Sacramento 50 Bus-Carpool Lane and Community Enhancements Project
Please be aware that this document is in a portable document format (PDF). If you are unable to download the full document in one attempt, try downloading the smaller chapter groups listed below.
Due to the large file sizes, some of the figures referenced in the document are located under the link titled figures.
SAC 50 Bus/Carpool Lane and Community
Enhancements Project
|
|
| Full Document (44.5Mg) | Letters (3.04Mg) |
| Pages 1-16 (152Kb) | Public Comments A (6.81Mg) |
| Chapter 1 (96Kb) | Public Comments B (9.59Mg) |
| Chapter 2 (1.14Mg) | Public Comments C (11.30Mg) |
| Chapter 3 - 7 (71Kb) | Response To Comments (122Kb) |
| Appendices A-K (2.04Mg) | Figures |
US 50 Final Corridor Advisory Committee Report, November 2003Please be aware that these documents are in portable document format (PDF). Alternatives Currently Under Consideration Notice of Preparation ( 228K)b Notice of Preparation Location Map (251Kb) Community Enhancements (578Kb) Frequently Asked Questions (FAQ) For additional delivery methods, please contact: Ken Lastufka |
|
