May 11 - 17, 2008
LONG TERM PROJECTS
Interstate 5 (Sacramento County): Work is underway on a $20 million
project to improve the pavement on Interstate 5 between State Route 160 to P
Street in Sacramento. Completion is
expected in 2009.
May
12-16
On
Interstate 5 from Beach Lake to the American River Bridge: Motorists can expect various north and
southbound lanes closed from 8 p.m. to 5 a.m. (7 a.m. Saturday) Monday
through Friday nights. A contractor
is scheduled to do paving.
May
11
On
Interstate 5 at Sutterville Road:
Motorists can expect full ramp closures from 6 a.m. to 3 p.m. Sunday. A contractor is scheduled to do paving.
Interstate 80 (Placer County): Work is underway on a $25 million project by Caltrans, Placer County, the City of Rocklin and the Placer County
Transportation Planning Agency to rebuild and modernize the I-80 interchange at
Sierra College Boulevard. The project
will upgrade the overcrossing to five lanes, bike lanes, sidewalks and increase
vertical clearance. Completion is expected in 2008.
May
12 - 15
On
Interstate 80 at Sierra College Blvd:
Motorists can expect various east and westbound lane closures from 10
p.m. to 5 a.m. Monday through Thursday nights. A contractor is scheduled to do miscellaneous construction
work.
State Route 99 (Sacramento County): Work is underway on a $24 million
project to improve the Grant Line Road Interchange in the City of Elk
Grove. Completion is expected in the
summer of 2008.
May
12 - 16
On
Interstate 80 from Grant Line Road to Elk Grove Blvd: Motorists can expect various north and southbound lane closures
from 9 p.m. to 6 a.m. Monday through Friday nights. A contractor is scheduled to do
miscellaneous construction work.
May
12 - 16
On
Interstate 80 from Grant Line Road to Elk Grove Blvd: Motorists can expect full highway closure from 10 p.m. to 5
a.m. Monday through Friday nights.
A contractor is scheduled to do miscellaneous construction work.
State Route 99 (Sacramento County): Work is underway on a $26.1
million project to improve the Sheldon Road Interchange in the City of Elk
Grove. Completion is expected in the
summer of 2008. No traffic interfering
work is scheduled.
SHORT-TERM PROJECTS
Interstate 5 (Sacramento County) from Q Street to J Street: Motorists can expect
various north and southbound lanes closed from 10 p.m. to 5 a.m. (7 a.m.
Saturday) Monday through Friday. A contractor is
scheduled to do miscellaneous construction work.
Interstate 5 (Sacramento
County) from Beach Lake to Landpark:
Motorists can expect the north and southbound #4 lane closed from 10
p.m. to 5 a.m. (7 a.m. Saturday) Monday through Friday. A contractor is scheduled to install guardrail.
Interstate 5 (Sacramento County) at P Street: Motorists can expect the southbound on-ramp
closed from 9 p.m. to 5 a.m. Monday through Friday nights. A contractor is scheduled to do survey work.
Interstate 5 (Sacramento County) at U.S. Highway
50: Motorists can expect the southbound
off-ramp to U.S. Highway 50 closed from midnight to 5 a.m. Monday through
Saturday. A contractor is scheduled
to do survey work.
Interstate 5 (Yolo
County) from Brentona Creek to Oat Creek: Motorists can expect the northbound
#2 lane and right shoulder closed from 8 a.m. to 3:30 p.m. Tuesday. A Caltrans crew is scheduled to do slab
repairs.
Interstate 5 (Yolo County) from State Route 505 to
Dunnigan: Motorists can expect various
southbound lane closures and a partial ramp closures from 6 a.m. to 6 p.m.
Monday through Friday. A contractor
is scheduled to paving.
State Route 16 (Yolo
County) from County Road 40A to County Road 18 (aka County Road 97A): Motorists
can expect intermittent one-way traffic control from 7 a.m. to 4 p.m. Monday through Friday. A contractor is scheduled to do utility work and trim trees.
State Route 16 (Yolo
County) from First Street to Interstate 5: Motorists can expect east and
westbound right shoulders closed from 6
a.m. to 4 p.m. Monday through Friday.
A contractor is scheduled to do utility work.
State Route 16 (Yolo
County) from Murieta Parkway to Cosumnes River: Motorists can expect one-way
traffic controls from 9 a.m. to 2 p.m.
Wednesday through Friday. A
Caltrans crew is scheduled to do shoulder work.
State Route 16 (Yolo
County) at County Road 85: Motorists can expect east and westbound right
shoulders closed from 7 a.m. to 4 p.m.
Monday through Saturday. A
contractor is scheduled to construct sidewalks.
State Route 16 (Yolo
County) at Fremont Avenue: Motorists can expect east and westbound right
shoulders closed from 7 a.m. to 6 p.m.
Tuesday through Friday. A
contractor is scheduled to do utility work.
U.S. Highway 50 (Yolo and
Sacramento Counties) from Harbor Blvd to Mather Field: Motorists can expect the eastbound #4 lane
closed from 9 p.m. to 5 a.m. Monday through Friday nights. A contractor crew is scheduled to install
guardrail.
