| CONTRACT NO: | 11-403304 |
| ROUTE / PM | 11-SD-5-R22.3 |
| LOCATION | In San Diego County In San Diego At Clairemont Drive Overcrossing. |
| DESCRIPTION | Clean Bridge Deck And Treat With Polyester Concrete And Methacrylate. |
| ESTIMATE | $520,000 |
| WORKING
DAYS |
65 |
| ADVERTISE DATE | 08/15/2011 |
| BID OPENING | 09/15/2011 |
| FINAL
POSTING |
09/14/2011@ 15:30
|
The Caltrans District
11 Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11 Duty Senior telephone number is (619) 688-6635. Please
submit all inquiries in the proper format by fax to (619) 688-6988 or
e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract, are not a part of the contract and are provided for the
bidder's convenience only. In some instances, the question and answer
may represent a summary of the matters discussed rather than a
word-for-word recitation. The responses may be considered along with
all other information furnished to prospective bidders for the purpose
of bidding on the project. The availability or use of information
provided in the responses to bidder' inquiries is not to be construed
in any way as a waiver of the provisions of Section 2-1.03 of the
Standard Specifications or any other provision of the contract, the
plans, Standard Specifications or Special Provisions, nor to excuse the
contractor from full compliance with those contract requirements.
Bidders are cautioned that subsequent responses or contract addenda may
affect or vary a response previously given.
Caltrans District 11 Construction
Department has developed this method of answering Bidder's Inquiries to
better serve the needs of the Contractors who bid on our Projects.
Caltrans District 11 Construction Department will post all of the
questions submitted by any of the contractors that are registered
Planholders for that Contract, but reserves the right to not answer any
questions deemed unsatisfactory for public viewing.
The BIDDER'S
INQUIRIES & RESPONSES will be updated continuously and all attempts
will be made to do the final posting by 15:00 on the day prior to the
bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
ORDERING
PROJECT PLANS AND SPECIFICATIONS
ADDENDUM
|
|
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1 Q:09/01/11 |
Plan Sheet / Specification Reference=Spec Provision Section 10-1.07 "Maintaining Traffic", & 10-1.16 "Existing Highway Facilities, Remove Concrete Deck Surface" Question=Hydro demolition is not compatible with polyester concrete when sequenced during a single closure. Water used in hydro demolition causes significant adhesion degradation and poor cure properties of PPC. Would the state consider other methods of deck removal to complete the project in specified time frames?
|
2 Q:09/13/11 |
Plan Sheet / Specification Reference= Spec Provision Section 10-1.16 "Existing Highway Facilities, Remove Concrete Deck Surface" Question= Shotblasting is an unnecessary procedure after hydrodemolition has occurred. The deck is clean of all laitance, contaminants and foreign material if hydrodemolition is done correctly; furthermore, shotblasting on an uneven surface as is left after hydrodemo is inefficient and unnecessary; please confirm.
|
OTHER LINKS OF INTEREST
DISTRICT 11 CONSTRUCTION
BIDDER'S INQUIRIES & RESPONSES
DISTRICT 11 HOMEPAGE
CALTRANS OFFICE ENGINEER:
Contract Advertisement, Special Provisions, Plan Holders, Contract
Awards, etc.
DEPARTMENT OF TRANSPORTATION