| CONTRACT NO: | 11-243704 |
| ROUTE / KP | 11-SD-5-R45.3/R47.4 |
| LOCATION | In San Diego County In San Diego From Nobel Drive Overcrossing To Genesee Avenue Overcrossing. |
| DESCRIPTION | Replace Existing Cable Barrier With A Concrete Median Barrier. |
| ESTIMATE | $ 3,085,000.00 |
| ADVERTISE DATE | 04/15/02 |
| BID OPENING | 05/16/02 |
| FINAL POSTING | 05/15/02 @ 16:40 |
|
|
BEADOR CONSTRUCTION CO | $ 1,732,700.00 |
|
|
HAZARD CONSTRUCTION CO | $ 1,770,922.00 |
|
|
MODEN ALLOYS | $ 1,818,302.04 |
The Caltrans District 11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that Contract,
but reserves the right to not answer any questions deemed unsatisfactory
for public viewing.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
05/02/02 |
|
|
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
Q:04/16/02 R:04/29/02 |
Plan Sheet / Specification Reference=NOTICE
TO CONTRACTORS
Where are the cross sections available?
|
|
|
|
|
Q:04/16/02 R:05/07/02 |
Plan Sheet / Specification Reference=12
Remove Painted Traffic Stripe ( Yellow ) M 4940, Plan Sht. # 36 (TH
- 1 Traffic Handling Plan ), Special Prov. Page # 89 ( Remove
Traffic Stripe )
The SB section of I-5 was recently surface ground and the shoulders repaved ( within the last year ). If I am correct, the yellow paint that is currently in place is "new" and therefore "lead free" per caltrans specs at the time it was placed... If this is the case, then the quantity for Item # 12 is incorrect. Please Advise.
|
|
Q:04/19/02 R:05/07/02 |
Plan Sheet / Specification Reference=Item
# 12
Upon further review, the median shoulders that are shown to have yellow stripe removed are also shown to be cold planed it seems redundant to also do an expensive paint removal process on something that will be eradicated by another process...
|
|
Q:04/23/02 R:05/14/02 |
Plan Sheet / Specification Reference=ITEM
33, CONCRETE BARRIER (TYPE 60S) 4240 METERS
WHY IS THAT ITEM NOT A SPECIALTY ITEM?
|
|
Q:05/07/02 R:05/07/02 |
Plan Sheet / Specification Reference=8.
TEMPORARY RAILING (TYPE K) SEE TRAFFIC HANDLING PLANS TH-1 AND TH-2
YOUR TRAFFIC HANDLING PLAN SHOWS BOTH NORTHBOUND AND SOUTHBOUND TEMPORARY K-RAIL BEING INSTALLED SIMULTANEOUSLY. IS THIS NECESSARY? COULD YOU PHASE IT?
|
|
Q:05/13/02 R:05/14/02 |
Plan Sheet / Specification Reference=Item
#1 Temporary Concrete Washout (Portable)
Bid Item is listed as Each for Unit of Measure. Section 10-1.05 of the Special Provisions states that Item #1 will be paid for as Contract Lump Sum. Lump Sum appears to be the proper unit for payment. Please advise.
|
|
Q:05/14/02 R:05/14/02 |
Plan Sheet / Specification Reference=Special
provisions page 96 section 10-1.34
Is it the intent of this section to paint both sides of both rails?
|
|
Q:05/15/02 R:05/15/02 |
Plan Sheet / Specification Reference=Special
Provisions Section 10-1.37 IRRIGATION CROSSOVERS
The section requires that "Conduits be placed in open trenches in...." and that "Conduits shall be corrugated high density polyethylene (CHDPE) pipe." Since the crossovers as shown on the plans cross the the entire width of the freeway will it be allowable to use the open trench method? Please clarify?
|
|
Q:05/15/02 R:05/15/02 |
Plan Sheet / Specification Reference=Aerially
Deposited Lead
In Section 10-1.26 it states that the "Type Z-2 material contains average concentrations greater than or equal to 5.0 mg/L Soluuble Lead..." How much greater and where?
|