North Region Construction - Project
Contract |
Bid Date |
County Route PM/KP |
Description |
03-2E0804 |
07/15/08 |
PLA-080-069.0 | INSTALL OVERHEAD EXIT SIGN, CLOSED CIRCUIT TELEVISION, CONTROLLER, AND CABINET |
Bid Items |
Specials, Plans & Addenda |
Plan Holders |
Order Bid Doc |
|
Bidder Inquiry / Response |
06/20/08
|
Inquiry: Is there a geological report or boring log for this project? If so where can I obtain it? Please let me know as the drillers that we have contacted have all requested this information. |
' |
|
6/20/08
|
Response:
There are no geological reports or boring logs for this location. |
7/7/08
|
Inquiry: Note 12 sheet E-1 send you to sheet E-3 for mounting details.Is it the State's whish to mount the camera on a CCTV 5? Or CCTV 10? |
7/12/08 |
Addenda No. 2, issued July 10, 2008 addressed this issue. The addenda may be found on the internet at the following address: |
7/10/08
|
Inquiry: Sheet E1 Detail A shows the CCTV mounted on top of the sign structure. The Camera Mounting DFetail on sheet E-3 shows the camera mounted on a pole. The specials call out for sign illumination. Nowhere do you reference on the plans on how you want this done. The standard plans show a mast arm for illuminating the sign but there is no way to mount the camera and if you mount the camera some how on top of the pole the mast arm will disrupt the viewing area. What do you want done and how? |
7/12/08 |
Addenda No. 2, issued July 10, 2008 addressed this issue. The addenda may be found on the internet at the following address: |
7/11/08
|
Inquiry: Addendum 2 addressed the issue of mounting the camera to the sign structure. This was done by using Standard Plan ES-16B, Standard Plan ES-6K (Lighting Standards for Type 5 & Type 10 Overhead Signs) has an all together different pole with mast arm. What do you want? |
7/14/08 |
No reference is made in addendum No. 2 to standard plan ES-6K. Standard plan ES-6K is applicable for Lighting Standard. Standard plan ES-16B is applicable for CCTV. Please bid per the contract documents (including all addenda issued for this project). Thank you for your patience. |
7/11/08
|
Inquiry: Who is the general contractor for the above project? |
7/12/08
|
Response: You may call: (916) 227-6234 to obtain the plan holders list. Also, Caltrans maintains a website with this and other information. Please bookmark the following website for future reference: http://www.dot.ca.gov/hq/esc/oe/contractor_info/ In the second column from the left of the table there is a link to Plan Holders List. Click on that link to access the searchable database of plan holders. Once a contract number is entered and the find records button is clicked, a list of plan holders for that contract will be displayed. Other search options are available as well, such as searching by contractor and bid opening date. |
'
|
Inquiry: |
'
|
Response: |
| The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given. |