California Department of Transportation
 
 

Sacramento 50 Bus-Carpool Lane and Community Enhancements Project

Please be aware that this document is in a portable document format (PDF). If you are unable to download the full document in one attempt, try downloading the smaller chapter groups listed below.

Due to the large file sizes, some of the figures referenced in the document are located under the link titled figures.

SAC 50 Bus/Carpool Lane and Community Enhancements Project
Final Environmental Impact Report/Environmental Assessment

Full Document (44.5Mg) Letters (3.04Mg)
Pages 1-16 (152Kb)
Chapter 1 (96Kb) Public Comments B (9.59Mg)
Chapter 2 (1.14Mg) Public Comments C (11.30Mg)
Chapter 3 - 7 (71Kb) Response To Comments (122Kb)
Appendices A-K (2.04Mg) Figures

US 50 Final Corridor Advisory Committee Report, November 2003

Please be aware that these documents are in portable document format (PDF).

US 50 Final Corridor Advisory Committee (CAC) Report (1.24Mb)

Alternatives Currently Under Consideration

Frequently Asked Questions (FAQ)
Statewide High-Occupancy Vehicle (HOV) Issues (PDF- 42Kb)

For additional delivery methods, please contact:

Ken Lastufka
Associate Environmental Planner
Venture Oaks
2389 Gateway Oaks Drive, Suite 100
Sacramento, CA 95833
E-mail: ken_lastufka@dot.ca.gov