| CONTRACT NO: | 11-172824 |
| ROUTE / KP | 11-SD-56-2.9/10.6 |
| LOCATION | In San Diego County In San Diego From Carmel Country Road Overcrossing To Carmel Mountain Road Overcrossing. |
| DESCRIPTION | Construct 4-Lane Freeway, Water & Sewer Mains And Bridges. |
| ESTIMATE | $ 60,058,000.00 |
| ADVERTISE DATE | 04/22/02 |
| BID OPENING | 06/20/02 |
| FINAL POSTING | 06/19/02 @ 17:00 |
|
|
FCI CONSTRUCTORS/ WR CONNELLY - JV | $ 41,087,083.20 |
|
|
SUKUT / CC MEYERS
- JV |
$ 42,510,824.90 |
|
|
EL YEAGER | $ 42,647,156.15 |
|
|
ERRECA'S /HANSON | $ 44,490,940.00 |
|
|
KIEWIT PACIFIC | $ 44,764,000.00 |
|
|
S P RADOS | $ 46,435,114.00 |
|
|
HERZOG / RE MONK | $ 49,899,526.00 |
The Caltrans District 11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that Contract,
but reserves the right to not answer any questions deemed unsatisfactory
for public viewing.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
|
index sheets |
|
|
| INFORMATION
AVAILABLE FROM THE CITY OF SAN DIEGO
The following books are available by request to registered planholders for this project, please contact our office to obtain copies. 1) "GREENBOOK" Standard Specifications for Public Works Construction - 2000 Edition. 2) 2000 REGIONAL SUPPLEMENT AMENDMENTS TO "GREENBOOK 2000" Standard Specifications for Public Works Construction - 2000 Edition. 3) CITY OF SAN SUPPLEMENT AMENDMENTS. 4) Rules and Regulations for Reclaimed Water Use and Distribution within the City of San Diego. 5) Recycled Water Plan Check and Inspection Manual. |
|
06/05/02 |
06/11/02 |
|
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
Q:04/22/02 R:04/22/02 |
Plan Sheet /
Specification Reference=
Is there a local printing firm to order full size plans from?
5560 Ruffin Road Suite 5 San Diego, CA 92123 (858) 541-1500 FAX (858) 278-0558 e-mail to plot@mesablueprint.com |
|
Q:04/22/02 R:05/24/02 |
Plan Sheet /
Specification Reference=NOTICE TO CONTRACTORS
When will the cross sections be available and where?
MESA BLUEPRINT
|
|
Q:04/29/02 R:05/02/02 |
Plan Sheet /
Specification Reference=
We have just begun to work on the above project plans. The print quality is very poor. Typically the planned work is shown with average quality, but the existing layout is extremely faded. When will you have some corrected copies to replace the illegible ones? Thank you for your help.
Plan sheets 15 - 40, 411 - 443, 637 - 639, 660 - 668, 689 - 691, 729 - 732, 751 - 754, 771 - 773, 817 - 823, 848 -852. |
|
Q:05/01/02 R:06/06/02 |
Plan Sheet /
Specification Reference=Typical Sections/ Layouts
On X - 2, is the intent for the section on the Eastbound Lanes to be typical section 1?
|
|
Q:05/01/02 R:06/03/02 |
Plan Sheet /
Specification Reference=Typical Sections/ Layouts
The Eastbound HSSD on X - 2, starts at sta. 48+60.00. On L - 4, the HSSD actually starts at Sta. 47+23.00. Which is correct?
|
|
Q:05/01/02 R:06/03/02 |
Plan Sheet /
Specification Reference=Typical Sections/ Layouts
None of the layout drawings are labeled with the Typical Structural Sections. This makes matching the stationing extremely difficult. Will new plans be issued to accommodate the sections?
|
|
Q:05/01/02 R:06/03/02 |
Plan Sheet /
Specification Reference=Typical Sections/ Layouts
Typical section 14 at Sta. 46+32.338 is not shown on the layout drawings.
|
|
Q:05/07/02 R:06/03/02 |
Plan Sheet /
Specification Reference= Special Provisions Section 10-1.195 ELECTRONIC
MOBILE DAILY DIARY SYSTEM DATA DELIVERY
Please provide us with a hardware and software supplier that we can price and then get equivalent proposals with the specifications provided. We understand the sole source politics. We just need a place to start. Thank you for your assistance.
|
|
Q:05/10/02 R:05/21/02 |
Plan Sheet /
Specification Reference= CROSS SECTIONS
Could we obtain digital files for the grading? Could you zip and e-mail them ASAP?
|
|
Q:05/10/02 R:06/05/02 |
Plan Sheet /
Specification Reference=Plan Sheet 775 of 856
The quantities shown for Concrete Barrier Type 25 appears incorrect, please verify.
