Devil's Slide Improvement Project

Route 1 from Half Moon Bay Airport to Linda Mar Boulevard in Pacifica,

San Mateo County, California

DRAFT

SECOND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT/

SECOND SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT

ALL COMMENTS ON THIS DOCUMENT MUST BE MADE IN WRITING TO:

Robert Gross, Chief
Office of Environmental Planning, South
Caltrans District 4
P.O. Box 23660
Oakland, CA 94623-0660

10.0 TECHNICAL STUDIES


 

Archeological Survey Report for the Proposed Tunnel Alternative, Devil's Slide Improvement Project, 4-SMA-1 PM 34.0/41.0 (KP 54.7/66.0), San Mateo County, California

Prepared by; Caltrans, Office of Environmental Planning, South. June 19, 1998.

 

Biological Assessment, Species of Concern, Proposed Route 1 Devil's Slide Tunnel Bypass Project, San Mateo County, California

Prepared by; Caltrans, Office of Environmental Planning, South. July, 1998.

 

Devil's Slide Dewatering Feasibility Study

Prepared by; Caltrans, Engineering Service Center, Office of Structural Foundations, Roadway Geotechnical Engineering Branch (North). November, 1998.

 

Devil’s Slide Visual Impact Assessment

Prepared by; Caltrans, Office of Landscape Architecture. December, 1997.

 

Return to Devil's Slide EIS Table of Contents