| Contract No.... |
Location |
Description |
Advertise Date |
Bid Opening |
| BID OPENING FOR LAST 30 DAYS |
|
04-1A6814
|
Ala-880-28.2/29.9 |
Replace Concrete Pavement (rapid Strength Concrete).
|
07/19/10 |
10/05/10 |
|
04-0A8724
|
SM-1,35,82,84,101,etc.-Var |
Upgrade The Barrier And Guardrail End Terminals
|
07/26/10 |
10/12/10 |
|
04-4876A4
|
SCl-101-39.8/40.6 |
Replacement Highway Planting
|
08/02/10 |
10/13/10 |
|
04-3E1004
|
Ala-185-5.3/5.7 |
Cold Plane Pavement And Place Hot Mix Asphalt (type A).
|
03/19/12 |
04/24/12 |
|
04-2E2704
|
Son-12-T18.5/18.8 |
Cold Plane Asphalt Concrete And Bonded Wearing Course Overlay
|
03/19/12 |
04/24/12 |
|
04-2E0704
|
SCl-82-14.3/19.2 |
Cold Plane And Place Hot Mix Asphalt (open Graded).
|
04/02/12 |
04/25/12 |
|
04-4A07U4
|
Ala-580-R4.7/R8.2 |
Const Truck Climbing Lane, Ret. Walls, And Rehab Traveled Way
|
03/05/12 |
04/25/12 |
|
04-292264
|
Ala-80-2.5/3.3 |
Construct Multi-purpose Trail & Bikeway,with Ret Wall.
|
03/12/12 |
05/01/12 |
|
04-2E6504
|
Nap-121-9.4/22.0 |
Cold Plane And Overlay With Rubberized Hot Mix (gap Graded)
|
04/09/12 |
05/02/12 |
|
04-2E5104
|
Mrn-1-0.0/13.0 |
Bonded Wearing Course (gap Graded) Overlay
|
04/09/12 |
05/02/12 |
|
04-3A7204
|
SM-1-35.9 |
Install Left Turn Channelization Lane
|
04/16/12 |
05/08/12 |
|
04-2E5404
|
SM-82-0.0/2.7 |
Cold Plane Pavement And Overlay With Bonded Wearing Course
|
04/16/12 |
05/08/12 |
|
04-2G6304
|
SM-280-9.6/10.5 |
Cold Plane Pavement And Place Rubberized Hot Mix Asphalt (gap Graded).
|
04/16/12 |
05/09/12 |
|
04-2E5304
|
Son-1-30.5/50.6 |
Bonded Wearing Course Overlay.
|
04/16/12 |
05/09/12 |
|
04-283824
|
Son-116-41.8/44.7 |
Creek Realignment, Install Plants And Irrigation, Establish Planting
|
04/02/12 |
05/15/12 |
|
04-2G5904
|
Ala,SCl-85,101,880-44.0, 19.9, 20.8 |
Replace Damaged Overhead Signs.
|
04/23/12 |
05/15/12 |
|
04-2E5604
|
SM-101-12.0/13.5 |
Hot Mix Asphalt (bonded Wearing Course -gap Graded) Overlay
|
04/16/12 |
05/15/12 |
|
04-2E5504
|
SM,SCl-35-0.0/21.0 |
Place Asphalt-rubber Seal Coat
|
04/16/12 |
05/16/12 |
|
04-2E7704
|
Ala,SF,SM,SCl,Sol,Son-17,24,37,80,87,etc-Var |
Upgrade Xenon Cms To Led Modules
|
04/23/12 |
05/16/12 |
| BID OPENING FOR THE NEXT 6 MONTHS |
| DVBE Notice |
|
04-0120T4
|
SF-80-12.6/13.9 |
Construct Bridge, Roadways, Electrical, Buildings And Remove Bridges
|
04/09/12 |
09/25/12 |
.
The responses to bidder' inquiries, unless incorporated into a formal addenda to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder' inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.