift 12-6-06 |
West Approach Rooftop Overviews 12-5-06 |
880 Mission Photographs 12-4-06 |
New East Span Drilling Photos 11-28-06 |
Benicia Martinez Bridge Photos 11-14-06 |
238 Widening Construction Photos 11-15-06 |
West Approach Construction Overviews 11-06-06 |
101 Widening in Santa Rosa 11-9-06 |
Old Carquinez Bridge Demo Photos 11-9-06 |
Stinson Beach Marin Repair 10-19-06 |
HWY 87 Widening Photos 10/31/06 |
116 Storm Damage Repair 10-12-06 |
East Span 1st Footing Box 10-14-06 |
Richmond San Rafael Bridge Before Roadway Resurfacing 7-11-06 |
Russian River Bridge Completed 10-05-06 |
SFOBB Last Pile Stab 9-15 & 18-06 |
New Benicia Bridge Aerials 10-10-06 |
Richmond San Rafael Bridge Resurfacing
10-10 & 11-06 |
101 Widening Santa Rosa 10-05-06 |
880 Mission Construction 10-2-06 |
East Span Last Pile Driving 9-21-06 |
East Span Photos September 3 & 15, 2006 |
RSR Middle Lane Closed 10-2-06 |
West Approach Demo 9-3-06 |
West Approach Demo Night Photos 9-2-06 |
West Approach Pre-Demo Photos 9-1-06 |
Richmond San Rafael Bridge Overlay 9-26-06 |
East Span Segment Lift 8-29-06 |
New East Span Overviews 8-30-06 |
Devil's Slide 1st Concrete Footing 8-28-06 |
Benicia Martinez Bridge Construction 8-23-06 |
East Span Overviews Pier 7 08-17-06 |
Russian River Bridge Ribbon Cutting 8-17-06 |
Devil's Slide Repair Opening Day 8-4-06 |
Russian River Bridge Deck Pour 8-7-06 |
Devil's Slide Repair Ribbon Cutting 8-3-06 |
New East Span Overviews 7-24-06 > |
101 Widening Santa Rosa 7-31-06 |
Russian River Bridge 7-31-06 |
Devil's Slide Repair - Press Conference 7-20-06 |
Devil's Slide Main Repair, Erosion Control 7-26-06 |
Devil's Slide Overviews Main Slide Area 7-21-06 |
Devil's Slide Cage Install @ Shamrock 7-21-06 |
West Approach Overviews 7-20-06 |
Russian River Bridge Girders Installed 7-19-06 |
New Benicia Bridge - Last Deck 7-11-06 |
101-580 Widening San Rafael 7-7-06 |
101 Widening Santa Rosa 7-6-06 |
Russian River Bridge Construction 7-6-06 |
Carquinez Bridge Roadway Removal 6-27-06 |
Maxwell Bridge Ribbon 6-27-06 |
Devil's Slide Repairs Over Water 6-23-06 |
87 Widening 6-20-06 |
880 Mission Construction 6-20-06 |
Benicia Bridge Hinge C Lift 6-06-13 |
New East Span Last Segment Concrete Pour 6-12-06 |
Marin 101 HOV 6-9-06 |
50th Anniversary 6-16-06 California Interstate Highway System |
Russian River Bridge 6-9-06 |
West Approach 3rd Street Onramp Demo 6-4-06 |
West Approach 101 Bypass 6-3-06 |
Devil's Slide S Rockwall Completed 5-24-06 |
Devil's Slide North Portal 5-23-06 |
Devil's Slide Repair Main Cliff 5-30-06 |
Devil's Slide Repair Main Cliff 5-23-06 |
Martinez Aerials New Benicia Bridge 5-25-06 |
Crockett Aerials w/1927 Carquinez Demos 5-25-06 |
West Approach Pre-F8U Demo 5-17-06 |
East Span Western Segment Lift 5-10-06 |
1927 Carquinez Bridge Lowering Unit #7 |
Marin 101 HOV Groundbreaking 5-2-06 |
Devil's Slide Repair Pacifica 4-18-06 |
Devil's Slide Repair Shamrock Ranch 4-19-06 |
Carquinez Bridge Demo 4-24, 25-06 |
Devil's Slide Blasting 4-20-06 |
SFOBB 80-Oakland & Stockton Aerials 3-6-06 |
SFOBB Construction & Aerials 3-6-06 |
Storm Damage Route 1 4-7-06 |
SFOBB & Benicia Aerials 3-10-06 |
Devil's Slide Construction 05-06 |
East Span Construction 3-2-06 |
Benicia Bridge Construction Jan-Feb 2006 |
Benicia Bridge Construction 1-10-06 |
West Approach Construction 1-9-06 |
|
2005
|
Benicia Bridge Construction 11-30-05 |
East Span Photos 11-30 & 12-13-05 |
West Approach Overview 10-19-05 |
East Span Concrete Pour 10-19-05 |
SFOBB Aerial Photos 11-2-05 |
Benicia Martinez Bridge Construction 09-08-05 |
Central Freeway Completed Photos 10-05-05 |
SFOBB Aerial Photos 9-6-05 |
West Approach Tendon Cutting | October 2005 |
Carquinez (1968) Deck Replacement Sept/Oct 05 |
West Approach Support Beam Install 9-25-05 |
680 HOV Lane Widening Completed 9-27-05 |
Central Freeway Widening Photos August 2005 |
SFOBB Concrete Pour 9-13-05 |
(1958) Carquinez Demolition Photos 9-27-05 |
West Approach Demolition 9-14-05 |
1927 Carquinez Pre Demolition Photos |
SFOBB Aerials 8-2-05 |
Stockton Aerials 8-2-05 |
Martinez Aerials 7-29-05 |
SFOBB Aerial Photos 7-5-05 |
East Span Construction Photos 7-19-05 |
Benicia Bridge & Toll Plaza Construction 7-6-05 |
BART Strike Press Conference 7-5-05 |
SFOBB Construction 5-24-05 |
New Benicia Bridge Aerials 4-12-05 |
West Approach Construction 05-16-05 |
West Approach Aerials to 4th Street 4-12-05 |
SFOBB Aerials 4-5-05 |
4th Street & West Approach Aerials 3-10-05 |
New Benicia Bridge Aerials 3-10-05 |
East Span Construction 2-1-05 |
East Span Construction 1-11-05 |
|
2004
|
SFOBB Aerial Photos 12-03-04 |
Benicia Construction June 2004 |
New Benicia Aerials 10-08-04 |
West Approach Construction & Aerials 7-7-04 |
SFOBB Construction Aerials 3-8-04 |
New Benicia Bridge Construction 2-26-04 |
Fremont Off Ramp Demolition 04-04-25 |
New Benicia Aerial Views 5-17-04 |
|
2003
|
Stockton Precast Aerials 8-28-03 |
SFOBB Construction Aerials 8/4/03 |
Carquinez Deck Photos |
SFOBB Construction Photos 3/4/03 |
|
2002
|
East Span Construction Project photos, August 2002. |
Historic Photos |
New SFOBB Artist Renderings |