| CONTRACT NO: | 11-261514 |
| ROUTE / KP | 11-Imp-8-R31.3 |
| LOCATION | In Imperial County Near El Centro At Sunbeam Rest Areas (Eastbound And Westbound) |
| DESCRIPTION | Install Sewage Treatment System |
| ESTIMATE | $840,000 |
| WORKING
DAYS |
430 Working Days |
| ADVERTISE DATE | 03/22/2010 |
| BID OPENING | 04/29/2010 |
| FINAL POSTING |
04/26/2010 @ 08:46
|
The Caltrans District
11 Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11 Duty Senior telephone number is (619) 688-6635. Please
submit all inquiries in the proper format by fax to (619) 688-6988 or
e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract, are not a part of the contract and are provided for the
bidder's convenience only. In some instances, the question and answer
may represent a summary of the matters discussed rather than a
word-for-word recitation. The responses may be considered along with
all other information furnished to prospective bidders for the purpose
of bidding on the project. The availability or use of information
provided in the responses to bidder' inquiries is not to be construed
in any way as a waiver of the provisions of Section 2-1.03 of the
Standard Specifications or any other provision of the contract, the
plans, Standard Specifications or Special Provisions, nor to excuse the
contractor from full compliance with those contract requirements.
Bidders are cautioned that subsequent responses or contract addenda may
affect or vary a response previously given.
Caltrans District 11 Construction
Department has developed this method of answering Bidder's Inquiries to
better serve the needs of the Contractors who bid on our Projects.
Caltrans District 11 Construction Department will post all of the
questions submitted by any of the contractors that are registered
Planholders for that Contract, but reserves the right to not answer any
questions deemed unsatisfactory for public viewing.
The BIDDER'S
INQUIRIES & RESPONSES will be updated continuously and all attempts
will be made to do the final posting by 15:00 on Wednesday prior to the
bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
ORDERING
PROJECT
PLANS
AND
SPECIFICATIONS
ADDENDUM
|
|
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1 Q:04/06/10 |
Plan Sheet / Specification Reference= SS1-7, Detail 1 Recirculating Sand Filter Section / Recirculating Sand Filter System, Pg 105 "Risers"
|
|
2 Q:04/06/10 |
Plan Sheet / Specification Reference= EE1-3, 4,& 6 Front view, Side View (no shade or cover) / Pg 123 of the Special Provision, Installation "Control Panel mounted at location shown on plans....." no mention of installing shade or kiosk or cover.
|
|
3 Q:04/06/10 |
Plan Sheet / Specification Reference=SS1-7, Detail 5 Automatic Distributing Valve. / Pg 105 para 6 "Recirculating Sand Filtration System" of the Special Provision.
|
|
4 Q:04/08/10 |
Plan Sheet / Specification Reference= Item #23, Building Work, Contract Plan Sheet #43 (SS1-4), Spec.Provision Sect.12-2.06.(Resubmittal from 02Apr10).
|
|
5 Q:04/08/10 |
Plan Sheet / Specification Reference= Item #23, Building Work, Pg.94 of of the Special Provisions, Sect.12-2.05 of same. (Resubmittal from 02Apr10).
|
|
6 Q:04/13/10 |
Plan Sheet / Specification Reference= 12-11.01 EFFLUENT TURBINE DUPLEX FILTERED PUMP SYSTEM " 1. The float switch S-1.....float de-energizes pumps P1 and P2 in the westbound septic tank and both urine septic tanks."
|
|
7 Q:04/22/10 |
Plan Sheet / Specification Reference=Due Date, April 29, 2010
|
| 8 Q:04/23/10 R:04/26/10 |
Plan Sheet / Specification
Reference= Bid Items, #8, 9 &10 and #23 Question= The access ramps East & Westbound are already closed. Will the exisiting closure & traffic control measures be removed at the start of this contract?. Will the contractor have to provide replacement signs for the duration of the construction(180 days)in both directions? Bid Item #10 specifies only 1 Portable Message sign, is this the only one required?
Are any Plastic traffic Barrels included in the scope of work, since there is no line items for them, but they are described in the plans & specs.
Please confirm that the exisitng pipes under the Fwy are adequate and will be used for the new construction without additonal sleeves being required.
|
OTHER LINKS OF INTEREST
DISTRICT 11 CONSTRUCTION
BIDDER'S INQUIRIES & RESPONSES
DISTRICT 11 HOMEPAGE
CALTRANS OFFICE ENGINEER:
Contract Advertisement, Special Provisions, Plan Holders, Contract
Awards, etc.
DEPARTMENT OF TRANSPORTATION