North Region Construction - Projects Out to Bid
Advertised Projects / Upcoming Bid Dates |
Contract#
|
Bid Date
|
County Route PM/KP
|
Description |
Minor B |
02/18/10 |
Hum- | CONSTRUCT STORM DRAIN |
|
Minor B |
02/11/10 |
Lake- | INSTALL HIGHWAY LIGHTING |
02/24/10 |
Hum-299-R8.0/R22.7 | REPLACE CSP CULVERTS AND CONSTRUCT ROCK SLOPE PROTECTION. | |
03/09/10 |
Men-162-20.0/21.2 | REPAIR STORM DAMAGE | |
02/23/10 |
Hum-299-36.9/39.2 | REPLACE ASPHALT CONCRETE SURFACING. | |
03/03/10 |
Sha-299-23.7 | INSTALL SIGNALS | |
02/02/10 |
Las-395-R4.6/R24.7 | THIN BLANKET OVERLAY |
|
01/27/10 |
Teh-36-67.5/75.5 | THIN BLANKET OVERLAY |
|
02/23/10 |
Las-44-14.9/37.2 | THIN BLANKET OVERLAY | |
02/09/10 |
Plu-70-R66.4/71.5 | THIN BLANKET OVERLAY WITH DIGOUTS | |
03/16/10 |
Sha-5-0.9/R4.3 | THIS PROJECT HAS A MANDATORY PRE-BID MEETING WIDEN ROADWAY WITH HMA OVER AB. |
|
02/09/10 |
Sac-50, 51, 80, 99, 104-Var | COLD PLANE AC PAVEMENT AND PLACE OPEN GRADED HMA OVERLAY |
|
03/09/10 |
Sac-5501 | CONSTRUCT STORAGE BUILDING AND REPAIR SHOP | |
02/09/10 |
But-162-0.0/9.6, R9.9/13.9 | CHIP SEAL TO BE APPLIED | |
02/23/10 |
Gle-32-R4.3/R4.8,5.9/10.8 | RUBBERIZED HMA OVERLAY, MBGR, THERMOPLASTIC TRAFFIC STRIPING. | |
02/24/10 |
But,Gle-32, 99-var | BRIDGE DECK OVERLAY TO BE PLACED ON 5 STRUCTURES | |
02/02/10 |
Sac,Yol-50-VAR | REPLACE JOINT SEALS, REPLACE PCC, APPLY METHACRYLATE | |
02/23/10 |
Nev-20-38.2/40.9 | CLEAN AND LINE CULVERTS | |
03/02/10 |
Sac-5-0.5/15.4 | PCC SLABS TO BE REPLACED AND AC SHOULDER TO BE REPAIRED | |
02/17/10 |
ED-50-32.5/39.7 | PLACE RECESSED TRAFFIC STRIPES AND REPLACE PAVEMENT MARKINGS |
|
| The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given. |