Concrete Median Barrier.
Advertise
Date 01/29/01
Bids
Open
03/08/01
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Only when stated
in the Special Provisions will contracts have posted INQUIRIES AND RESPONSES.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
Caltrans District 11 Construction Department
will post all of the questions submitted by any of the contractors that
are registered Planholders for that Contract, but reserves the right to
not answer any questions deemed unsatisfactory for public viewing.
|
|
|
|
|
|
Inquiry |
|
|
Are the cross sections available?
|
|
|
How do we obtain full size plan sheets?
They can be printed directly from the above listed site or downloaded for printing at any available reprographics company. |
|
|
Plan Sheet / Specification Reference=Item
#3 TEMPORARY CONSTRUCTION ENTRANCE
There is no construction detail sheet in the project plans.
|
|
|
Plan Sheet / Specification Reference=SPECIAL
PROVISION SECTION 10-1.40, PLAN SHEET 47 (C-1), Item #31: SINGLE THRIE
BEAM BARRIER
Plan details on C-1 include unusual post size and spacing for single thrie beam barrier at K-RAIL to K-RAIL locations. Standard Plans A78F and A78G are different. Due to the multiple bridge rail connections, we request a similar construction detail for K-RAIL to BRIDGE RAILS.
|
|
|
Plan Sheet / Specification Reference=Plan
Sheet 48 (C-2), Section A-A
Section A-A calls for scuppers at 3.0 m while both the Plan and Elevation views show the scuppers at 3.76 m center to center. Please verify the intent to use the 3.76 m center to center spacing for the scuppers.
|
|
|
Plan Sheet / Specification Reference=Section
10-1.01 ORDER OF WORK, Item 10: REMOVE CABLE BARRIER
Can cable barrier removal from Sta. 518+00 to 551+00 happen prior to temporary k-rail installation?
|
|
|
Plan Sheet / Specification Reference=Section
10-1.38 CONCRETE BARRIER- paragraph 2 & 3 and Section 10-1.39 CONCRETE
BARRIER (TYPE K)-paragraph 5 & 6
"The top and side surfaces of concrete
barriers which face traffic shall be abrasive blasted to produce a generally
uniform color and sandy texture with air and water bubbles in the concrete
exposed.
Are both side surfaces and top to be prepped and painted or only the top and side toward traffic?
|
|
|
Plan Sheet / Specification Reference=Section
10-2.02 PRUNE EXISTING PLANTS and plan sheet HP-32 PRUNING CROSS SECTION
Is mowing an allowable method?
|