|
|
Q:05/13/02 R:06/12/02 |
Plan Sheet /
Specification Reference=
Where is the pay items for the Type
25BP732 or 25BP735?
|
|
Q:05/13/02 R:05/22/02 R:06/03/02 |
Plan Sheet /
Specification Reference=Item 52, Roadway Excavation, section 10-1.39
What is the nature of the unsuitable material, requiring offsite disposal? We need the available information to determine how to properly dispose of it.
|
|
Q:05/15/02 R:06/08/02 |
Plan Sheet / Specification Reference=
Is it possible to include or substitute the following gages and coating to the bituminous coating for the following bid items? Bid Item 147: 600 mm Polymeric sheet or
Aluminized Type 2 coated, 68 mm x 13 mm corrugations (1.63 mm thick)
Can SRP with Polymeric sheet or Aluminized Type 2 coating be an alternative pipe for RCP- Bid Items #141 to #146 ? SRP has Manning’s n = .013 per Table 851.2 (HDM). OTHER QUESTIONS:
|
|
Q:05/16/02 R:06/08/02 R:06/11/02 |
Plan Sheet / Specification Reference=Section
10-4 Relocation of Utility Facilities. BACKFILL.
Gradation Chart (attached) appears to be in error. If correction to this chart is necessary please check to see that the specified material is available locally.
Sieve Size Percent passing By weight 12 mm 100 9.5 mm 90-100 4.75 mm 50-100 2.37 mm 10-60 600 µm 25-60 75 µm 0-12
|
|
Q:05/17/02 R:05/22/02 |
Plan Sheet / Specification Reference=Item
52: Roadway Excavation
I have asked this question before, but
do not see it posted or answered. Is it possible to get the contour
grading sheets (both original ground and design grades) in electronic format?
If we could get this information in microstation, autocad or dxf format,
we could generate our mass haul diagram from this data vs having to digitize
in all of the cross-sections for the job.
|
|
Q:05/20/02 R:05/24/02 |
Plan Sheet /
Specification Reference=Item 62: Imported Topsoil
You list the quantities for this item by station-cut/fill (Q-11). Yet no detail can I find other than that on sheet (D-114), for the grass lined ditch. That doesn't account for the total quantity. Where does the rest of it go, or is the item quantity a bust?
|
|
Q:05/22/02 R:05/24/02 R:06/10/02 |
Plan Sheet /
Specification Reference=Item 209: ALUMINUM BRIDGE RAILING
Section 10-1.86 ALUMINUM BRIDGE RAILING quotes are guaranteed prices till 01/31/03, but orders cannot be placed before then. Can the prices be guaranteed until the bridges are completed.
|
|
Q:05/28/02 R:05/28/02 |
Plan Sheet /
Specification Reference=Item 62: IMPORTED TOPSOIL
The bid item for imported topsoil requires that it be placed on both serrated and non-serrated slopes. What thickness is required, and is this material figured into the overall earthwork calculations?
|
|
Q:05/28/02 R:06/19/02 |
Plan Sheet / Specification Reference=
Does trucking for imported material from a site not designated by the State require payment of prevailing wage?
|
|
Q:05/28/02 R:06/19/02 |
Plan Sheet / Specification Reference=
Does disposal of materials offsite require prevailing wages?
|
|
Q:05/28/02 R:06/11/02 |
Plan Sheet /
Specification Reference=Item 59: LEAN CONCRETE BACKFILL
Is there a specification for lean concrete backfill, please clarify.
|
|
Q:05/31/02 R:06/08/02 R:06/17/02 |
Plan Sheet / Specification Reference=Item
#81 - Water Meter 7ea
Per spec provisions page 233, is the $25,000 fee for each water meter or for all seven?
|
|
Q:05/31/02 R:06/10/02 |
Plan Sheet /
Specification Reference=Plan Sheet 314
The reinforcing mesh shown on sheet 314 for use in the concrete ditch lining converts to 6" X 6" - 6ga X 6ga, 6 ga size is too large for this application and would have to be bent to shape in a fabrication shop. The standard mesh used in the past for these ditches has been 6" X 6" - 10ga X 10 ga (Metric 150 X 150- MW9XMW9). Is this a conversion error, please clarify.
|
|
Q:06/03/02 R:06/17/02 |
Plan Sheet / Specification Reference=ITEM
151: and ITEM 152:
THERE IS NO TYPICAL SECTION FOR THE
200 mm UNDERDRAINS EXCEPT THE STANDARD PLANS D-102, WHICH SHOWS A VARIABLE
HEIGHT OF EXCAVATION & PERMEABLE MATERIAL MEASURED FROM THE INVERT
OF THE PIPE TO THE GRADING PLANE (inside subgrade area) AND 150 mm FROM
ORIGINAL (outside subgrade area). FILL DEPTHS WHERE THESE UNDERDRAINS ARE
REQUIRED RANGES FROM 3 meter to 15 meter.
|
|
Q:06/03/02 R:06/03/02 |
Plan Sheet /
Specification Reference=ITEM 62 IMPORTED TOPSOIL.