U.S. Highway 50 (Sacramento
County) at 48th Street:
Motorists can expect various westbound lane and ramp closures from 9
p.m. to 5 a.m. Sunday and Monday nights.
A contractor crew is scheduled to electrical work.
U.S. Highway 50 (Sacramento
County) from Folsom Blvd to Hornet Drive:
Motorists can expect partial eastbound ramp closures from 10 p.m. to
5 a.m. Wednesday through Friday nights.
A contractor crew is scheduled to electrical work.
U.S. Highway 50 (Sacramento
County) from Fair Oaks to Sunrise Blvd:
Motorists can expect various westbound lane closures from 10 a.m. to
1 p.m. Friday. A Caltrans crew is scheduled
to pothole work.
U.S. Highway 50 (Sacramento
County) at East Bidwell/Scott Road:
Motorists can expect various eastbound lane closures from 10 p.m. to
6 a.m. Sunday through Thursday nights.
A contractor crew is scheduled to drainage work.
U.S. Highway 50 (Yolo County)
at Harbor Blvd: Motorists can expect
partial westbound ramp closures from 7:30 p.m. to 5 a.m. Monday through
Friday nights. A contractor crew is
scheduled to utility work.
State Route 51 (AKA Capital City Freeway) (Sacramento County) from
Oak Park to Watt Ave.: Motorists can
expect the north and southbound #4 lane closed from 9 p.m. to 5 a.m. (9 a.m. Saturday) Monday through Saturday. A contractor crew is scheduled to install
guardrail.
State Route 51 (AKA Capital City Freeway) (Sacramento County) from H
Street to State Route 160: Motorists
can expect various north and southbound lane closures from 10 p.m. to 5 a.m.
Monday through Saturday. A
contractor crew is scheduled to do median repair work.
State Route 65 (Placer County) at Pleasant Grove Blvd: Motorists can expect the northbound #2 lane
closed from 9 p.m. to 5 a.m. Monday through Thursday nights. A contractor is scheduled to do
miscellaneous construction work.
Interstate 80 (Sacramento County) from the Sacramento River to
Auburn Blvd/Riverside Avenue: Motorists
can expect the west eastbound #4 lane closed from 8 p.m. to 5 a.m. Monday
through Friday. A contractor is
scheduled to install guardrail.
Interstate 80 (Sacramento County) at Madison Avenue: Motorists can
expect partial eastbound off-ramp closures from 9 a.m. to 2 p.m. Sunday
through Saturday. A contractor is
scheduled for permit work.
Interstate 80 (Yolo County) at the Yolo Causeway: Motorists can
expect various eastbound lane closures from 9 p.m. to 5 a.m. Monday. A contractor is scheduled for electrical
work.
Interstate 80 (Yolo County) from U.S Highway 50 to Lake
Washington: Motorists can expect
various eastbound lane closures from 9 p.m. to 5 a.m. Monday. A contractor is scheduled for electrical
work.
State Route 99 (Sacramento County) at the Consumnes River Overflow:
Motorist can expect the #2 northbound lane closed from 8 p.m. to midnight on
Thursday. A contractor is scheduled
to do grinding work.
State Route 99 (Sacramento County) from 21st Avenue to
the U.S. Highway 50/Capitol City Freeway interchange: Motorists can expect the
northbound #4 lane closed from 8 p.m. to 5 a.m. Monday through Friday. A contractor is scheduled to install
guardrail.
State Route 99 (Sacramento County) at Florin Road: Motorists can expect the northbound on-ramp
closed from 8 p.m. to 5 a.m. Wednesday and Thursday nights. A Caltrans crew is scheduled to do paving.
State Route 99 (Sacramento County) at Broadway: Motorists can expect the southbound on-ramp
closed from 8 p.m. to 5 a.m. Monday and Tuesday nights. A Caltrans crew is scheduled to do paving.
State Route 99 (Sacramento County) from 2nd Avenue to 5th
Avenue: Motorists can expect the
southbound #2 lane closed from 8 p.m. to 5 a.m. Monday and Tuesday nights. A Caltrans crew is scheduled to do paving.
State Route 160 (Sacramento County) from the Sacramento City limit to
State Route 51 (AKA the Capitol City Freeway):
Motorists can expect the northbound #2 lane closed from 7 p.m. to 10
a.m. Monday through Friday. A
contractor is scheduled to install guardrail.
##
The Caltrans District Traffic Management
Branch has reviewed each project and determined that individual project delays
are expected to be less than the statewide policy maximum of 30 minutes, unless
noted otherwise above.
Lanes are numbered from the center divide (#1) to the shoulder (#2, 3, 4, etc.).
Unexpected
schedule changes may occur. For current information on roadwork, delays, road
conditions and emergency closures, call the voice-activated Caltrans Highway
Information Network (CHIN) at 800-427-7623 (ROAD) or visit the Caltrans website
at: http://www.dot.ca.gov/
For the latest chain control information in
the Northern Sierra, visit the Caltrans District 3 North Region Winter Operations
website located at: http://www.dot.ca.gov/dist3/departments/mtce/controlmp.htm