California Department of Transportation
 

North Region Construction - Projects Out to Bid

Advertised Projects / Upcoming Bid Dates

Contract#
Bid Date
County Route PM/KP
Description
06/30/09
Men-20-25.9 REPAIR STORM DAMAGE
07/14/09
Hum-36-40.4 REPAIR STORM DAMAGE AND CONSTRUCT RETAINING WALL.
07/07/09
Men-253-1.7/2.3 CONSTRUCT TIEBACK RETAINING WALL AND PLACE HMA OVER CL2 AB
07/21/09
Men-101-R85.0/R85.5, R87.0,/R87.5 ROADWAY STRUCTURAL SECTION, RECONSTRUCT MBGR, CUTSLOPE DOWNDRAIN.
07/01/09
Sis-96-28.8/29.2 IMPROVE SUPER ELEVATION
07/14/09
Sis-5-R51.1/R58.1 SLAB REPLACEMENT
06/24/09
Sis-5-2.0/2.5 INSTALL PIPELINER TO REPAIR CULVERT
06/30/09
Plu-70-R79.1 REPLACE SAFETY ROADSIDE REST AREA
08/04/09
Sha-5-R63.2/R65.8 BRIDGE REPLACEMENT.
6/23/09
Teh-5-40.6 CONSTRUCT WEIGH IN MOTION SCALES.
06/17/09
Nev-80-17.3/20.3 STORM WATER MANAGEMENT
07/01/09
Sac-51-9.7/13.4 PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM
07/01/09
But-70-18.7/21.9 WIDEN HIGHWAY TO FOUR LANES AND MODIFY SIGNAL AND LIGHTING.
06/23/09
Sut-99-40.3 PLACE HMA AND MODIFY TRAFFIC SIGNAL.
06/24/09
Yub-20-10.2/13.4 HOT MIX ASPHALT (BONDED WEARING COURSE- OPEN GRADED)
07/07/09
Pla-80-4.5/8.3 CONSTRUCT HOV LANES
07/21/09
Sac-50-R5.3/12.8 WIDEN FREEWAY WITH HMA OVER CL 2 AB, INCLUDING STRUCTURES
07/01/09
Nev-80-5.6 REPLACE COMFORT STATIONS AT SAFETY ROADSIDE REST AREA.
07/08/09
But-70-13.5/16.9 UPGRADE GUARDRAIL AND GORE AREAS



Same Day bid opening results can be heard by calling (916) 654-5500.

Results and bid summaries are posted at: http://www.dot.ca.gov/hq/esc/oe/bidsopened.htm


All bidder inquiries, request for cross sections, permits, as-builts, and reports referenced in these specifications are to be FAXED or emailed to the North Region Construction Office at:_email: inquiry_nr_bid@dot.ca.gov

Fax No.: (530) 822-4324
___or
Electronic Bidder Request Form


 
The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.