| CONTRACT NO: | 11-232924 |
| ROUTE / KP | 11-SD-94,125-R16.7/R17.2,21.9/22.5 |
| LOCATION | In San Diego County In La Mesa On Route 94 From 94/125 Separation To 0.2 Km West Of Campo Road Overcrossing And On Route 125 From 0.3 Km South To 0.3 Km North Of Panorama Drive Undercrossing. |
| DESCRIPTION | Modify Existing Freeway Separation With Additional Lane To Be Constructed And Bridge To Be Widened. |
| ESTIMATE | $ 2,152,674.00 |
| ADVERTISE DATE | 06/11/01 |
| BID OPENING | 07/19/01 |
| FINAL POSTING | 07/19/01 @ 10:40 |
|
|
SCHEIDEL CONT | $ 1,756,103.40 |
|
|
BEADOR CONST | $ 1,875,000.00 |
|
|
T M ENGINEERING | $ 1,901,363.00 |
The Caltrans District 11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered. Planholders for that Contract,
but reserves the right to not answer any questions deemed unsatisfactory
for public viewing.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
06/15/01 |
07/02/01 |
07/10/01 |
07/13/01 |
|
|
Inquiry |
|
Q:06/13/01 R:06/25/01 |
When will the cross sections be available
and where?
Paper copies are available at our office at 2829 Juan Street, please call for availability, or through: MESA
BLUEPRINT
|
|
Q:06/19/01 R:06/19/01 |
Where can we get full size plans?
or through: MESA
BLUEPRINT
|
|
Q:06/18/01 R:06/28/01 |
Plan Sheet / Specification Reference=Bid
item 4, Temporary Concrete Washout,
section 10-1.06 of Special Provisions Section 10-1.06 states a "temporary
concrete washout will consist of a commercially available 208 liter drum."
And that "Temporary concrete washout
will be measured by the unit as determined from actual count in place."
|
|
Q:06/19/01 R:07/02/01 |
Plan Sheet / Specification Reference=Plan
sheets 81 through 85
I have not found a dimension for the width of the in fill walls. Please provide.
|
|
Q:06/27/01 R:06/27/01 |
Plan Sheet / Specification Reference=CONCRETE
PAVEMENT (WITH DOWELED TRANSVERSE WEAKENED PLANE JOINTS) of the Special
Provisions, Plan sheet 52 of 96
The Special Provisions refers to DOWELED WEAKENED PLANE JOINTS but the Revised Standard Plan RSP A35A shows UNDOWELED TRANSVERSE JOINTS, please clarify what is required?
|
|
Q:06/29/01 R:07/13/01 |
Plan Sheet /
Specification Reference=Item 23 ROADWAY EXCAVATION, Plan Sheet 42 of 96,
SUMMARY OF QUANTITIES for EMBANKMENT QUANTITY OF 3,277 M3
After taking off the excavation and embankment quantities from the cross sections, the quantity of embankment shown on the plan sheet #42 is incorrect. It looks like the area between Stations 180+00 to 180+78 was included in the embankment when it is actually a bridge over Panorama Drive, please clarify. Does Caltrans have a dump site?
|
|
Q:007/6/01 R:07/13/01 |
Plan Sheet /
Specification Reference=Section 10-1.13 MAINTAINING TRAFFIC
The Special provisions have not provided a traffic chart for the westbound route 94 off ramp to Spring Street. There is an overhead sign Structure to be installed on this ramp that will require a ramp closure. Does Caltrans intend to issue a traffic chart for this ramp?
|
|
Q:07/06/01 R:07/13/01 |
Plan Sheet /
Specification Reference=Section 10-1.13 MAINTAINING TRAFFIC, TRAFFIC
CHARTS 3 & 4
The charts state that no work that interferes with public traffic will be allowed between 5:00 AM and 9:00 PM. Work associated with the construction of the Panorama drive UC will require traffic control on Panorama and Bowling Green, both of which have very light traffic. Is it the intent of this specification to force the contractor to work at night in a residential area when the work could be done during the day with minimal impact to traffic?
