| CONTRACT NO: | 11-199344 |
| ROUTE / KP | 11-IMP-111-R20.7/R28.6 |
| LOCATION | In
Imperial County Near Brawley From 0.1 Km North Of Worthington
Road To 0.7 Km North Of Keystone Road. |
| DESCRIPTION | 4 Lane Expressway To Be Constructed. |
| ESTIMATE | $ 17,162,282.00 |
| ADVERTISE DATE | 05/21/01 |
| BID OPENING | 07/19/01 |
| FINAL POSTING | 07/18/01 @ 16:30 |
|
1
|
KIEWIT PACIFIC CO | $ 16,256,047.00 |
|
|
GRANITE CONST CO | $ 16,776,667.00 |
|
|
E L YEAGER CONST CO | $ 18,188,056.00 |
The Caltrans District 11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered. Planholders for that Contract,
but reserves the right to not answer any questions deemed unsatisfactory
for public viewing.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
06/22/01 |
07/11/01 |
|
|
|
Inquiry |
|
Q: 05/21/01
|
When will the cross sections be available
and where?
or through: MESA
BLUEPRINT
|
|
Q:05/24/01
|
Plan Sheet /
Specification Reference=Item 28, Roadway Excavation, Special Provision
Section 10-1.30
The referenced section includes "foundation treatment of 0.9M" wherein 0.6M is to be removed and 0.3M is to be treated and compacted in place. What depth of is to measured for payment, 0.6M or 0.9M?
|
|
Q:05/24/01 R:06/22/01 |
Plan Sheet / Specification Reference=Item
28, Roadway Excavation, Special Provision Section 10-1.30
There is no item nor Spec Section for "Ditch Excavation". The plans and sections depict a ditch alongside the roadway that is 2.4M wide at the bottom. The Standards provide that the excavation required to construct a ditch with a bottom width of less than 4 meters will be classed as ditch excavation. Why isn't this work classed as "Ditch Excavation"?
and gutters between the roadbed shoulder and an adjacent excavation slope, and gutters in excavation benches, and side gutters contiguous to embankment slopes, all as shown on the plans, will be paid for as roadway excavation and payment will not be made as ditch excavation for that work.
|
|
Q:05/24/01 R:06/22/01 |
Plan Sheet /
Specification Reference=Item 28, ROADWAY EXCAVATION, FOUNDATION TREATMENT
The job cross-sections indicate that the 0.9M depth of foundation treatment can be "superseded" by the structural section if the fill from o.g. to f.g. is something less than the thickness of the structural section. In such cases, the "foundation treatment" could be only or few millimeters or even nil. Is this true? Is this what is required/desired/intended?
|
|
Q: 05/29/01
|
Where can we get full size plans?
or through: MESA
BLUEPRINT
|
|
Q:07/05/01 R:07/11/01 |
Plan Sheet /
Specification Reference=Item 33 CLASS 5 AGGREGATE SUBBASE & SECTION
10-1.35
What is the reason for requiring subbase be obtained from commercial sources only?
|
|
Q:07/06/01 R:07/11/01 |
Plan Sheet /
Specification Reference=Item 40 CONCRETE PAVEMENT & Item 41 CONCRETE
PAVEMENT (TRANSVERSE DOWELS)
The bid quantities for PCCP do not appear to have included any PCCP under the AC Dike locations.
|
|
Q:07/06/01 R:07/11/01 |
Plan Sheet /
Specification Reference=Item 40 CONCRETE PAVEMENT & Item 41 CONCRETE
PAVEMENT (TRANSVERSE DOWELS)
Will PCCP be required
under the AC Dikes?
|
|
Q:07/09/01 R:07/17/01 |
Plan Sheet / Specification Reference=Item
# 40 & 41 Concrete pavement, Special Provision Sections 5-1.16 areas
for contractor use
Will a batch plant be allowed on site?
|
|
Q:07/11/01 R:07/12/01 |
Plan Sheet /
Specification Reference=#8 TEMPORARY CONSTRUCTION ENTRANCE, SHEET #WP-1,
SPECIAL PROV. SECTION 10-1.06
PURSUANT TO THE SHEET #WP-1, WILL THE PERSPECTIVE VIEW GOVERN (i.e. 4-STEEL PLATES PER LOCATION) OR THE PLAN VIEW (i.e. 6 STEEL PLATES PER LOCATION)?
|
OTHER
LINKS OF INTEREST
DISTRICT
11 CONSTRUCTION BIDDER'S INQUIRIES & RESPONSES
DEPARTMENT
OF TRANSPORTATION
DISTRICT
11 CONSTRUCTION HOMEPAGE
CALTRANS
OFFICE ENGINEER: Contract Advertisement, Special Provisions, Plan Holders,
Contract Awards, etc.