North Region Construction - Projects Out to Bid
Advertised Projects / Upcoming Bid Dates |
Contract#
|
Bid Date
|
County Route PM/KP
|
Description |
09/09/08 |
Hum-101-089.1/R090.4 | CONSTRUCT CIP PS CONCRETE BOX GRINDER BRIDGE ON STEEL SHELL CONCRETE PILES. |
|
08/12/08 |
Hum-101-R66.8/R67.4 (KP) | CONSTRUCT SOLDIER PILE TIEBACK RETAINING WALL |
|
07/08/08 |
Lak-029-R39.6/R40.6 (PM) | COLDPLANE AND PLACE HMA (TYPE A) AND |
|
07/08/08 |
DN-199-9.1/9.5 (PM) | REPLACE CULVERT AND PLACE HOT MIX ASPHALT ON EXISTING SURFACING | |
08/19/08 |
Las-036-36.2/39.3 (KP) | RESURFACE SHOULDER WITH HMA (TYPE A) OVER CL 2 AB | |
08/19/08 |
Plu-070-43.0/44.0 (PM) | RELOCATE CROSS WALKS & CONSTRUCT NEW RAMPS | |
|
Nev-080-R5.2/R11.2, 13 (PM) | PCC PAVEMENT, HMA SURFACING, AND DRAINAGE REHABILITATION | |
08/05/08 |
Yub-070-14.7/25.8 (PM) | COLD PLANE AND OVERLAY WITH HOT MIX ASPHALT (TYPE A) | |
07/08/08 |
Sut-99,113-26.6/37.4,25.7/R26.6 (PM) | CONSTRUCT 4-LANE EXPRESSWAY AND PAVE WITH ASPHALT CONCRETE OVER AB | |
07/15/08 |
PLA-080-069.0 | INSTALL OVERHEAD EXIT SIGN, CLOSED CIRCUIT TELEVISION, CONTROLLER, AND CABINET | |
08/06/08 |
Gle-162-76.7 (PM) | PLACE ROCK SLOPE PROTECTION | |
08/26/08 |
Nev, Sie-080-28.1/31.8, 0.0/1.6 (PM) | ROADWAY REHABILITATION | |
07/16/08 |
Yub-049-5.9 (PM) | SLOPE REPAIR, EROSION CONTROL, AND DRAINAGE IMPROVEMENTS | |
08/19/08 |
Nev-049-20.5/20.6 (PM) | REPAIR EMBANKMENT AND RECONSTRUCT METAL BEAM GUARDRAIL | |
07/30/08 |
But-070- 038.100 (PM) | PLACE ROCK SLOPE PROTECTION, HORIZONTAL DRAINS AND UNDERDRAIN |
|
| The responses to bidder's inquiries, unless incorporated into a formal addendem to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidder's inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given. |