THE SITE IS PRIMARILY A FARMLAND. COULD WE POSSIBLY USE THE USABLE EXISTING TOPSOIL IN LIEU OF IMPORTING THE MATERIAL?. HOW THICK IS THE TOPSOIL REQUIRED?
|
|
Q:06/03/02 R:06/17/02 |
Plan Sheet / Specification Reference=Plans,
Drainage Quantities, Note 1.
Where do we find specifications for Soil Tight Joints for RCP and CMP
|
|
Q:06/05/02 R:06/06/02 |
Plan Sheet /
Specification Reference=Sheet X-2, East Bound Lane Typical Section
Previously question # 4 asked if "On X-2, is the intent for the section on the Eastbound Lanes to be typical section 1?" You're response was "No". Our sheet X-2 does indicate typical section 1 for the traveled way as well as for the shoulder area. What is the correct typical section for Eastbound Lanes on sheet X-2 and is the shoulder area to be the same as the traveled way as currently indicated?
|
|
Q:06/06/02 R:06/06/02 |
Plan Sheet /
Specification Reference=Addendum #1
JUST REC'D ADDENDUM 1. ON THE PLAN SHEETS LISTED REVISED, SHEET #S 230,234,241 & 242 WERE NOT INCLUDED IN THE PACKAGE. HAVE THESE SHEETS BEEN REVISED?
|
|
Q:06/06/02 R:06/10/02 |
Plan Sheet /
Specification Reference=Item # 147 and #157, 600mm Bituminous Coated Corrugated
Steel Pipe (3.51mm thick)
Can 600mm Bituminous Coated Corrugated Steel Pipe 2.77mm thick be substituted for these bid items?
|
|
|
|
|
Q:06/07/02 R:06/13/02 |
Plan Sheet / Specification Reference=Item
#92, Concrete Pavement, Special Provision Section 10-1.54 Materials
On page 179 of the Specifications, "The concrete shall contain a minimum of 350 kg of portland cement per cubic meter." Should this be 350 kg of cementitious material per cubic meter?
|
|
Q:06/07/02 R:06/07/02 R:06/11/02 |
Plan Sheet /
Specification Reference=Addenda No. 1
The structural plans do not show any apparent changes, please clarify what changed.
|
|
Q:06/11/02 R:06/12/02 |
Plan Sheet /
Specification Reference=Item 86 & 91
Prior to installation of the ATPB on top of the 45mm layer of Type A Asphalt, does the surface of the Type A receive Asphalt Binder?
|
|
Q:06/18/02 R:06/19/02 |
Plan Sheet / Specification Reference=Special
Provisions section 10-1.55, Load Test Piles, page 184.
Will the State be providing the hydraulic bladder?
|
|
Q:06/19/02 R:06/19/02 |
Plan Sheet / Specification Reference=CONTRACT
ITEMS 207 / 208:, SPECIAL PROVISIONS SECT 10-1.82 AND 10-1.83;PLAN SHEETS
489, 122, AND VARIOUS LAYOUT SHEETS E.G. SH 19 AND 21.
REF ITEM 207 AND SPEC PROV. 10- 1.82 AND 83- THERE IS A SEPARATE PAY ITEM FOR GUARD RAIL DELINEATORS, YET THE SPEC PROV NOTE THESE AS INCLUDED WITH PAYMENT FOR ITEM 208. CLARIFY PLEASE.
|
|
Q:06/19/02 R:06/19/02 |
Plan Sheet / Specification Reference=CONTRACT
ITEMS 207 / 208:, SPECIAL PROVISIONS SECT 10-1.82 AND 10-1.83;PLAN SHEETS
489, 122, AND VARIOUS LAYOUT SHEETS E.G. SH 19 AND 21.
BY CALCULATING THE TYPE 2A MOD FLARES
SHOWN ON SHEET 122, AND COMPARING THE "PAY" LENGTHS FOR MBGR RUNS SHOWN
ON SHEET 489, IT APPEARS THAT THE LENGTH OF "BACK RAIL" ( L1 ON SHEET 122)
IS MEASURED AND PAID FOR ALONG THE FACE OF THE " BACK RAIL".THIS IS ALSO
PER STD SPEC SECT 83-1.03 PARAGRAPHS 2 & 5.
|
|
Q:06/19/02 R:06/19/02 |
Plan Sheet / Specification Reference=Section
68-1and 11,220 feet of 6" pipe perforated , 8,300 feet of 8" pipe perforated