|
|
Q:07/10/01 R:07/10/01 |
Plan Sheet / Specification Reference=Item
72 Cable restrainer sheet 87
Note in the center of the page "Restrainer
unit over each girder..." points to only 2 girders.
|
|
Q:07/10/01 R:07/13/01 |
Plan Sheet /
Specification Reference=
The construction of the infill walls will require excavation of Panorama. The only traffic control for this area is one-way at night. This work should be done behind k-rail. Can the item for k-rail and tcc be increased to include this work?
|
|
Q:07/11/01 R:07/19/01 |
Plan Sheet / Specification Reference=Section
10.33 "Concrete Pavement".
Section 10.33 "Concrete Pavement..." requires the placement of the test strip of not more than 300 meters or not less than 200 meters in length. Furthermore, this test strip must not only meet, but exceed the contract requirements of Section 40-1.10 "Final Finishing" because, according to the Special Provisions, THE ENTIRE STRIP SHALL BE REJECTED IF ANY GRINDING IS REQUIRED. The entire length of the concrete pavement section is 370 meters. This requirement of the completion of a test strip, representing from 54% to 81% of the entire project, conforming to Section 40-1.10, WITHOUT ANY GRINDING, is simply not feasible, either from an economic, or engineering standpoint. Please state that this requirement shall be waived or consider removing the Test Strip requirement from the Special Provisions.
1. The Contractor
proposes using different paving equipment including the batch plant, paver,
dowel inserter, tie bar inserter, tining, or curing equipment, or
The Contractor
shall perform coring of the test strips, as directed by the Engineer, as
part of the dowel or tie bar placement tolerance verification. A
minimum of six dowel bars shall be cored for each test strip. After
removal of cores, voids in concrete pavement shall be cleaned and filled
with hydraulic cement grout conforming to the provisions in "Core Drilling
for Dowel Placement Alignment Assurance Testing" of these special provisions.
|
|
Q:07/12/01 R:07/13/01 |
Plan Sheet /
Specification Reference=
Sheet 1 of the plans shows begin construction at Sta 178+00 and end construction at Sta 183+20 ( PM 14.0) of the "E" Line. Sheet 7 (Layout) of the the plans shows constructing starting at Approx. station 179+60 and ending at 184+70 on the "E" Line. Sheet 10 (profile) of the plans shows construction starting at Sta 15+28 of the "AA" line and matching existing or ending at Sta 182+66 of the "E" line. It also states that between these 2 stations there is 3162 M3 of Excavation and 3278 M3 of Embankment. Sheet 17 shows that the bulk of the excavation on the project is up station from Sta 183+00.
|
|
Q:07/13/01 R:07/16/01 |
Plan Sheet /
Specification Reference=Plan Sheet 5, Sta 131+90. Plans indicate
installation of two crash cushion arrays, Type B14.
Plans indicate installation of two crash cushion arrays, Type B 14. There is not a bid item for temporary or permanent crash cushion arrays, nor are any shown on the quantity sheets. Are these arrays to be temporary or permanent and which bid item will they be paid under?
|
|
Q:07/17/01 R:07/18/01 |
Plan Sheet /
Specification Reference=Bid Items # 1,2, 3, & 4.
With the exception
of bid item No. 4 (temp. concrete washout), it appears that the payment
for SWPPP items are included in the various items of work.
|
|
Q:07/19/01 R:07/19/01 |
Plan Sheet /
Specification Reference=Special Provisions Section 10-1.33 CONCRETE PAVEMENT
(WITH DOWELED TRANSVERSE WEAKENED PLANE JOINTS)
What is the requirement for the Longitudinal Isolation Joints?
|
OTHER LINKS OF INTEREST
BIDDER'S INQUIRIES & RESPONSES